New build
10 Aug 2023 · Commenced
1 unique event
Dublin, Dublin · South Dublin County Council · Planning ref SD22A/0311 SD18A/0301
Construction of 2 storey datacentre including administration areas, roof top plant, and generator compound and associated site works.
Reconciled event scale
7,410 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
MJM Construction Management
New build
27 Jul 2023 · Latest notice
2 unique events
Bearna, Galway · Galway County Council · Planning ref 22/61247
Construction of a total of 9 No. detached dwellings. Units No. 02 to 10, which will form part of Phase 1B of a larger overall residential development comprising a total of 121 Units.
Unique event Works stated Scale Commenced
CN0103100GC BCMS owner-supplied export
Construction of a single dwelling unit, Unit No. 1 (Type H1) which will form a part of Phase 1B of a larger overall residential development which includes 121. total dwellings.
1 unit · 147.9 m²Builder named
27 Jul 2023
CN0103096GC BCMS open-data feed
Construction of a total of 9 No. detached dwellings. Units No. 02 to 10, which will form part of Phase 1B of a larger overall residential development comprising a total of 121 Units.
9 units · 2,218 m²Builder not named
27 Jul 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
24 Jul 2023 · Commenced
1 unique event
Rathnew, Wicklow · Wicklow County Council
35 No. Houses and ancillary site works at Ballybeg & Merrymeeting, Rathnew, Co Wicklow
Reconciled event scale
35 units · 3,553 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named
New build
24 Jul 2023 · Latest notice
2 unique events
Roundwood, Wicklow · Wicklow County Council · Planning ref 19/1064 + 20/854 + 19/27
The construction of dwelling houses - House Nos 2-17 incl. THE WILLOWS Roundwood Co. Wicklow and associated site development works.
Reconciled event scale
16 units · 2,142.7 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Liam Neville Developments
Unique event Works stated Scale Commenced
CN0103318WW BCMS owner-supplied export
Erection of a single story dwelling house - House No. 1 The Willows
1 unit · 130 m²Builder named
24 Jul 2023
CN0090988WW BCMS open-data feed
The construction of dwelling houses - House Nos 2-17 incl. THE WILLOWS Roundwood Co. Wicklow and associated site development works.
16 units · 2,142.7 m²Builder not named
15 Jun 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
12 Jul 2023 · Latest notice
2 unique events
Old Ennis Road, Clare · Clare County Council · Planning ref P19/765, P22/1058
The construction of 12 number houses along with all associated site works and services.
Reconciled event scale
12 units · 1,619.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0102815CE BCMS open-data feed
The construction of 12 number houses along with all associated site works and services.
12 units · 1,515.6 m²Builder not named
12 Jul 2023
CN0098486CE BCMS open-data feed
The construction of 12 number houses along with all associated site works and services.
12 units · 1,619.9 m²Builder not named
17 Mar 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Jul 2023 · Latest notice
4 unique events
Ballina, Mayo · Mayo County Council · Planning ref 157840
Construction of 6 houses (No's 17-22) at Phase 3, Belleek Manor, Belleek Td, Ballina, Co. Mayo
Reconciled event scale
6 units · 1,182 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Bourke Builders Ballina LTD
Unique event Works stated Scale Commenced
CN0102753MO BCMS open-data feed
Phase 4 Belleek Manor, 5 houses (no's 25 -29), Belleek Manor, Belleek Townland, Ballina, Co. Mayo
5 units · 840 m²Builder not named
07 Jul 2023
CN0101863MO BCMS open-data feed
Completion of the construction of 2 houses, numbers 23 and 24, Belleek Manor, Belleek, Ballina, Co. Mayo. Houses are at blockwork part complete stage.
2 units · 334 m²Builder not named
16 Jun 2023
CN0086375MO BCMS open-data feed
Construction of 6 houses (No's 17-22) at Phase 3, Belleek Manor, Belleek Td, Ballina, Co. Mayo
6 units · 1,182 m²Builder not named
24 Feb 2022
CN0084799MO BCMS owner-supplied export
Completion of No.16 Belleek Manor, Belleek, Ballina, Co. Mayo. House is already completed to raft foundation complete stage.
1 unit · 197 m²Builder named
04 Jan 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration Change of use
07 Jul 2023 · Latest notice
2 unique events
Caisleán an Chomair, Kilkenny · Kilkenny County Council · Planning ref KCC: 18/851 & ABP: 304372-19
The change of use at ground floor level from commercial to residential and the refurbishment of the existing building into three self contained apartments.
Unique event Works stated Scale Commenced
CN0102973KK BCMS open-data feed
The change of use at ground floor level from commercial to residential and the refurbishment of the existing building into three self contained apartments.
3 units · 238 m²Builder not named
07 Jul 2023
CN0091734KK BCMS owner-supplied export
The change of use at ground floor level from commercial to residential and the refurbishment of the existing building into three self contained apartments.
3 units · 1,000 m²Builder named
05 Jul 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Extension Material alteration
30 Jun 2023 · Latest notice
2 unique events
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D22A/0340
The change of use of No. 1 Sussex Street (existing office) and No's. 2, 3 and 4 Sussex Street (existing Credit Union) to a mixed-use commercial and residential scheme which will include 1 No. café and 10 No. apartments (comprised of 3 No. One bedroom units and 7 No. Two bedroom units).
Reconciled event scale
10 units · 1,130 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0008599DR BCMS open-data feed
The change of use of No. 1 Sussex Street (existing office) and No's. 2, 3 and 4 Sussex Street (existing Credit Union) to a mixed-use commercial and residential scheme which will include 1 No. café and 10 No. apartments (comprised of 3 No. One bedroom units and 7 No. Two bedroom units).
10 units · 1,130 m²Builder not named
30 Jun 2023
CN0100833DR BCMS owner-supplied export
Demolition Works Only for 1 - 4 Sussex Street. A Fully compliant Commencement Notice will be lodged for any further works.
10 units · 1,102 m²Builder not named
22 May 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Jun 2023 · Commenced
1 unique event
Waterford, Kilkenny · Kilkenny County Council · Planning ref 19664
Proposed Single Storey Cold Store Warehouse and associated site development works at Trans-Stock Ltd, Christendom, Ferrybank, Co. Kilkenny
Reconciled event scale
7,050 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
McCarthy Civil Contractors
New build
27 Jun 2023 · Latest notice
3 unique events
Bunclody, Wexford · Wexford County Council · Planning ref 20151120
Residential development at Ryland Upper, Bunclody, Co. Wexford comprising of the construction of 8 No. semi-detached dwellings (4 no. 3-bed & 4 no. 4-bed) & 3 no. (4-bed) detached dwellings.
Reconciled event scale
11 units · 1,388.3 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Woodlawn Developments Ltd
Unique event Works stated Scale Commenced
CN0106140WX BCMS open-data feed
Residential development at Ryland Upper, Bunclody, Co. Wexford comprising of the construction of 8 No. semi-detached dwellings (4 no. 3-bed & 4 no. 4-bed) & 3 no. (4-bed) detached dwellings.
11 units · 1,388.3 m²Builder not named
27 Jun 2023
CN0087119WX BCMS owner-supplied export
Residential development comprising of the construction of 4No. 3-bed semi- detached dwellings .
4 units · 541.6 m²Builder named
25 Feb 2022
CN0049340WX BCMS owner-supplied export
Residential development at Ryland Upper, Bunclody, Co. Wexford comprising of the construction of 4No. 3-bed semi- detached dwellings .
4 units · 541.6 m²Builder named
22 Feb 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Extension Material alteration
22 Jun 2023 · Commenced
1 unique event
Granard, Longford · Longford County Council
Refurbishment, extensions and energy up-grades to 19 No. existing houses including up- grade of drainage and water supply systems.
New build
16 Jun 2023 · Latest notice
3 unique events
Castlebridge, Wexford · Wexford County Council · Planning ref 20190312
Construction of 10 no. new dwelling houses and associated site works, nos. 23 to 32 inclusive, an troman, ballytramon, castlebridge, co. wexford.
Reconciled event scale
18 units · 1,959.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0102235WX BCMS owner-supplied export
Construction of 10 no. new dwelling houses and associated site works, nos. 23 to 32 inclusive, an troman, ballytramon, castlebridge, co. wexford.
10 units · 1,148.8 m²Builder not named
16 Jun 2023
CN0098122WX BCMS open-data feed
Construction of 18 no. Dwellings and associated site works, nos. 5-22 inclusive, An Tromán, Ballytramon, Castlebridge Co. Wexford.
18 units · 1,959.9 m²Builder not named
27 Feb 2023
CN0098121WX BCMS open-data feed
Construction of 4 No. Dwellings and associated site works, 1-4 (inclusive) An Tromán, Ballytramon, Castlebridge, Co. Wexford.
4 units · 411.2 m²Builder not named
25 Nov 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
06 Jun 2023 · Latest notice
2 unique events
Limerick, Limerick · Limerick City and County Council · Planning ref 21/342
CONSTRUCTION OF 4 NO TWO STOREY TERRACED HOUSES AND 2 NO SINGLE STOREY SEMI DETACHED HOUSE
Reconciled event scale
6 units · 4,020 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Halpin Complete Construction
Unique event Works stated Scale Commenced
CN0101143LL BCMS owner-supplied export
CONSTRUFCTION OF 4NO TWO STOREY TERRACED HOUSES AND 2 NO SINGLE STOREY HOUSES
4 unitsBuilder named
06 Jun 2023
CN0098782LL BCMS open-data feed
CONSTRUCTION OF 4 NO TWO STOREY TERRACED HOUSES AND 2 NO SINGLE STOREY SEMI DETACHED HOUSE
6 units · 4,020 m²Builder not named
20 Mar 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
02 Jun 2023 · Latest notice
3 unique events
Patrickswell, Limerick · Limerick City and County Council · Planning ref 18200
Construction 19 dwelling houses and associated site works, nos. 30 to 48 inclusive, an tobar, ballyanrahan east, patrickswell, co limerick.
Reconciled event scale
19 units · 2,153.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0101372LL BCMS open-data feed
Construction 19 dwelling houses and associated site works, nos. 30 to 48 inclusive, an tobar, ballyanrahan east, patrickswell, co limerick.
19 units · 2,153.5 m²Builder not named
02 Jun 2023
CN0098359LL BCMS open-data feed
Construction of 12 no. new dwelling houses and associated site works, nos. 18 to 29 inclusive, an tobar, ballyanrahan east, patrickswell, co limerick.
12 units · 1,328 m²Builder not named
08 Mar 2023
CN0096197LL BCMS open-data feed
Construction 17 no. new dwelling houses, nos. 1 to 17 inclusive an tobar, ballyanrahan east, patrickswell, co. limerick.
17 units · 1,827 m²Builder not named
09 Dec 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Extension
20 Apr 2023 · Commenced
1 unique event
Deerpark Industrial Estate, Galway · Galway County Council · Planning ref 212470
To construct an extension (889 sqm) to the side of our existing light industrial unit (5250 sqm) and to carry out all ancillary site works.
New build
14 Apr 2023 · Latest notice
2 unique events
Wicklow, Wicklow · Wicklow County Council · Planning ref 21/630
House Nos. 14-31 incl. Avonvale Manor, Ballynerrin, Co. Wicklow.
Reconciled event scale
18 units · 2,746.2 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0100718WW BCMS open-data feed
House Nos. 14-31 incl. Avonvale Manor, Ballynerrin, Co. Wicklow.
18 units · 2,746.2 m²Builder not named
14 Apr 2023
CN0097686WW BCMS open-data feed
House Nos. 1-13 incl. Avonvale Manor, Ballynerrin, Co. Wicklow.
13 units · 1,667.2 m²Builder not named
03 Jan 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Mar 2023 · Latest notice
2 unique events
Knockraha, Cork · Cork County Council · Planning ref 22/05216
Construction of 9no. dwelling units consisting of 7no. two storey detached dwellings and 2no. two storey semi-detached dwellings at 69-77 Ard Abhainn, Gogganstown, Knockraha, Co. Cork.
Reconciled event scale
9 units · 1,277.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
O Leary & O Sullivan Dev. Ltd
Unique event Works stated Scale Commenced
CN0098467CC BCMS owner-supplied export
Construction of 1no. two storey building comprising 2no. apartment units at 78-79 Ard Abhainn, Gogganstown, Knockraha, Co. Cork.
2 units · 167.1 m²Builder named
10 Mar 2023
CN0095749CC BCMS open-data feed
Construction of 9no. dwelling units consisting of 7no. two storey detached dwellings and 2no. two storey semi-detached dwellings at 69-77 Ard Abhainn, Gogganstown, Knockraha, Co. Cork.
9 units · 1,277.4 m²Builder not named
25 Nov 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
08 Mar 2023 · Latest notice
2 unique events
Tramore, Waterford · Waterford City and County Council · Planning ref 21836
Phase 1 of Residential development of 24 houses comprising 19 no. detached 2 storey houses and 5 no. single storey terraced houses and ancillary site works. This development is an extension of the already complete Newtown Glen housing development and the under construction Cliffside housing development.
Reconciled event scale
14 units · 2,212 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0098356WD BCMS open-data feed
Phase 2 of Residential development of 24 houses comprising 19 no. detached 2 storey houses and 5 no. single storey terraced houses and ancillary site works. This development is an extension of the already complete Newtown Glen housing development and the under construction Cliffside housing development.
10 units · 988 m²Builder not named
08 Mar 2023
CN0090991WD BCMS open-data feed
Phase 1 of Residential development of 24 houses comprising 19 no. detached 2 storey houses and 5 no. single storey terraced houses and ancillary site works. This development is an extension of the already complete Newtown Glen housing development and the under construction Cliffside housing development.
14 units · 2,212 m²Builder not named
30 Jun 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
30 Jan 2023 · Commenced
1 unique event
Dublin, Dublin · Fingal County Council · Planning ref FW15A/0073/E1
Construction of a 5250sqm warehouse building for the storage and distribution of materials, comprising of storage areas, marshalling areas, associated plants and ancillary works all within the confines of Chemco Ireland Terminal 1 facility.
Reconciled event scale
5,250 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Flynn Management & Contractors
New build
27 Jan 2023 · Latest notice
4 unique events
Sallybrook Bridge, Cork · Cork City Council · Planning ref 20/39403
Construction of 15 No. Houses ( No's 29-43) and all associated site works at Glashaboy Heights, Sallybrook, Riverstown, Glanmire Co. Cork for DCN Developments Ltd. Planning Register No 20/39403. ABP Ref 302209-18.
Reconciled event scale
17 units · 1,945.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0096986CY BCMS open-data feed
Construction of 15 No. Houses ( No's 29-43) and all associated site works at Glashaboy Heights, Sallybrook, Riverstown, Glanmire Co. Cork for DCN Developments Ltd. Planning Register No 20/39403. ABP Ref 302209-18.
15 units · 1,535.4 m²Builder not named
27 Jan 2023
CN0090515CY BCMS open-data feed
Construction of 10 No. Houses (No. 19-28 and all associated site works at Glashaboy Heights, Sallybrook, Riverstown, Glanmire, Co. Cork for DCN Developments Limited. Planning reg. no 20/39403. ABP Ref 302209-18.
10 units · 1,054.2 m²Builder not named
17 Jun 2022
CN0083664CY BCMS open-data feed
to Construction of 17No. houses (no.s 02-18) and all associated site works at Glashaboy Heights, Sallybrook, Riverstown, Glanmire Co. Cork for DCN Developments Limited. Planning reg. no. 20/39403. ABP Ref.302209-18
17 units · 1,945.4 m²Builder not named
23 Nov 2021
CN0080126CY BCMS open-data feed
Construction of 10No. houses (no.s 51-60) and all associated site works at Glashaboy View, Sallybrook, Riverstown, Glanmire Co. Cork for DCN Developments Limited. Planning reg. no. 20/39403. ABP Ref.302209-18
10 units · 1,054 m²Builder not named
20 Aug 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
03 Jan 2023 · Commenced
1 unique event
Dublin 7, Dublin · Dublin City Council · Planning ref ABP-312144-21
Fit out of Aldi Store in Unit 2, Block A, Hamilton Gardens, Dublin 7.
New build
05 Dec 2022 · Latest notice
6 unique events
Dublin 17, Dublin · Dublin City Council · Planning ref 3641/21
Data Centre B, Clonshaugh Business and Technology Park, Coolock, Dublin 17, 2 Storey Data Centre.
Unique event Works stated Scale Commenced
CN0096042DC BCMS owner-supplied export
Extension to an existing Substation Building at Clonshaugh Business & Technology Park, Coolock, Dublin 17.
123 m²Builder named
05 Dec 2022
CN0096041DC BCMS open-data feed
Security Hut at Clonshaugh Business and Technology Park, Coolock, Dublin 17.
123 m²Builder not named
05 Dec 2022
CN0096039DC BCMS owner-supplied export
Sprinkler Pump Building at the Data Centre Facility, Clonshaugh Business & Technology Park, Coolock, Dublin 17.
123 m²Builder named
05 Dec 2022
CN0096038DC BCMS owner-supplied export
New MV Building at the Data Centre Facility, Clonshaugh Business & Technology Park, Coolock, Dublin 17
123 m²Builder named
05 Dec 2022
CN0095339DC BCMS owner-supplied export
Data Centre B, Clonshaugh Business and Technology Park, Coolock, Dublin 17, 2 Storey Data Centre.
1,421 m²Builder named
14 Nov 2022
CN0095338DC BCMS open-data feed
Data Centre A, Clonshaugh Business and Technology Park, Coolock, Dublin 17, Construction of 2 Storey Data Centre at Clonshaugh Business and Technology Park, Coolock, Dublin 17.
12,874 m²Builder not named
14 Nov 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Nov 2022 · Latest notice
2 unique events
Greystones, Wicklow · Wicklow County Council · Planning ref 201299
Refurbishment of Existing House and construction of 10 additional houses
Unique event Works stated Scale Commenced
CN0096884WW BCMS owner-supplied export
Construction of commercial unit and ancillary works including connection to services
85.5 m²Builder named
21 Nov 2022
CN0090191WW BCMS open-data feed
Refurbishment of Existing House and construction of 10 additional houses
11 units · 1,443 m²Builder not named
11 May 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Nov 2022 · Latest notice
2 unique events
Gorey, Wexford · Wexford County Council · Planning ref 20171040
ERECT 10 NO. TWO STOREY 3 BED TERRACED UNITS AND ANCILLARY WORKS AND CONNECTION TO PUBLIC SERVICES
Reconciled event scale
10 units · 1,060 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0095918WX BCMS owner-supplied export
ERECT 10 NO. TWO STOREY 3 BED TERRACED UNITS AND ANCILLARY WORKS AND CONNECTION TO PUBLIC SERVICES
10 units · 1,060 m²Builder not named
11 Nov 2022
SN0007907WX BCMS open-data feed
6 NO. 2 BED APARTMENTS AND ANCILLARY WORKS AND CONNECTION TO PUBLIC SERVICES
6 units · 594.5 m²Builder not named
02 Nov 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Nov 2022 · Latest notice
4 unique events
Ballina, Mayo · Mayo County Council · Planning ref 19/119
Phase 3 of Development at Ardoughan Woods, construction of 8 no. dwelling houses
Reconciled event scale
10 units · 1,522 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0095293MO BCMS open-data feed
To construct 4 semi-detached houses & one detached house, Phase 5 of the development at Ardoughan woods
5 units · 698 m²Builder not named
11 Nov 2022
CN0086651MO BCMS open-data feed
Construct 4 no. semi-detached dwelling house as part of the overall development at Ardoughan Woods, Ballina
4 units · 508 m²Builder not named
04 Mar 2022
CN0072349MO BCMS open-data feed
Phase 3 of Development at Ardoughan Woods, construction of 8 no. dwelling houses
8 units · 1,142 m²Builder not named
08 Feb 2021
CN0056266MO BCMS open-data feed
To construct 10 no. dwelling houses as Phase 1 of the overall development of 45 houses
10 units · 1,522 m²Builder not named
03 Sep 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.