Public / civic, Mater Misercordiae Hospital, Eccles Street, Dublin 7, D07 R2WY
The development will consist of the construction of a new raised helipad with a diameter of 26.4m on a structural metal frame on the rooftop of the existing Rock Wing of Mater Misericordiae University Hospital, approx. 36m above Ground Level. Associated access/egress ramp from the helipad to the existing roof at Level 09 and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 25 Apr 2025. / Confidence: LowDecision date 25 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of the construction of a new raised helipad with a diameter of 26.4m on a structural metal frame on the rooftop of the existing Rock Wing of Mater Misericordiae University Hospital, approx. 36m above Ground Level. Associated access/egress ramp from the helipad to the existing roof at Level 09 and emergency escape stairs to the existing roof at Level 07. New external rooftop access hatch above Level 06 to provide alternative escape access to existing internal fire escape stairs towards...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB1423/25
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Public / civic
The public application record identifies public / civic in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of the construction of a new raised helipad with a diameter of 26.4m on a structural metal frame on the rooftop of the existing Rock Wing of Mater Misericordiae University Hospital, approx. 36m above Ground Level. Associated access/egress ramp from the helipad to the existing roof at Level 09 and emergency escape stairs to the existing roof at Level 07. New external rooftop access hatch above Level 06 to provide alternative escape access to existing internal fire escape stairs towards Eccles Street with subsequent change of existing store room and staff room to stairs and link corridor at Level 06. Associated services and plant including a Deck Integrated Fire Fighting System (DIFFS) with water storage and water retention tanks at Level 08. Associated lighting to landing deck of Helipad and access/egress routes. Roof mounted windsock on adjacent McGivney Wing with associated new maintenance ladder. Internal alterations to the existing adjacent circulation core including widening the existing stairs between levels 09 and 07 and revising a lobby to the existing fire-fighting shaft at level 07.
Application to site progress
-
Applied 3 Mar 2025 WEB1423/25
-
Decision Grant Permission 25 Apr 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB1423/25
The development will consist of the construction of a new raised helipad with a diameter of 26.4m on a structural metal frame on the rooftop of the existing Rock Wing of Mater Misericordiae University Hospital, approx. 36m above Ground Level. Associated access/egress ramp from the helipad to the existing roof at Level 09 and emergency escape stairs to the existing roof at Level 07. New external rooftop access hatch above Level 06 to provide alternative escape access to existing internal fire escape stairs towards Eccles Street with subsequent change of existing store room and staff room to stairs and link corridor at Level 06. Associated services and plant including a Deck Integrated Fire Fighting System (DIFFS) with water storage and water retention tanks at Level 08. Associated lighting to landing deck of Helipad and access/egress routes. Roof mounted windsock on adjacent McGivney Wing with associated new maintenance ladder. Internal alterations to the existing adjacent circulation core including widening the existing stairs between levels 09 and 07 and revising a lobby to the existing fire-fighting shaft at level 07.