GrantedDecision recorded

Appeal/FI, Mill Road Colp West, Drogheda, County Meath

Drogheda, Meath · Meath County Council · Plan 2460133 · PB ref PB-10000338857

The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a...

Indicative value €30m+ PB indicative band
Units applied for Not listed public application record
Floor area 11,302 m² published reliable figure
Decision 15 Jan 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 15 Jan 2025. / Confidence: Low
Decision CONDITIONAL

Decision date 15 Jan 2025.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a Physical Education Suite including a Physical Education Hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 m² over 3 no. storeys. The proposal includes...

Ref 2460133 Source-linked Official application description for exact planning reference 2460133

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Meath County Council
Exact reference
2460133
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Appeal/FI

Appeal/FI

The public application record identifies appeal/fi in the submitted planning scope.

2460133Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2460133Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2460133Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a Physical Education Suite including a Physical Education Hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 m² over 3 no. storeys. The proposal includes the removal of all interim accommodation on site, arranged across 12 no. blocks, with a cumulative GFA of c.4,203sq m (previously permitted under Reg. Ref. LB190739 and Reg. Ref. 21/2336) including the removal of 1 no. interim accommodation block, constructed under exempted development (c.249 sq m). The proposal also includes the demolition of a single-storey c. 190 m² derelict building, associated with the former agricultural use of the site. Vehicular access to the subject site is proposed via a new priority-controlled T-junction located on the new link road to the southwest of the site, with associated tie-in works to the existing road network; 2 no. pedestrian and cyclist access points and 2 no. pedestrian only access points to the southwest boundary of the site; staff and visitor parking spaces and designated drop-off and set down facilities. The development will also include the provision of 1 no. external storage building (c.50 m²); 1 no. bin store; bicycle and scooter parking; vehicle and bus drop off/set down areas; internal access roads; hard and soft play areas including 6 no. hard play court areas; piped infrastructure and ducting; plant and plant room; LPG Tanks Compound; electrical switch room; landscaping and boundary treatments; PV panels; EV parking facilities; external courtyards; disabled car parking spaces; site clearance works, comprising of the partial removal of hedgerows and a number of trees; stepped access routes; street and security lighting; signage; 2 no. attenuation tanks; surface water drainage and SUDs measures (including green roof provision); 5 no. flagpoles; piped infrastructural services and connections, hard and soft landscaping, ESB Substation, changes in level and all associated site development and excavation works above and below ground. The total site area is 5.26Ha. Significant further information/revised plans submitted on this application

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460133

The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a Physical Education Suite including a Physical Education Hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 m² over 3 no. storeys. The proposal includes the removal of all interim accommodation on site, arranged across 12 no. blocks, with a cumulative GFA of c.4,203sq m (previously permitted under Reg. Ref. LB190739 and Reg. Ref. 21/2336) including the removal of 1 no. interim accommodation block, constructed under exempted development (c.249 sq m). The proposal also includes the demolition of a single-storey c. 190 m² derelict building, associated with the former agricultural use of the site. Vehicular access to the subject site is proposed via a new priority-controlled T-junction located on the new link road to the southwest of the site, with associated tie-in works to the existing road network; 2 no. pedestrian and cyclist access points and 2 no. pedestrian only access points to the southwest boundary of the site; staff and visitor parking spaces and designated drop-off and set down facilities. The development will also include the provision of 1 no. external storage building (c.50 m²); 1 no. bin store; bicycle and scooter parking; vehicle and bus drop off/set down areas; internal access roads; hard and soft play areas including 6 no. hard play court areas; piped infrastructure and ducting; plant and plant room; LPG Tanks Compound; electrical switch room; landscaping and boundary treatments; PV panels; EV parking facilities; external courtyards; disabled car parking spaces; site clearance works, comprising of the partial removal of hedgerows and a number of trees; stepped access routes; street and security lighting; signage; 2 no. attenuation tanks; surface water drainage and SUDs measures (including green roof provision); 5 no. flagpoles; piped infrastructural services and connections, hard and soft landscaping, ESB Substation, changes in level and all associated site development and excavation works above and below ground. The total site area is 5.26Ha. Significant further information/revised plans submitted on this application

AuthorityMeath County Council
Reference2460133
StatusChecked 2 Jun 2026
Open official record