Refused · decision due 25 Aug 2026Refused decision

Retention, BOXD, Carrigrohane Road, Cork, T12P95E

Carrigrohane Road, Cork · Cork City Council · Plan 26/44866 · PB ref PB-2090036996

Permission for retention for development at a site at BOXD, Carrigrohane Road, Cork, T12P95E. The development will/consists of: The development to be retained consists of the change of use to a coffee shop operation and associated warehouse use. The proposed development will consist of the subsequent redevelopment of the site...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 25 Aug 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Held after refusal

No near-term procurement timing is inferred from a refused planning decision.

Refused / Confidence: High for planning state
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Permission for retention for development at a site at BOXD, Carrigrohane Road, Cork, T12P95E. The development will/consists of: The development to be retained consists of the change of use to a coffee shop operation and associated warehouse use. The proposed development will consist of the subsequent redevelopment of the site to comprise of (1) The demolition of the existing warehouse building; (2) Construction of a replacement commercial building for warehousing and storage use, with a kitchen for the...

Ref 26/44866 Source-linked Official application description for exact planning reference 26/44866
Open scope evidence

Public source roles

CC & H Imperial Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

2 packages
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

26/44866 Explicit description / Source-linked Source
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

26/44866 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Cork City Council
Exact reference
26/44866
Evidence reviewed
4 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Retention

Retention

The public application record identifies retention in the submitted planning scope.

26/44866Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

26/44866Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

26/44866Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
CC & H Imperial Ltd
Planning agent
Rory Hanrahan
Official description

Application text

Permission for retention for development at a site at BOXD, Carrigrohane Road, Cork, T12P95E. The development will/consists of: The development to be retained consists of the change of use to a coffee shop operation and associated warehouse use. The proposed development will consist of the subsequent redevelopment of the site to comprise of (1) The demolition of the existing warehouse building; (2) Construction of a replacement commercial building for warehousing and storage use, with a kitchen for the preparation of food and ancillary offices and staff welfare facilities; (3) Relocation of existing cafe kiosk with new outdoor seating area with canopy and drive-thru facility; (4) Boundary treatments; (5) Landscaping; (6) Footpath upgrade works; (7) Bicycle parking; (8) Signage; (9) Connection to the existing foul sewer and (10) And all ancillary site development works.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 1 Jul 2026 26/44866
  2. Decision Refused 25 Aug 2026
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed This planning record has no linked public commencement evidence.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 26/44866

Permission for retention for development at a site at BOXD, Carrigrohane Road, Cork, T12P95E. The development will/consists of: The development to be retained consists of the change of use to a coffee shop operation and associated warehouse use. The proposed development will consist of the subsequent redevelopment of the site to comprise of (1) The demolition of the existing warehouse building; (2) Construction of a replacement commercial building for warehousing and storage use, with a kitchen for the preparation of food and ancillary offices and staff welfare facilities; (3) Relocation of existing cafe kiosk with new outdoor seating area with canopy and drive-thru facility; (4) Boundary treatments; (5) Landscaping; (6) Footpath upgrade works; (7) Bicycle parking; (8) Signage; (9) Connection to the existing foul sewer and (10) And all ancillary site development works.

AuthorityCork City Council
Reference26/44866
StatusChecked 4 Sep 2026
Open official record