Protected structure, Pro-Cathedral House, 83 Marlborough Street, Dublin 1
2. The development shall comply with the following requirements of the Conservation Section: b) Prior to the commencement of the development, the applicant shall submit revised drawings / documentation for the written approval of the planning authority to show the following: (i) Samples of render and rule-and-lined scoring to...
The record describes what is sought. Nothing is permitted until the authority decision.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 20 Nov 2025. / Confidence: LowDecision date 20 Nov 2025.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
2. The development shall comply with the following requirements of the Conservation Section: b) Prior to the commencement of the development, the applicant shall submit revised drawings / documentation for the written approval of the planning authority to show the following: (i) Samples of render and rule-and-lined scoring to the south gable elevation for written approval of the Conservation Officer. (ii) Samples of raking of cementitious pointing from façade brickwork, brick repairs, cleaning and repointing. The...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Confidence & provenance 1 official source
- Authority
- Dublin City Council
- Exact reference
- WEB2920/25Sub01
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- St Mary'S Pro-Cathedral Parish Care of Schools & Parishes of Diocese of Dublin (Rc)
- Planning agent
- Fitzgerald Kavanagh + Partners
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
2. The development shall comply with the following requirements of the Conservation Section: b) Prior to the commencement of the development, the applicant shall submit revised drawings / documentation for the written approval of the planning authority to show the following: (i) Samples of render and rule-and-lined scoring to the south gable elevation for written approval of the Conservation Officer. (ii) Samples of raking of cementitious pointing from façade brickwork, brick repairs, cleaning and repointing. The applicant shall carry out further investigation of the brickwork to identify any remaining evidence of historic pointing and shall agree in writing an evidence-based re-pointing methodology with the Conservation Officer. The applicant shall directly contact the CO to arrange an inspection. c) The proposed development shall be carried out in accordance with the following: (i) All works to the structure shall be carried out in accordance with best conservation practice and the Architectural Heritage Protection Guidelines for Planning Authorities (2011) and Advice Series issued by the Department of Housing, Local Government and Heritage. Any repair works shall retain the maximum amount of surviving historic fabric in situ. Items to be removed for repair off-site shall be recorded prior to removal, catalogued and numbered to allow for authentic re-instatement. (ii) All existing original features, in the vicinity of the works shall be protected during the course of the refurbishment works. (iii) All repair of original fabric shall be scheduled and carried out by appropriately experienced conservators of historic fabric. (iv) The architectural detailing and materials in the new work shall be executed to the highest standards so as to complement the setting of the protected structure and the historic area. Reason: In order to protect the original fabric, character and integrity of the Protected Structure at 83 Marlborough Street and to ensure that the proposed works are carried out in accordance with best conservation practice
Application to site progress
-
Applied 15 Sep 2026 WEB2920/25Sub01
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2920/25Sub01
2. The development shall comply with the following requirements of the Conservation Section: b) Prior to the commencement of the development, the applicant shall submit revised drawings / documentation for the written approval of the planning authority to show the following: (i) Samples of render and rule-and-lined scoring to the south gable elevation for written approval of the Conservation Officer. (ii) Samples of raking of cementitious pointing from façade brickwork, brick repairs, cleaning and repointing. The applicant shall carry out further investigation of the brickwork to identify any remaining evidence of historic pointing and shall agree in writing an evidence-based re-pointing methodology with the Conservation Officer. The applicant shall directly contact the CO to arrange an inspection. c) The proposed development shall be carried out in accordance with the following: (i) All works to the structure shall be carried out in accordance with best conservation practice and the Architectural Heritage Protection Guidelines for Planning Authorities (2011) and Advice Series issued by the Department of Housing, Local Government and Heritage. Any repair works shall retain the maximum amount of surviving historic fabric in situ. Items to be removed for repair off-site shall be recorded prior to removal, catalogued and numbered to allow for authentic re-instatement. (ii) All existing original features, in the vicinity of the works shall be protected during the course of the refurbishment works. (iii) All repair of original fabric shall be scheduled and carried out by appropriately experienced conservators of historic fabric. (iv) The architectural detailing and materials in the new work shall be executed to the highest standards so as to complement the setting of the protected structure and the historic area. Reason: In order to protect the original fabric, character and integrity of the Protected Structure at 83 Marlborough Street and to ensure that the proposed works are carried out in accordance with best conservation practice
Open official record