Infrastructure, St Andrew's church Suffolk Street, St. Andrews Street, Dublin 2
PROTECTED STRUCTURE: We, Failte Ireland, intend to apply for Permission for development at the east side of St. Andrews Former Tourism Centre (Protected Structure), Suffolk Street/St. Andrews Street, Dublin 2. The development will consist of: 1. A single-storey, contemporary-style extension to the east apse of the former...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 24 Jul 2025. / Confidence: LowDecision date 24 Jul 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE: We, Failte Ireland, intend to apply for Permission for development at the east side of St. Andrews Former Tourism Centre (Protected Structure), Suffolk Street/St. Andrews Street, Dublin 2. The development will consist of: 1. A single-storey, contemporary-style extension to the east apse of the former Tourism Bureau (church building), which will house an ESB substation, switchroom and storage. 2. The proposal includes trenches for the ESB cable running from Suffolk Street to the ESB...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB1119/25
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE: We, Failte Ireland, intend to apply for Permission for development at the east side of St. Andrews Former Tourism Centre (Protected Structure), Suffolk Street/St. Andrews Street, Dublin 2. The development will consist of: 1. A single-storey, contemporary-style extension to the east apse of the former Tourism Bureau (church building), which will house an ESB substation, switchroom and storage. 2. The proposal includes trenches for the ESB cable running from Suffolk Street to the ESB substation. 3. All associated site works. The total floor area of the single-storey building is 51.9 sq. m. The total area of the site, required for the works, including the trenches, is 65.4 sq. m.
Application to site progress
-
Applied 22 Jan 2025 WEB1119/25
-
Decision Grant Permission 24 Jul 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB1119/25
PROTECTED STRUCTURE: We, Failte Ireland, intend to apply for Permission for development at the east side of St. Andrews Former Tourism Centre (Protected Structure), Suffolk Street/St. Andrews Street, Dublin 2. The development will consist of: 1. A single-storey, contemporary-style extension to the east apse of the former Tourism Bureau (church building), which will house an ESB substation, switchroom and storage. 2. The proposal includes trenches for the ESB cable running from Suffolk Street to the ESB substation. 3. All associated site works. The total floor area of the single-storey building is 51.9 sq. m. The total area of the site, required for the works, including the trenches, is 65.4 sq. m.
Open official record