Agricultural, Clonmore, Bree, Enniscorthy, Co. Wexford
The proposed works involve the construction of a low earthen bund along the edge of an existing agricultural field at the Clonmore site. The works form part of an EPA-funded research project examining the effectiveness of nature-based interventions for reducing and managing rainfall runoff from agricultural land. The proposed...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 18 Sep 2026. / Confidence: LowDecision date 18 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The proposed works involve the construction of a low earthen bund along the edge of an existing agricultural field at the Clonmore site. The works form part of an EPA-funded research project examining the effectiveness of nature-based interventions for reducing and managing rainfall runoff from agricultural land. The proposed bund will: be no more than 1 metre in height; extend for approximately 80 metres along the edge of the existing field, broadly following an area where a hedgerow previously existed; and be...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 1 official source
- Authority
- Wexford County Council
- Exact reference
- EXD01414
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Agricultural
The public application record identifies agricultural in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- James Carton
- Planning agent
- James Carton
More Wexford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The proposed works involve the construction of a low earthen bund along the edge of an existing agricultural field at the Clonmore site. The works form part of an EPA-funded research project examining the effectiveness of nature-based interventions for reducing and managing rainfall runoff from agricultural land. The proposed bund will: be no more than 1 metre in height; extend for approximately 80 metres along the edge of the existing field, broadly following an area where a hedgerow previously existed; and be constructed using clean, suitable soil brought onto the farm. The bund is intended to slow and temporarily retain surface-water runoff during rainfall events, reducing the rate at which water leaves the field. The intervention will also be monitored as part of the research project to assess its effectiveness as a practical nature-based measure for managing agricultural runoff. The works will involve minor ground preparation followed by the placement and shaping of suitable soil to form the bund. The bund will remain low in profile and will be integrated into the existing agricultural field boundary. We are liaising with the Environmental Protection Agency (EPA) regarding the movement of soil onto the site to ensure that all material used is of appropriate quality and suitable for use on agricultural land. As part of this process, the EPA has requested confirmation that an appropriate planning exemption is in place prior to the movement of soil onto the farm. The purpose of this application is therefore to seek exempted development status of the proposed works before construction and the associated movement of suitable soil onto the site proceed
Application to site progress
-
Applied 24 Aug 2026 EXD01414
-
Decision Exempted Development 18 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale EXD01414
The proposed works involve the construction of a low earthen bund along the edge of an existing agricultural field at the Clonmore site. The works form part of an EPA-funded research project examining the effectiveness of nature-based interventions for reducing and managing rainfall runoff from agricultural land. The proposed bund will: be no more than 1 metre in height; extend for approximately 80 metres along the edge of the existing field, broadly following an area where a hedgerow previously existed; and be constructed using clean, suitable soil brought onto the farm. The bund is intended to slow and temporarily retain surface-water runoff during rainfall events, reducing the rate at which water leaves the field. The intervention will also be monitored as part of the research project to assess its effectiveness as a practical nature-based measure for managing agricultural runoff. The works will involve minor ground preparation followed by the placement and shaping of suitable soil to form the bund. The bund will remain low in profile and will be integrated into the existing agricultural field boundary. We are liaising with the Environmental Protection Agency (EPA) regarding the movement of soil onto the site to ensure that all material used is of appropriate quality and suitable for use on agricultural land. As part of this process, the EPA has requested confirmation that an appropriate planning exemption is in place prior to the movement of soil onto the farm. The purpose of this application is therefore to seek exempted development status of the proposed works before construction and the associated movement of suitable soil onto the site proceed
Open official record