Development Description
Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain).
Map
No coordinates supplied in the public planning feed.