Energy, Unit 24, Allied Logistics Limited Musgrave Tallaght, Second Avenue...
Installation of approximately 6121 sq.m of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building. This is a relevant solar energy development. The total output from photo-voltaic panels is estimated to be 1224 kWp and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 2 Sep 2026. / Confidence: LowDecision date 2 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Installation of approximately 6121 sq.m of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building. This is a relevant solar energy development. The total output from photo-voltaic panels is estimated to be 1224 kWp and therefore is subject to a completeness check.
Open scope evidenceNamed firms
Public source roles
- Musgrave Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 1 official source
- Authority
- South Dublin County Council
- Exact reference
- RED26A/0013W
- Evidence reviewed
- 16 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Musgrave Ltd
- Planning agent
- Joe Gorman
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Installation of approximately 6121 sq.m of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building. This is a relevant solar energy development. The total output from photo-voltaic panels is estimated to be 1224 kWp and therefore is subject to a completeness check.
Application to site progress
-
Applied 14 May 2026 RED26A/0013W
-
Decision Grant Permission 2 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale RED26A/0013W
Installation of approximately 6121 sq.m of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building. This is a relevant solar energy development. The total output from photo-voltaic panels is estimated to be 1224 kWp and therefore is subject to a completeness check.
Open official record