Protected structure, Fumbally Square and Fumbally Court, Fumbally Lane, Dublin 8
PROTECTED STRUCTURE, CHANGE OF USE: The proposed development relates to two adjacent sites on Fumbally Lane including the Fumbally Square Building within the Fumbally Square site, located to the north of Fumbally Lane and southwest of New Street, and the West Court Building (known as Tower 1 &2) of the Fumbally Court site...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Sep 2026. / Confidence: LowDecision date 14 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE, CHANGE OF USE: The proposed development relates to two adjacent sites on Fumbally Lane including the Fumbally Square Building within the Fumbally Square site, located to the north of Fumbally Lane and southwest of New Street, and the West Court Building (known as Tower 1 &2) of the Fumbally Court site, located to the south of Fumbally Lane and to the north of Malpas Street, Dublin 8. The proposed development generally consists of a change of use from office use and the required works to...
Open scope evidenceNamed firms
Public source roles
- Civic Projects One Partnership L.p.
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Dublin City Council
- Exact reference
- WEB1823/26
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Civic Projects One Partnership L.p.
- Planning agent
- Sorcha Turnbull
Reviewed build intelligence
What the documents establish
Government document review
Decision recorded; appeal window open and no exact commencement link. Scale reflects the permitted decision record.
6 official documents inspected · Checked 2026-09-19 · Official file index
Foul drainage
Application record · Dublin City Council WEB1823/26 official inventory date 2026-09-16: application scheme as submitted or assessed at that date, evidenced by Decision Notices, Planner's Report Published; any later dated revision is a separate state.
What the evidence says
new foul connection to the north of the site
Machine-extracted from the official document; automated reviewed for publication.
Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.
What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.
Inspect the evidence
Planner's Report Published · p.1
Page 1 · Issued 2026-09-16 · Dublin City Council WEB1823/26 - Planner's Report Published (planner_report); official inventory date 2026-09-16; retained revision sha256:b55377ccc42f · Checked 2026-09-19
new foul connection to the north of the site
Remaining document questions
- Inspect any later revision the authority replaces at the same URL.
- Link the commencement and completion events when they arrive.
6 retained official PDF revision(s) from the exact Dublin City Council WEB1823/26 file list. Machine extraction reads bounded passages; drawings are not interpreted.
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE, CHANGE OF USE: The proposed development relates to two adjacent sites on Fumbally Lane including the Fumbally Square Building within the Fumbally Square site, located to the north of Fumbally Lane and southwest of New Street, and the West Court Building (known as Tower 1 &2) of the Fumbally Court site, located to the south of Fumbally Lane and to the north of Malpas Street, Dublin 8. The proposed development generally consists of a change of use from office use and the required works to facilitate the development of a 172-no. room aparthotel over two buildings. The application boundary includes a Protected Structure at 12 Fumbally Lane (RPS: 3001- entrance walls and stone setts) and sits as part of a wider site which contains a Protected Structure at 9 Fumbally Lane (RPS Ref. 3000- a stone warehouse). The development will consist of the development of a 172-no. room aparthotel, within the existing buildings, as follows: 1. Change of use of the existing 5 storey Square Building located within Fumbally Square from office to aparthotel to accommodate 119 no. rooms. The existing central courtyard of the Square Building is to be enclosed by new glazed walls at ground level and a canopy at roof level, creating a central reception and lounge area of 192.7 sq.m, at ground floor level which also includes adjacent spaces to include a social kitchen, luggage store and back of house areas. Internal reconfiguration of the existing office layouts to facilitate aparthotel rooms. A publicly accessible Wellness Studio of 122 sq.m is also provided at ground level accessed from the Fumbally Square courtyard. Upgrades to the existing landscaping of Fumbally Square is also proposed which includes alterations to existing setts (RPS: 3001) to provide for a Part M route. Amendments to the existing façade to include new openings in the on the northern elevation to provide additional windows, a new service entrance at ground level on the southern elevation, the enclosing of the existing central courtyard at ground floor level on the western elevation to form new entrance and enclosure of existing opening on the eastern elevation. Amendments are proposed to the existing basement under Fumbally Square which include the removal of 10 no. car parking spaces and the provision of storage areas, new stair to ground level, cycle parking, back of house areas, staff office and changing areas. The proposed amendments result in a minor increase in gross floor area above ground of c. 233 sq.m all contained within the footprint of the existing building. 2. Change of use of the existing 3 storey West Court Building located within Fumbally Court from office to aparthotel and to accommodate 53 no. rooms. A lounge area at ground floor level is provided as well as back of house areas and inclusion of new internal stairs/lift. Internal reconfiguration of the existing office layouts to facilitate aparthotel rooms. A number of existing blocked up window openings on the west elevation are proposed to be reopened. Upgrades to the existing landscaping of Fumbally Square is also proposed. The proposed amendments result in a minor increase in gross floor area of c. 113.07 sq.m all contained within the footprint of the existing building. 3. Use of existing and upgraded plant and other ancillary facilities at basement and ground level to service the buildings including a new foul connection to the north of the site.
Application to site progress
-
Applied 10 Apr 2026 WEB1823/26
-
Decision Grant Permission 14 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB1823/26
PROTECTED STRUCTURE, CHANGE OF USE: The proposed development relates to two adjacent sites on Fumbally Lane including the Fumbally Square Building within the Fumbally Square site, located to the north of Fumbally Lane and southwest of New Street, and the West Court Building (known as Tower 1 &2) of the Fumbally Court site, located to the south of Fumbally Lane and to the north of Malpas Street, Dublin 8. The proposed development generally consists of a change of use from office use and the required works to facilitate the development of a 172-no. room aparthotel over two buildings. The application boundary includes a Protected Structure at 12 Fumbally Lane (RPS: 3001- entrance walls and stone setts) and sits as part of a wider site which contains a Protected Structure at 9 Fumbally Lane (RPS Ref. 3000- a stone warehouse). The development will consist of the development of a 172-no. room aparthotel, within the existing buildings, as follows: 1. Change of use of the existing 5 storey Square Building located within Fumbally Square from office to aparthotel to accommodate 119 no. rooms. The existing central courtyard of the Square Building is to be enclosed by new glazed walls at ground level and a canopy at roof level, creating a central reception and lounge area of 192.7 sq.m, at ground floor level which also includes adjacent spaces to include a social kitchen, luggage store and back of house areas. Internal reconfiguration of the existing office layouts to facilitate aparthotel rooms. A publicly accessible Wellness Studio of 122 sq.m is also provided at ground level accessed from the Fumbally Square courtyard. Upgrades to the existing landscaping of Fumbally Square is also proposed which includes alterations to existing setts (RPS: 3001) to provide for a Part M route. Amendments to the existing façade to include new openings in the on the northern elevation to provide additional windows, a new service entrance at ground level on the southern elevation, the enclosing of the existing central courtyard at ground floor level on the western elevation to form new entrance and enclosure of existing opening on the eastern elevation. Amendments are proposed to the existing basement under Fumbally Square which include the removal of 10 no. car parking spaces and the provision of storage areas, new stair to ground level, cycle parking, back of house areas, staff office and changing areas. The proposed amendments result in a minor increase in gross floor area above ground of c. 233 sq.m all contained within the footprint of the existing building. 2. Change of use of the existing 3 storey West Court Building located within Fumbally Court from office to aparthotel and to accommodate 53 no. rooms. A lounge area at ground floor level is provided as well as back of house areas and inclusion of new internal stairs/lift. Internal reconfiguration of the existing office layouts to facilitate aparthotel rooms. A number of existing blocked up window openings on the west elevation are proposed to be reopened. Upgrades to the existing landscaping of Fumbally Square is also proposed. The proposed amendments result in a minor increase in gross floor area of c. 113.07 sq.m all contained within the footprint of the existing building. 3. Use of existing and upgraded plant and other ancillary facilities at basement and ground level to service the buildings including a new foul connection to the north of the site.
Open official record