~2 dwellings, The existing Wastewater Treatment Plant, Bulfin Road, Nenagh in...
an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 30 Jun 2025. / Confidence: LowDecision date 30 Jun 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Tipperary County Council
- Exact reference
- 2461086
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure - 2 dwellings
The public application record identifies 2 dwellings in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Tipperary planning activity
These are county discovery links, not claimed relationships to this application.
Application text
an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken
Application to site progress
-
Applied 12 Dec 2024 2461086
-
Decision Conditional 30 Jun 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2461086
an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken
Open official record