~7 dwellings, 3, Preston Street, Dublin 1

Dublin 1, Dublin · Dublin City Council · Plan WEB1084/25 · PB ref PB-10000196335

RETENTION. PROTECTED STRUCTURE. The development consists of the retention of the works carried out to date to 7 No. existing apartments, namely (a) external works including wig repointing of entire front elevation, cleaning of cills, plinths, parapets and stone surround to front door, replacement of previously replaced roof...

Indicative value Not listed PB indicative band
Units applied for 7 public application record
Floor area Not listed no reliable figure indexed
Decision 13 May 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 13 May 2025. / Confidence: Low
Decision GRANT RETENTION PERMISSION

Decision date 13 May 2025.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

RETENTION. PROTECTED STRUCTURE. The development consists of the retention of the works carried out to date to 7 No. existing apartments, namely (a) external works including wig repointing of entire front elevation, cleaning of cills, plinths, parapets and stone surround to front door, replacement of previously replaced roof timbers, replacement of synthetic slates with natural roof slates, repointing of chimney stack and coping stones to parapet, replacement of 10 no uPVC windows with timber sliding sash windows...

Ref WEB1084/25 Source-linked Official application description for exact planning reference WEB1084/25

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Dublin City Council
Exact reference
WEB1084/25
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Protected structure

Protected structure - 7 dwellings

The public application record identifies 7 dwellings in the submitted planning scope.

WEB1084/25Explicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

WEB1084/25Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

WEB1084/25Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

RETENTION. PROTECTED STRUCTURE. The development consists of the retention of the works carried out to date to 7 No. existing apartments, namely (a) external works including wig repointing of entire front elevation, cleaning of cills, plinths, parapets and stone surround to front door, replacement of previously replaced roof timbers, replacement of synthetic slates with natural roof slates, repointing of chimney stack and coping stones to parapet, replacement of 10 no uPVC windows with timber sliding sash windows, replacement of concrete steps with granite steps and repointing of granite cappings below the new front railing, refurbishment of the fanlight over the front door, installation of new cast iron rainwater downpipe, removal of “thrust out” structure to rear and (b) internal works including removal of all electrical, plumbing and drainage services, removal of the following non original items to all storeys; ceilings and covings, partition walls, decayed floor joists, floor coverings, doors, plasterboard linings to external walls and underside of stairs. (c) All associated site works.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 17 Jan 2025 WEB1084/25
  2. Decision Grant Retention Permission 13 May 2025
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale WEB1084/25

RETENTION. PROTECTED STRUCTURE. The development consists of the retention of the works carried out to date to 7 No. existing apartments, namely (a) external works including wig repointing of entire front elevation, cleaning of cills, plinths, parapets and stone surround to front door, replacement of previously replaced roof timbers, replacement of synthetic slates with natural roof slates, repointing of chimney stack and coping stones to parapet, replacement of 10 no uPVC windows with timber sliding sash windows, replacement of concrete steps with granite steps and repointing of granite cappings below the new front railing, refurbishment of the fanlight over the front door, installation of new cast iron rainwater downpipe, removal of “thrust out” structure to rear and (b) internal works including removal of all electrical, plumbing and drainage services, removal of the following non original items to all storeys; ceilings and covings, partition walls, decayed floor joists, floor coverings, doors, plasterboard linings to external walls and underside of stairs. (c) All associated site works.

AuthorityDublin City Council
ReferenceWEB1084/25
StatusChecked 2 Jun 2026