Infrastructure, Unit Nos 12E and 12F Ashbourne Business Park, Killegland, Ashbourne
the items which Planning Retention apply are as follows: I. Alterations to Unit 12E: 1. Ground Floor: Change of use of 4 m² of warehouse floor area to office floor area, 5rn2 of warehouse area to staff facilities & 60 m² of warehouse area to ESB Substation floor area due to relocating a standalone substation into Unit 12E. 2...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 9 May 2025. / Confidence: LowDecision date 9 May 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the items which Planning Retention apply are as follows: I. Alterations to Unit 12E: 1. Ground Floor: Change of use of 4 m² of warehouse floor area to office floor area, 5rn2 of warehouse area to staff facilities & 60 m² of warehouse area to ESB Substation floor area due to relocating a standalone substation into Unit 12E. 2. First Floor: Internal layout adjustments resulting in an overall reduction of 3rn2 of office area & reduction of 11 m² of staff facilities area. 3. Second Floor: Change of use of 10 m² of...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 24381
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the items which Planning Retention apply are as follows: I. Alterations to Unit 12E: 1. Ground Floor: Change of use of 4 m² of warehouse floor area to office floor area, 5rn2 of warehouse area to staff facilities & 60 m² of warehouse area to ESB Substation floor area due to relocating a standalone substation into Unit 12E. 2. First Floor: Internal layout adjustments resulting in an overall reduction of 3rn2 of office area & reduction of 11 m² of staff facilities area. 3. Second Floor: Change of use of 10 m² of staff facilities area to office area. 4. Elevational adjustments with no associated area change. 5. Addition of 3,891 m² of Solar PV Panels. II. Alterations to Unit 12F: 1. Addition of internal two storey steel mezzanine (2,112 m² total area). 2. Minor Elevational adjustments with no associated area change. 3. Addition of 170 m² of Solar PV Panels. III. Site Plan alterations: 1. Addition of an electric sliding gate & pedestrian gate at the main access to the development and associated extension of existing fence. 2. Addition of 1.5m high paladin fence to protect existing open water course and associated landscape alterations.3. Previously proposed fence and gate removed at HGV /car access at entrance of shared yard between units 12E & 12F removed and provision of additional carpark spaces in part of HGV Yard of Unit 12E. 4. Sprinkler tank & pumphouse relocated to South-West corner of the site and proposed adjacent fence extended to secure the full cul de sac turnabout. 5. ESB Substation relocated to the internal North-West comer of Unit 12E as per item 1.1 above. 6. Proposed fence at northern site boundary relocated from proposed location at centreline of existing hedgerow to facilitate retention of the existing hedgerow & 75m of previously proposed surface water culvert now constructed as open ditch upstream of remaining culvert as per granted planning permission. Carpark at Unit 12F rearranged due to this open ditch/culvert adjustment. 7. Associated site works and landscape adjustments. Note: All other details remain as per the granted applications Reg. Ref. 21/2042 & 22/1125.
Application to site progress
-
Applied 20 Sep 2024 24381
-
Decision Conditional 9 May 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 24381
the items which Planning Retention apply are as follows: I. Alterations to Unit 12E: 1. Ground Floor: Change of use of 4 m² of warehouse floor area to office floor area, 5rn2 of warehouse area to staff facilities & 60 m² of warehouse area to ESB Substation floor area due to relocating a standalone substation into Unit 12E. 2. First Floor: Internal layout adjustments resulting in an overall reduction of 3rn2 of office area & reduction of 11 m² of staff facilities area. 3. Second Floor: Change of use of 10 m² of staff facilities area to office area. 4. Elevational adjustments with no associated area change. 5. Addition of 3,891 m² of Solar PV Panels. II. Alterations to Unit 12F: 1. Addition of internal two storey steel mezzanine (2,112 m² total area). 2. Minor Elevational adjustments with no associated area change. 3. Addition of 170 m² of Solar PV Panels. III. Site Plan alterations: 1. Addition of an electric sliding gate & pedestrian gate at the main access to the development and associated extension of existing fence. 2. Addition of 1.5m high paladin fence to protect existing open water course and associated landscape alterations.3. Previously proposed fence and gate removed at HGV /car access at entrance of shared yard between units 12E & 12F removed and provision of additional carpark spaces in part of HGV Yard of Unit 12E. 4. Sprinkler tank & pumphouse relocated to South-West corner of the site and proposed adjacent fence extended to secure the full cul de sac turnabout. 5. ESB Substation relocated to the internal North-West comer of Unit 12E as per item 1.1 above. 6. Proposed fence at northern site boundary relocated from proposed location at centreline of existing hedgerow to facilitate retention of the existing hedgerow & 75m of previously proposed surface water culvert now constructed as open ditch upstream of remaining culvert as per granted planning permission. Carpark at Unit 12F rearranged due to this open ditch/culvert adjustment. 7. Associated site works and landscape adjustments. Note: All other details remain as per the granted applications Reg. Ref. 21/2042 & 22/1125.
Open official record