Infrastructure, Site bound by Vicar Street to the east and Molyneux Yard to the...
Planning permission for demolition of all existing buildings/structures on site (approximately 1,020 sq.m GFA) and the relocation of an existing ESB substation to the ground floor of the proposed building fronting onto Molyneux Yard together with new switchroom. The proposed development comprises the erection of a part 5, part...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 22 Oct 2024. / Confidence: LowDecision date 22 Oct 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Planning permission for demolition of all existing buildings/structures on site (approximately 1,020 sq.m GFA) and the relocation of an existing ESB substation to the ground floor of the proposed building fronting onto Molyneux Yard together with new switchroom. The proposed development comprises the erection of a part 5, part 8-storey mixed use building over single basement (approximately 7,509 sq.m GFA) to provide principally for a new hotel (182 bedrooms) and ancillary development at basement to seventh floor...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- 3536/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Basement-parking scope
The public application description explicitly references basement-parking scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Planning permission for demolition of all existing buildings/structures on site (approximately 1,020 sq.m GFA) and the relocation of an existing ESB substation to the ground floor of the proposed building fronting onto Molyneux Yard together with new switchroom. The proposed development comprises the erection of a part 5, part 8-storey mixed use building over single basement (approximately 7,509 sq.m GFA) to provide principally for a new hotel (182 bedrooms) and ancillary development at basement to seventh floor level. A total of 22 bicycle parking spaces are provided at ground floor level. A Creative Art Studio (approximately 122 sq.m GFA) is proposed at ground floor level and basement level. The proposed building is set back at ground and first floor level from the southern, eastern and western site boundaries to provide lightwells serving basement level. The hotel entrance is accessed off an arched, internal, shared pedestrian and vehicular street running east-west across the northern part of the site connecting Vicar Street and Molyneux Yard. The upper levels of the building (from first floor and above) cantilever over the proposed internal street and the upper levels (from second floor and above) cantilever over the proposed lightwells along the southern, eastern and western site boundaries, respectively. The development will include all site works that comprise of all boundary treatments and associated site works, at site bound by Vicar Street to the east and Molyneux Yard to the west, the site adjoins public space to the south that fronts onto Swift's Alley further to the South, Dublin 8.
Application to site progress
-
Applied 16 Apr 2024 3536/24
-
Decision Grant Permission 22 Oct 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 3536/24
Planning permission for demolition of all existing buildings/structures on site (approximately 1,020 sq.m GFA) and the relocation of an existing ESB substation to the ground floor of the proposed building fronting onto Molyneux Yard together with new switchroom. The proposed development comprises the erection of a part 5, part 8-storey mixed use building over single basement (approximately 7,509 sq.m GFA) to provide principally for a new hotel (182 bedrooms) and ancillary development at basement to seventh floor level. A total of 22 bicycle parking spaces are provided at ground floor level. A Creative Art Studio (approximately 122 sq.m GFA) is proposed at ground floor level and basement level. The proposed building is set back at ground and first floor level from the southern, eastern and western site boundaries to provide lightwells serving basement level. The hotel entrance is accessed off an arched, internal, shared pedestrian and vehicular street running east-west across the northern part of the site connecting Vicar Street and Molyneux Yard. The upper levels of the building (from first floor and above) cantilever over the proposed internal street and the upper levels (from second floor and above) cantilever over the proposed lightwells along the southern, eastern and western site boundaries, respectively. The development will include all site works that comprise of all boundary treatments and associated site works, at site bound by Vicar Street to the east and Molyneux Yard to the west, the site adjoins public space to the south that fronts onto Swift's Alley further to the South, Dublin 8.
Open official record