Infrastructure, Nure townland, Lurganboy, Co. Leitrim
The proposed development will consist of the following: 1) Continued use of the existing operational quarry (3.4ha) (granted under Plan File Ref. No. 20140). 2) Recommencement of extraction of a partially extracted area previously authorised under SU0057 (3.9 ha) to a final floor level of 148 mOD. 3) Recommencement of use for...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 11 Feb 2026. / Confidence: LowDecision date 11 Feb 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The proposed development will consist of the following: 1) Continued use of the existing operational quarry (3.4ha) (granted under Plan File Ref. No. 20140). 2) Recommencement of extraction of a partially extracted area previously authorised under SU0057 (3.9 ha) to a final floor level of 148 mOD. 3) Recommencement of use for stockpiling of the remainder of the historic quarry floor (2.9 ha) previously authorised under plan ref. SU0057. 4) Lateral extension of the existing quarry including extraction of rock and...
Named firms
Public source roles
- David K. Trotter & Sons Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Leitrim County Council
- Exact reference
- 2560303
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- David K. Trotter & Sons Ltd
- Planning agent
- Peter Kinghan
- Agent address
- Unit 3 Cedar Crescent Westport Co. Mayo F28PN47
More Leitrim planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The proposed development will consist of the following: 1) Continued use of the existing operational quarry (3.4ha) (granted under Plan File Ref. No. 20140). 2) Recommencement of extraction of a partially extracted area previously authorised under SU0057 (3.9 ha) to a final floor level of 148 mOD. 3) Recommencement of use for stockpiling of the remainder of the historic quarry floor (2.9 ha) previously authorised under plan ref. SU0057. 4) Lateral extension of the existing quarry including extraction of rock and all associated facilities/works over an area of c. 2 ha to a final floor level of 148 mOD. 5) The continuation of use of an existing pre-cast concrete manufacturing building, concrete batching plant, machine storage building and existing yard area (Granted under Plan File Ref. No. 21251). 6) Continuation of use of the existing settlement lagoons granted under Plan File Ref. No. 20140. 7) Construction of two new buildings: - Building 1 (1,595 m²): A shed to enclose the existing pre-stressed beds/moulds, complete with a store. - Building 2 (85 m²): Incorporating a store for two items of equipment associated with block making, compressor house, and substation with switch room for 3-phase supply, to be located adjacent to the existing ready-mix plant. 8) Importation of sand for use in concrete manufacturing. 9) Import approx. 70,000m3 (c. 125,000 tonnes) of Article 27 clean, uncontaminated soil and stone byproduct (a non-EIA scheduled activity that does not require waste authorisation), to construct a screening berm to the south of the extraction area and to restore part of the application area following the completion of extraction. 10) All related ancillary development and associated site facilities/works including processing (crushing, screening and washing) and stockpiling of materials; workshop, site office, block yard, and all other related activities. The proposed development is within an overall application area of c.20 hectares and is for a total period of 25 years, with an additional 2 years for final site restoration
Application to site progress
-
Applied 11 Dec 2025 2560303
-
Decision Conditional 11 Feb 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560303
The proposed development will consist of the following: 1) Continued use of the existing operational quarry (3.4ha) (granted under Plan File Ref. No. 20140). 2) Recommencement of extraction of a partially extracted area previously authorised under SU0057 (3.9 ha) to a final floor level of 148 mOD. 3) Recommencement of use for stockpiling of the remainder of the historic quarry floor (2.9 ha) previously authorised under plan ref. SU0057. 4) Lateral extension of the existing quarry including extraction of rock and all associated facilities/works over an area of c. 2 ha to a final floor level of 148 mOD. 5) The continuation of use of an existing pre-cast concrete manufacturing building, concrete batching plant, machine storage building and existing yard area (Granted under Plan File Ref. No. 21251). 6) Continuation of use of the existing settlement lagoons granted under Plan File Ref. No. 20140. 7) Construction of two new buildings: - Building 1 (1,595 m²): A shed to enclose the existing pre-stressed beds/moulds, complete with a store. - Building 2 (85 m²): Incorporating a store for two items of equipment associated with block making, compressor house, and substation with switch room for 3-phase supply, to be located adjacent to the existing ready-mix plant. 8) Importation of sand for use in concrete manufacturing. 9) Import approx. 70,000m3 (c. 125,000 tonnes) of Article 27 clean, uncontaminated soil and stone byproduct (a non-EIA scheduled activity that does not require waste authorisation), to construct a screening berm to the south of the extraction area and to restore part of the application area following the completion of extraction. 10) All related ancillary development and associated site facilities/works including processing (crushing, screening and washing) and stockpiling of materials; workshop, site office, block yard, and all other related activities. The proposed development is within an overall application area of c.20 hectares and is for a total period of 25 years, with an additional 2 years for final site restoration
Open official record