Cahir, Tipperary
Opt Out- Construction of a new dwelling house, vehicular entrance, connection to public sewer & all associated site works
Lead discovery workspace
One query model feeds Project Leads, Map, Alerts, Shortlist and copy-link URLs.
Lead workspace
Advanced search is the query builder for List, Map, Alerts and Shortlist handoff.
Use this builder to shape a reusable search, then open it in Project Leads, Map or Alerts.
Data basis / Source-linked leads: Search queries the live lead_search_meta + lead_search_fts index, including the full retained public-safe commencement project index. Verify against the official file before acting. Value bands are indicative construction-cost estimates, not contract values.
Opt Out- Construction of a new dwelling house, vehicular entrance, connection to public sewer & all associated site works
a window to the front (east) façade plus 2 No. roof windows to the front roof a window to the side façade, No. roof windows to the rear (west) roof, all to create 41.34 m2 attic (non-habitable) space...
the change of house type on sites 8, 21, 22 and 77 (4 no. units), from a B Type house(a 4 bed 3 storey semi-detached dwelling), to an A1 Type house (a 4 bed 2 storey semi-detached dwelling) and the...
Filters