Development Description
for development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
Map
No coordinates supplied in the public planning feed.