GrantedDecision recorded

Infrastructure, School Road, Lugduff, Tinahely

Tinahely, Wicklow · Wicklow County Council · Plan 2460087 · PB ref PB-10000492868

a 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and...

Indicative value €3m–10m PB indicative band
Units applied for Not listed public application record
Floor area 3,578 m² published reliable figure
Decision 25 Oct 2024 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 25 Oct 2024. / Confidence: Low
Decision CONDITIONAL

Decision date 25 Oct 2024.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

a 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas...

Ref 2460087 Source-linked Official application description for exact planning reference 2460087

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Wicklow County Council
Exact reference
2460087
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2460087Explicit application record
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2460087Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

a 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS)

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460087

a 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS)

AuthorityWicklow County Council
Reference2460087
StatusChecked 2 Jun 2026
Open official record