Infrastructure, Stephenstown, Balbriggan, Co. Dublin
North Road improvement and Road Infrastructure Project The proposed development will consist of the following: • Construction of 250m of access road with 2 lane 7.5m wide roadway with 4m verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a signalised junction on the Stephenstown Link Road...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Sep 2026. / Confidence: LowDecision date 14 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
North Road improvement and Road Infrastructure Project The proposed development will consist of the following: • Construction of 250m of access road with 2 lane 7.5m wide roadway with 4m verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a signalised junction on the Stephenstown Link Road with south bound right turning lane, north bound left turning lane, and signalised crossing provision for non-motorised users. • Construction of 500m of access road with 2 lane, 7.5m wide...
Open scope evidenceNamed firms
Public source roles
- Economic Development
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Fingal County Council
- Exact reference
- PARTXI/001/26
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Economic Development
- Planning agent
- Elaine Gannon
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
North Road improvement and Road Infrastructure Project The proposed development will consist of the following: • Construction of 250m of access road with 2 lane 7.5m wide roadway with 4m verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a signalised junction on the Stephenstown Link Road with south bound right turning lane, north bound left turning lane, and signalised crossing provision for non-motorised users. • Construction of 500m of access road with 2 lane, 7.5m wide roadway with 4m grass verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a two-lane cycle friendly roundabout on the L1390 at the junction with Flemington Lane, incorporating 210m of two-lane entry and exits with signalised pedestrian and cycle crossings on each arm. • Construction of 60m of dual carriageway with cycleway and footways to each side of the road. • Construction of mini roundabout turning areas at the end of access roads. • Active travel Shared surface link between the two new access roads. • Upgraded shared surface link along White Hart Road for 225m from its junction with the L1390. • Construction of section of shared surface with no vehicular access from the junction of Clonard Hill and White Hart Road for 120m. • Repurposing of 250m of Clonard Street and 100m of White Hart Lane to shared street catering for all motorised and non-motorised transport. • Construction of four bus stops with Bus Shelters, two located on Stephenstown Link Road and two located on the L1390. • Surface water drainage infrastructure including three detention basins/swales and edge of roadway swales to proposed access roads. • Construction of public lighting on new access roads and upgrade/alterations as required at new junctions. • Landscaping to all the above proposed infrastructure, inclusive of localised screen mounding. • Utility diversions, installations, signage, street furniture, boundary treatment and site works. Submissions or observations with respect to the proposed development may be made as follows: • Online via the Council’s Consultation Portal https://consult.fingal.ie/en which is open for submissions up to and including Thursday 30th July 2026 Or • By Post in writing addressed to: Senior Executive Officer, Economic Community & Cultural Development Department, Fingal County Council, Main Street, Swords, Co. Dublin, K67X8Y2 Submissions: Submissions can be made in respect of the Proposed Road Infrastructure at Stephenstown, Balbriggan, Co. Dublin and associated Environmental Reports from 18th June 2026 with online submissions to be received by 11:59pm on Thursday 30th July 2026 or postal submissions before 5pm on Thursday 30th July 2026. Please make your submission by one medium only i.e. online or in writing. Clearly mark your submission as for ‘ Proposed Road Infrastructure at Stephenstown, Balbriggan, Co. Dublin’.
Application to site progress
-
Applied 18 Jun 2026 PARTXI/001/26
-
Decision Grant Approval 14 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale PARTXI/001/26
North Road improvement and Road Infrastructure Project The proposed development will consist of the following: • Construction of 250m of access road with 2 lane 7.5m wide roadway with 4m verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a signalised junction on the Stephenstown Link Road with south bound right turning lane, north bound left turning lane, and signalised crossing provision for non-motorised users. • Construction of 500m of access road with 2 lane, 7.5m wide roadway with 4m grass verge, 2m wide footway and 2m wide cycleway to each side of the road. • Construction of a two-lane cycle friendly roundabout on the L1390 at the junction with Flemington Lane, incorporating 210m of two-lane entry and exits with signalised pedestrian and cycle crossings on each arm. • Construction of 60m of dual carriageway with cycleway and footways to each side of the road. • Construction of mini roundabout turning areas at the end of access roads. • Active travel Shared surface link between the two new access roads. • Upgraded shared surface link along White Hart Road for 225m from its junction with the L1390. • Construction of section of shared surface with no vehicular access from the junction of Clonard Hill and White Hart Road for 120m. • Repurposing of 250m of Clonard Street and 100m of White Hart Lane to shared street catering for all motorised and non-motorised transport. • Construction of four bus stops with Bus Shelters, two located on Stephenstown Link Road and two located on the L1390. • Surface water drainage infrastructure including three detention basins/swales and edge of roadway swales to proposed access roads. • Construction of public lighting on new access roads and upgrade/alterations as required at new junctions. • Landscaping to all the above proposed infrastructure, inclusive of localised screen mounding. • Utility diversions, installations, signage, street furniture, boundary treatment and site works. Submissions or observations with respect to the proposed development may be made as follows: • Online via the Council’s Consultation Portal https://consult.fingal.ie/en which is open for submissions up to and including Thursday 30th July 2026 Or • By Post in writing addressed to: Senior Executive Officer, Economic Community & Cultural Development Department, Fingal County Council, Main Street, Swords, Co. Dublin, K67X8Y2 Submissions: Submissions can be made in respect of the Proposed Road Infrastructure at Stephenstown, Balbriggan, Co. Dublin and associated Environmental Reports from 18th June 2026 with online submissions to be received by 11:59pm on Thursday 30th July 2026 or postal submissions before 5pm on Thursday 30th July 2026. Please make your submission by one medium only i.e. online or in writing. Clearly mark your submission as for ‘ Proposed Road Infrastructure at Stephenstown, Balbriggan, Co. Dublin’.
Open official record