Infrastructure, Diageo Brewery, bounded by James's Street, Victoria Quay...
The proposed development comprises an amendment to planning permission granted under Reg. Ref.: WEB2472/24. The amendments relate solely to the permitted Utilities Hub which is located to the south of the brewery site, close to James’s Street. The amended Utilities Hub will comprise a two-storey (split level) mechanical and...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 6 Nov 2026; no procurement timetable is published.
Decision due 6 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The proposed development comprises an amendment to planning permission granted under Reg. Ref.: WEB2472/24. The amendments relate solely to the permitted Utilities Hub which is located to the south of the brewery site, close to James’s Street. The amended Utilities Hub will comprise a two-storey (split level) mechanical and electrical plant room building containing a Heat Pump Room, 10 KV Intake, Pump House and LV Rooms with a primary parapet height of 9.25m above upper ground level (22.25m O.D) including...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Dublin City Council
- Exact reference
- WEB3266/26
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Diageo Ireland
- Planning agent
- Brian Coughlan
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The proposed development comprises an amendment to planning permission granted under Reg. Ref.: WEB2472/24. The amendments relate solely to the permitted Utilities Hub which is located to the south of the brewery site, close to James’s Street. The amended Utilities Hub will comprise a two-storey (split level) mechanical and electrical plant room building containing a Heat Pump Room, 10 KV Intake, Pump House and LV Rooms with a primary parapet height of 9.25m above upper ground level (22.25m O.D) including external (screened) electrical transformer equipment and 3 no. external vessels to a height of c. 15m above lower ground level (22.75m O.D.), demolition of an existing external staircase and the construction of 2 no. external staircases. The overall GFA of the Utilities Hub Building is c. 594 m². A blue roof (for rainwater attenuation) is proposed at both roof levels. The proposals comprise a reserved area for the provision of electrical infrastructure which will be subject to an application to An Coimisiún Pleanála as it comprises Strategic Infrastructure Development. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. 26 no. covered bicycle parking spaces are proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).
Application to site progress
-
Applied 14 Sep 2026 WEB3266/26
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB3266/26
The proposed development comprises an amendment to planning permission granted under Reg. Ref.: WEB2472/24. The amendments relate solely to the permitted Utilities Hub which is located to the south of the brewery site, close to James’s Street. The amended Utilities Hub will comprise a two-storey (split level) mechanical and electrical plant room building containing a Heat Pump Room, 10 KV Intake, Pump House and LV Rooms with a primary parapet height of 9.25m above upper ground level (22.25m O.D) including external (screened) electrical transformer equipment and 3 no. external vessels to a height of c. 15m above lower ground level (22.75m O.D.), demolition of an existing external staircase and the construction of 2 no. external staircases. The overall GFA of the Utilities Hub Building is c. 594 m². A blue roof (for rainwater attenuation) is proposed at both roof levels. The proposals comprise a reserved area for the provision of electrical infrastructure which will be subject to an application to An Coimisiún Pleanála as it comprises Strategic Infrastructure Development. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. 26 no. covered bicycle parking spaces are proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).
Open official record