Material alteration
13 Feb 2026 · Commenced
1 unique event
DUBLIN, Dublin · Dublin City Council
REPAIR AND REFURBISHMENT OF EXISTING FIRE DAMAGED BUILDING
Extension
13 Feb 2026 · Latest notice
2 unique events
Dublin 1, Dublin · Dublin City Council · Planning ref 4014/20
Proposed extension and material alteration to Arthur's Hotel, 64-66 Gardiner St. Lower, Dublin 1.
Reconciled event scale
1,434 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013720DC BCMS open-data feed
Proposed extension and material alteration to Arthur's Hotel, 64-66 Gardiner St. Lower, Dublin 1.
1,434 m²Builder not named
13 Feb 2026
SN0010347DC BCMS open-data feed
Phase 1: Proposed change of use of protected structures No. 64 65 & 66 Gardiner Street Lower (former medical office and related uses, now vacant) into other residential accommodation.
1,289 m²Builder not named
09 May 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
09 Feb 2026 · Commenced
1 unique event
Dublin, Dublin · Dun Laoghaire Rathdown County Council
Fitout upgrade of an existing office building. Ground floor and Level 1 of Blackthorn Exchange, Sandyford.
New build
04 Feb 2026 · Latest notice
2 unique events
Gort, Galway · Galway County Council · Planning ref 221185
The development will consist of; - Demolition of the existing school buildings, all associated out buildings, structures, play shelters etc. - Construction of a new 2-storey primary school with a total floor area of circa 2,537m² incorporating 12 general classrooms, 2 S.E.N Classrooms, GP Hall and ancillary accommodation. - Modification to main entrance gate of Tubber Road. Modifications extend to St. Colman’s Park entrance. - Localised road realignment works and new footpaths along the Tubber Road including controlled zebra crossing - Erection of totem signage associated with St. Colman’s Park. (signage area of circa 8m²) - Provision of external store (circa 12.25sqm), vehicular drop-off, set-down and on-site parking, associated hard and soft play surfaces, boundary treatments, heat pump enclosure, associated site development works and all other ancillary services.
Unique event Works stated Scale Commenced
CN0138019GC BCMS owner-supplied export
Construction of small shed ca. 12.25sqm
12.5 m²Builder named
04 Feb 2026
CN0137996GC BCMS open-data feed
The development will consist of; - Demolition of the existing school buildings, all associated out buildings, structures, play shelters etc. - Construction of a new 2-storey primary school with a total floor area of circa 2,537m² incorporating 12 general classrooms, 2 S.E.N Classrooms, GP Hall and ancillary accommodation. - Modification to main entrance gate of Tubber Road. Modifications extend to St. Colman’s Park entrance. - Localised road realignment works and new footpaths along the Tubber Road including controlled zebra crossing - Erection of totem signage associated with St. Colman’s Park. (signage area of circa 8m²) - Provision of external store (circa 12.25sqm), vehicular drop-off, set-down and on-site parking, associated hard and soft play surfaces, boundary treatments, heat pump enclosure, associated site development works and all other ancillary services.
2,537 m²Builder not named
04 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build Extension
02 Feb 2026 · Latest notice
2 unique events
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D22A/0836
Construction and extension of Lidl Discount Foodstore together with all ancillary site developments at Bakers Point, Pottery Road, Dun Laoghaire, Co. Dublin
Reconciled event scale
2,530 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013629DR BCMS open-data feed
This application consists of a proposed stand-alone single storey ESB Sub-Station/Switchroom room, circa 24.20m2 gross floor area. The building shall be constructed of masonry concrete block wall construction with a concrete slab roof covering.
24.2 m²Builder not named
02 Feb 2026
CN0137716DR BCMS open-data feed
Construction and extension of Lidl Discount Foodstore together with all ancillary site developments at Bakers Point, Pottery Road, Dun Laoghaire, Co. Dublin
2,530 m²Builder not named
02 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
22 Jan 2026 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council
Office Cat B Fit Out at 2nd floor to accommodate open plan office and meeting spaces, comms room, breakout area and canteen at The Shipping Office building.
Reconciled event scale
7,369 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named
Material alteration
05 Jan 2026 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council
Refurbishment of space at First Floor level including upgrade and refresh of interior floor, wall and ceiling finishes, interior joinery, interior lighting, furniture and catering equipment.
Reconciled event scale
5,652 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named
New build
05 Jan 2026 · Latest notice
2 unique events
Cork, Cork · Cork County Council · Planning ref 235586
Proposed Main Process Building serving the proposed biogas facility at Inchera, Little Island Co Cork
Reconciled event scale
3,871 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013550CC BCMS open-data feed
Proposed single storey administration building serving the proposed biogas facility at Inchera, Little Island, Co Cork.
348 m²Builder not named
05 Jan 2026
SN0012985CC BCMS open-data feed
Proposed Main Process Building serving the proposed biogas facility at Inchera, Little Island Co Cork
3,871 m²Builder not named
29 Aug 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Dec 2025 · Latest notice
2 unique events
Dunbittern East, Bantry, Cork · Cork County Council · Planning ref 25/5776
Construction of a single storey portal frame building and associated site works
Reconciled event scale
2,310 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013490CC BCMS open-data feed
Construction of a single storey portal frame building and associated site works
2,310 m²Builder not named
17 Dec 2025
SN0013486CC BCMS open-data feed
Construction of an ESB Substation and ancillary site works.
21 m²Builder not named
17 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Extension
15 Dec 2025 · Latest notice
2 unique events
Dublin, Dublin · Dublin City Council · Planning ref 4795/23
2-storey extension to the rear of the existing school building including 3 No. classrooms, 2 No. SET rooms with ancillary accommodation, removal of 2 No. existing pre-fab buildings and all associated site works at St. Fergal's Boys National School, Cappagh Road, Finglas West, Dubin 11
Reconciled event scale
1,243 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0136637DC BCMS owner-supplied export
2-storey extension to the rear of the existing school building including 3 No. classrooms, 2 No. SET rooms with ancillary accommodation, removal of 2 No. existing pre-fab buildings and all associated site works at St. Fergal's Boys National School, Cappagh Road, Finglas West, Dubin 11
1,243 m²Builder not named
15 Dec 2025
CN0134264DC BCMS owner-supplied export
2-storey extension to the rear of the existing school building, including 3 no. classrooms, 2 no. SET rooms with ancillary accommodation, removal of 2 No. existing prefab buildings and all associated site works.
1,243 m²Builder not named
07 Oct 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
02 Dec 2025 · Commenced
1 unique event
Dublin, Dublin · Fingal County Council
Enabling works to include service diversions to facilitate the construction of a the new National Cricket Centre at the Sports Ireland Complex, Snugborough Road, Blanchardstown.
Reconciled event scale
4,477 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder named on notice
CJ Callan Construction LTD
Material alteration
02 Dec 2025 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council
Office fitout of Level 8 and 9 of 4&5 Parkplace.
Reconciled event scale
3,491 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder named on notice
Bennett (Construction) Ltd
Material alteration
26 Nov 2025 · Commenced
1 unique event
Dublin · South Dublin County Council
Material alterations to commercial laundry including staff changing rooms, enlarged meeting room and new clean rooms with a plant deck over.
Reconciled event scale
4,970 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder named on notice
JSL Group Ltd T/a Stewart Construction
New build
25 Nov 2025 · Latest notice
2 unique events
Dromore and Farranfore, Kerry · Kerry County Council · Planning ref 21/156
Building A Completion Farranfore Business Park - Completion of Building A and all associated site works and services
Reconciled event scale
3,968 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0136050KY BCMS owner-supplied export
Rebuild Showroom No. 1 which is part of Building A including all associated site services
887 m²Builder not named
25 Nov 2025
SN0006258KY BCMS open-data feed
Building A Completion Farranfore Business Park - Completion of Building A and all associated site works and services
3,968 m²Builder not named
06 Jul 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
24 Nov 2025 · Commenced
1 unique event
Swords, Dublin · Fingal County Council
Refurbishment and fit out of the existing two storey offices.
New build
10 Nov 2025 · Latest notice
2 unique events
Carlow, Carlow · Carlow County Council · Planning ref 24/60173
The proposed ground floor of the Discount Retail Store consists of a retail sales area, baking preparation area, freezer, chiller, storage areas, operations office, plant room and staff/customer wc facilities. The proposed first floor consists of raised plant deck area open to the ground floor storage area, staff WC/shower welfare facilities, staff canteen, meeting room and IT room. The external loading bay area is not covered.
Reconciled event scale
2,331 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013286CW BCMS open-data feed
Proposed stand-alone single storey ESB Sub-Station/Switch room, circa 24.13 m2 gross floor area for Lidl development in Graiguecullen, Co. Carlow.
24.1 m²Builder not named
10 Nov 2025
SN0013287CW BCMS open-data feed
The proposed ground floor of the Discount Retail Store consists of a retail sales area, baking preparation area, freezer, chiller, storage areas, operations office, plant room and staff/customer wc facilities. The proposed first floor consists of raised plant deck area open to the ground floor storage area, staff WC/shower welfare facilities, staff canteen, meeting room and IT room. The external loading bay area is not covered.
2,331 m²Builder not named
05 Nov 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
03 Nov 2025 · Commenced
1 unique event
Craigadoes, Donegal · Donegal County Council
Planning Application for a dwelling with connection to Treatment Plant and Polishing Filters at Creaghadoos, St.Johnston, Co.Donegal
New build
03 Nov 2025 · Latest notice
2 unique events
Baltinglass, Wicklow · Wicklow County Council · Planning ref ABP-319363-24
Construction of a single storey supermarket with ancillary off-licence sales area.
Reconciled event scale
2,396 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0135225WW BCMS owner-supplied export
Construction of a single storey supermarket with ancillary off-licence sales area.
2,396 m²Builder not named
03 Nov 2025
CN0135213WW BCMS owner-supplied export
Proposed stand- alone single storey ESB Sub- Station/Switch room, circa 24.20 m2 gross floor area for Lidl development in Baltinglass, Co. Wicklow
24.2 m²Builder not named
03 Nov 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
16 Oct 2025 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council
Office material alteration of 2 Wilton Place and part of 3 Wilton Place (4 - 6 Floors only, at Wilton Park, Dublin 2
Reconciled event scale
17,379 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named
Extension
13 Oct 2025 · Latest notice
2 unique events
Fermoy, Cork · Cork County Council · Planning ref 2405553
Extension to existing manufacturing facility and associated material alterations.
Reconciled event scale
1,501.8 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0013172CC BCMS open-data feed
Single storey extension to industrial building to provide an ancillary canteen space.
43.0 m²Builder not named
13 Oct 2025
SN0011926CC BCMS open-data feed
Extension to existing manufacturing facility and associated material alterations.
1,501.8 m²Builder not named
09 Jan 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build Extension Change of use
13 Oct 2025 · Commenced
1 unique event
Cathair na Mart, Mayo · Mayo County Council
This project, which entails the development of a new Public Library, Civic Offices, Community Facilities, and Public Realm/Civic Spaces, will be located entirely within the existing grounds of the historic former Sisters of Mercy Convent site on Altamont Street, in the centre of Westport town, County Mayo.
Reconciled event scale
2,401 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder named on notice
Carey Building Contractors
Material alteration
13 Oct 2025 · Commenced
1 unique event
Galway, Galway · Galway City Council
The Fit Out of Howdens Joinery to an existing unit which includes a trade counter area, ancillary offices and meeting rooms, staff facilities and storage areas.
Reconciled event scale
1,227.8 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder named on notice
Shannon Site Solutions Ltd
Material alteration
06 Oct 2025 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council
Reinstating the building to a CAT A office fit-out
Material alteration
25 Sep 2025 · Commenced
1 unique event
Dún Dealgan, Louth · Louth County Council
Refurbishment of existing industrial unit and office building at Coes Road Business Park, Dundalk including upgrading insulation to comply with Building regulations, Part L, upgrade existing fire alarm to comply with IS3218, Upgrade emergency lighting and directional signage to comply with IS3217 and provide adequate fire protection to existing steel structure to comply with Building Regulations, Part B, adequate provisions to comply Part M and Part F within existing buildings and upgrading of the of gantry cranes for internal operation of the building in accordance with Building regulations, Part A.
Reconciled event scale
12,260.3 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named
Material alteration
25 Sep 2025 · Commenced
1 unique event
Athlone, Westmeath · Westmeath County Council
Internal alterations to facilitate provision of a new Glass Wash Room
Reconciled event scale
7,835 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref not indexed
Builder not named