Commencement notice group
Commencement notices — Gort
Gort, Galway
2 separate notices · latest notified commencement 04 Feb 2026 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 04 Feb 2026
- Latest notice
- 12 m²
- Planning references supplied
- 221185
- Public location
- Gort, Galway
Public source geography
Site location
- Public site / locality
- Gort, Galway
- County
- Galway
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of small shed ca. 12.25sqm
12 m² · stated on this notice
The development will consist of; - Demolition of the existing school buildings, all associated out buildings, structures, play shelters etc. - Construction of a new 2-storey primary school with a total floor area of circa 2,537m² incorporating 12 general classrooms, 2 S.E.N Classrooms, GP Hall and ancillary accommodation. - Modification to main entrance gate of Tubber Road. Modifications extend to St. Colman’s Park entrance. - Localised road realignment works and new footpaths along the Tubber Road including controlled zebra crossing - Erection of totem signage associated with St. Colman’s Park. (signage area of circa 8m²) - Provision of external store (circa 12.25sqm), vehicular drop-off, set-down and on-site parking, associated hard and soft play surfaces, boundary treatments, heat pump enclosure, associated site development works and all other ancillary services.
2,537 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.