Development Description
The demolition of the single storey lean-too roof within the courtyard, replacement windows, localized fabric repairs to walls and roofs, addition of breathable internal wall insulation and alterations to the single and two storey 'Memorial Buildings', two 'bay-window' extensions to the single storey building on the Courtyard side and a single storey extension to the south of the main school buildings for a new ESB Sub-Station and Switch Room. This is a Protected Structure. Alterations include: Single Storey Building: the closing up of a doorway, the removal of some modern partition walls and the construction of new partition walls forming toilets. Two Storey Building: widening an existing doorway and creating a new doorway from a window opening, removal of existing staircases and part of the First-Floor Floor to create a double height space, the removal of internal partition walls; the construction of a new lift, raked seating, a new escape staircase and some new internal partitions.
Map
No coordinates supplied in the public planning feed.