Save this project to account
Back to leads
Commencement

~167 dwellings, Limerick, Limerick - Planning Application 23557

Limerick / Limerick / Limerick, Limerick

Est. value Not listed
Units 167
Floor area Not listed
Commenced 4 Sep 2025

Source-linked planning record

~167 dwellings, Limerick, Limerick - Planning Application 23557

Limerick / Limerick / Limerick, Limerick
PB ref
PB-475946
Plan ref
23557
Authority
Limerick City and County Council
Stage / date
Commencement / 4 Sep 2025
Est. value band
Value not disclosed
Units / floor
167
Project class
Protected structure
Promoter
Tribeca Asset Management Ltd
Architect / agent
Monami Construction

Source: https://eplanning.ie/LimerickCCC/AppFileRefDetails/23557/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Application reference
23557
Applicant
Tribeca Asset Management Ltd
Agent
Monami Construction
Decision stage
Commencement
Commenced
4 Sep 2025
Units
167
Builder / developer
Monami Construction

Official description

Verbatim source text

Large-Scale Residential Development (LRD) Application. Tribeca Asset Management Limited (trading as Tribeca Holdings) intends to apply for planning permission for a Large-Scale Residential Development (LRD) at this site: Ardhu House, Ennis Road, Roses Avenue and North Circular Road, Limerick. Ardhu House is a Protected Structure, RPS Reg. No. 3281 (Former Limerick Ryan Hotel, Ennis Road, Roses Avenue). The application site includes an area of public road/footpaths to facilitate a watermain diversion via North Circular Road, Roses Avenue and Ennis Road. The development site area and watermain diversion works provide a total planning application site area of 2.19 hectares approx. The site is bound by Ennis Road (R857) to the north, Roses Avenue (L10053) to the west, North Circular Road (L10059) to the south-east, residential properties at The Elms to the south and the Woodfield House Hotel, Bar & Restaurant commercial property to the west. This proposed development will replace all un-built and incomplete elements of the development permitted under the planning permission Register Reference 15/645, An Bord Pleanála Reference PL 91.246960 (extended under Register Reference 21/7025). The un-built and incomplete elements to be replaced comprise (i) the change of use of Ardhu House from commercial use to residential use to provide 4 no. apartments (i) the demolition of extensions to the front, rear and side of Ardhu House (i) the construction of 7 no. detached two-storey dwelling houses (iv) vehicular access via the existing entrance on Roses Avenue (v) internal roadways, surface car parking, cycle parking, driveways and entrances (vi) service connections and (vi) ancillary site development, landscaping and boundary treatment works. In summary, the proposed development will consist of the construction of 167 no. new residential units in 5 new residential buildings ranging in height from 3 storeys to 5 storeys (Blocks 01, 02, 03, 04 and 05), a creche; the refurbishment of Ardhu House (Protected Structure RPS Reg. No. 3281) to provide ancillary residential amenity uses, and the refurbishment of the Ardhu Bar licenced premises. The refurbishment of Ardhu House and Ardhu Bar will entail the demolition of modern extensions to each building. The detailed description of the proposed development is as follows: (1) Block 01 is a 5-storey building comprising 46 apartments with 17 no. 1-bed units and 29 no. 2-bed units. Private balconies/terraces for the apartments are pro

Verify against official source

Project team

Named source parties

Promoter
Tribeca Asset Management Ltd
Planning agent
Monami Construction
Builder / developer
Monami Construction

Lifecycle timeline

Application to site progress

  1. Applied

    17 Nov 2023 23557
  2. Decision

    Conditional 19 Apr 2024
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    4 Sep 2025 Work started · phase 1 · New 5 storey apartment building with a ground floor creche Notice re-filed 17 Oct 2025, 24 Nov 2025, 15 Jan 2026 for the same works.
  5. Commenced

    4 Sep 2025 Work started · phase 2 · New 5 storey apartment building Notice re-filed 17 Oct 2025, 24 Nov 2025, 15 Jan 2026 for the same works.
  6. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceConservation specialistFire SafetyHealth & SafetyPlanner/ConsultantSecurity
Board this lead Create alert