Save this project to account
New ApplicationPre-decision · not yet granted

Infrastructure, Ballybrittas, Co. Laois, Co. Laois

Ballybrittas, Laois · Laois County Council · Plan 2660583 · PB ref PB-3524258260

1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at...

Indicative value €3m–10m PB indicative band
Units applied for Not listed public application record
Floor area 3,058 m² published reliable figure
Received 27 Aug 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

A decision-stage public state is indexed. / Confidence: Low
Decision N/A

A decision-stage public state is indexed.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hardstanding area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste...

Ref 2660583 Source-linked Official application description for exact planning reference 2660583

Public source roles

Arkil (Civil) Ltd (Trading As Killeen Civil Engineering)
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Laois County Council
Exact reference
2660583
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2660583Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2660583Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2660583Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Arkil (Civil) Ltd (Trading As Killeen Civil Engineering)
Planning agent
Donna Ryan
Agent address
Cashel Portlaoise Co. Laois R32 YP0N
Official description

Application text

1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hardstanding area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste (principally solid / reinforced concrete, bricks, ceramics and solid bituminous waste mixtures) using mobile crushing and screening equipment to produce recycled (secondary) aggregate and the use of surrounding hardstanding areas for the external handling and storage of both unprocessed C&D wastes and recycled aggregates. 3. The construction of a portal frame building with roof-mounted solar panels (3,058 m²), (which will accommodate a workshop, offices and staff welfare facilities) with external provision of staff and visitor car-parking and bicycle parking on a concrete paved area to the south-west of the site; 4. Upgrading of the existing site entrance from the R445 Regional Road and internal access road into the site to provide a secure access point and provision of a weighbridge / site office, and wheelwash to facilitate the proposed development; 5. The provision of surface water management infrastructure for the office and concrete paved area to the south-west of the site, including silt traps and hydrocarbon interceptor (Full flow treatment system) attenuation pond for storm runoff, flow control device from Attenuation Pond and and all associated drainage works. 6. Provision of a foul wastewater treatment system at the site to treat all wastewater(s); 7. Landscaping including boundary treatment and fencing and internal hard and soft landscaping at the hardstand areas and proposed building. 8. All ancillary site development works to facilitate the proposed development, including water services, utilities, lighting and other associated infrastructure works and services. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660583

1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hardstanding area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste (principally solid / reinforced concrete, bricks, ceramics and solid bituminous waste mixtures) using mobile crushing and screening equipment to produce recycled (secondary) aggregate and the use of surrounding hardstanding areas for the external handling and storage of both unprocessed C&D wastes and recycled aggregates. 3. The construction of a portal frame building with roof-mounted solar panels (3,058 m²), (which will accommodate a workshop, offices and staff welfare facilities) with external provision of staff and visitor car-parking and bicycle parking on a concrete paved area to the south-west of the site; 4. Upgrading of the existing site entrance from the R445 Regional Road and internal access road into the site to provide a secure access point and provision of a weighbridge / site office, and wheelwash to facilitate the proposed development; 5. The provision of surface water management infrastructure for the office and concrete paved area to the south-west of the site, including silt traps and hydrocarbon interceptor (Full flow treatment system) attenuation pond for storm runoff, flow control device from Attenuation Pond and and all associated drainage works. 6. Provision of a foul wastewater treatment system at the site to treat all wastewater(s); 7. Landscaping including boundary treatment and fencing and internal hard and soft landscaping at the hardstand areas and proposed building. 8. All ancillary site development works to facilitate the proposed development, including water services, utilities, lighting and other associated infrastructure works and services. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.

AuthorityLaois County Council
Reference2660583
StatusChecked 26 Sep 2026
Open official record