Development Description
THE DEMOLITION OF THE EXISTING TWO-STOREY DWELLING, WITH THE CONSTRUCTION OF A PROPOSED TWO STOREY DWELLING WITH BASEMENT, MODIFICATIONS TO THE EXISTING OUTBUILDING TO INCLUDE RE-ROOFING, THE INSTALLATION OF ROOFLIGHTS, ADJUSTMENTS TO WINDOWS AND DOOR OPENINGS AND ALL INTERNAL MODIFICATIONS. PERMISSION IS ALSO SOUGHT FOR WORKS TO EXISTING SITE ENTRANCES AND BOUNDARIES TO IMPROVE SIGHTLINE VISIBILITY TO BOTH, THE DECOMMISSIONING OF THE EXISTING SEPTIC TANK AND THE PROPOSED INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITEWORKS
Map
No coordinates supplied in the public planning feed.