Infrastructure, L2094, Mullagh National School, Mullagh, Co. Clare, V95 HN22
to carry out, as part of the "Safe Routes To School" scheme, the following development: • Construction of 80m of new footpath on the northern side of the L2094 Local Rd. • Footpath improvement of 100m on the south side of the L2094 Local Rd. • Installation of 1 No. controlled pedestrian crossing at the school and 2 No...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Sep 2026. / Confidence: LowDecision date 14 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
to carry out, as part of the "Safe Routes To School" scheme, the following development: • Construction of 80m of new footpath on the northern side of the L2094 Local Rd. • Footpath improvement of 100m on the south side of the L2094 Local Rd. • Installation of 1 No. controlled pedestrian crossing at the school and 2 No. unconditional pedestrian crossings, one to the north and one to the south, all of these will be raised crossings. • Installation of 3 No. speed ramps on the L2094 Local Rd. • Installation of new...
Open scope evidenceNamed firms
Public source roles
- Clare County Council
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Confidence & provenance 1 official source
- Authority
- Clare County Council
- Exact reference
- 268010
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Clare County Council
More Clare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
to carry out, as part of the "Safe Routes To School" scheme, the following development: • Construction of 80m of new footpath on the northern side of the L2094 Local Rd. • Footpath improvement of 100m on the south side of the L2094 Local Rd. • Installation of 1 No. controlled pedestrian crossing at the school and 2 No. unconditional pedestrian crossings, one to the north and one to the south, all of these will be raised crossings. • Installation of 3 No. speed ramps on the L2094 Local Rd. • Installation of new pencil bollards on new and existing paths, and “School Zone” road markings. • Installation of ow-level planting areas. • Mini-Bus Set own Area. • Provision of associated Signage and Road Markings including high friction skid resistance surfacing. • All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
Application to site progress
-
Applied 12 Jun 2026 268010
-
Decision Unconditional 14 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 268010
to carry out, as part of the "Safe Routes To School" scheme, the following development: • Construction of 80m of new footpath on the northern side of the L2094 Local Rd. • Footpath improvement of 100m on the south side of the L2094 Local Rd. • Installation of 1 No. controlled pedestrian crossing at the school and 2 No. unconditional pedestrian crossings, one to the north and one to the south, all of these will be raised crossings. • Installation of 3 No. speed ramps on the L2094 Local Rd. • Installation of new pencil bollards on new and existing paths, and “School Zone” road markings. • Installation of ow-level planting areas. • Mini-Bus Set own Area. • Provision of associated Signage and Road Markings including high friction skid resistance surfacing. • All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development