Infrastructure, Guiness Brewery, bounded by James's Street, Victoria Quay...
PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482 m²) and associated works including...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Jan 2025. / Confidence: LowDecision date 14 Jan 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482 m²) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB2472/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482 m²) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary parapet height of 15.15m and including 3 no. flues to a height of 23.65m (28.1m O.D) and external plant compound (72 m²) containing transformer equipment. The overall GFA of the Energy Centre (2) Building is c. 788 m². A blue roof (for rainwater attenuation) is proposed at roof level. Construction of a two-storey Water Recovery Plant (WRP) Building with a primary parapet height of 17.35m containing WRP plant and ancillary staff facilities. The overall GFA of the WRP Building is 1,576 m². A blue roof is proposed at roof level. The Water Recovery Plant also includes the following external plant elements: External Equalisation Tank with height of 13.25m including external access stairway; 2 no. Biogas Scrubbers with a height of 6.3m above parapet level and 1 no. emergency flare at a height of 7.5m above parapet level. 2 no. anaerobic treatment tanks to a height of c. 21m above ground level and external odour control plant. Aerobic treatment aeration tank to a height of 12.04m (+17.33 O.D.) with external access stairway, external renewable Biogas Balloon, other external items including ancillary plant / equipment, enclosing bund walls and circulation infrastructure. Demolition and removal of the former Flaking Plant (c. 46m / 11 storey equivalent in height) located centrally within the site (3,001 m²), 1 no. two-storey prefabricated building, 1 no. single storey electrical distribution room, 6 no. single storey cabins / containers, vehicular concrete ramp and section of steel pipe bridge structure (691 m²). Construction of a Utilities Hub comprising a proposed split-level building comprising a single storey structure (at lower ground level) ranging in height from 4.2m to 9.2m containing heat pumps, workshop, staff accommodation and ancillary plant, and a single-storey structure (at upper ground level) for use as Energy Centre (1) containing electrical boiler room to a height to parapet level of 8.72m, 2 no. flues to a height of 17.22m above upper ground level and including external plant compounds containing transformer equipment at the upper ground level (258 m²), and 3 no. external vessels 15m in height at lower ground level. A blue roof is proposed at roof level. External stairs, ancillary site works, hard and soft landscaping are proposed. The Utilities Hub will comprise a GFA of c. 1,996.2 m². The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. An additional 26 no. bicycle parking spaces are proposed. The application site is located in the curtilage of a number of Protected Structures. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).
Application to site progress
-
Applied 11 Nov 2024 WEB2472/24
-
Decision Grant Permission 14 Jan 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2472/24
PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482 m²) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary parapet height of 15.15m and including 3 no. flues to a height of 23.65m (28.1m O.D) and external plant compound (72 m²) containing transformer equipment. The overall GFA of the Energy Centre (2) Building is c. 788 m². A blue roof (for rainwater attenuation) is proposed at roof level. Construction of a two-storey Water Recovery Plant (WRP) Building with a primary parapet height of 17.35m containing WRP plant and ancillary staff facilities. The overall GFA of the WRP Building is 1,576 m². A blue roof is proposed at roof level. The Water Recovery Plant also includes the following external plant elements: External Equalisation Tank with height of 13.25m including external access stairway; 2 no. Biogas Scrubbers with a height of 6.3m above parapet level and 1 no. emergency flare at a height of 7.5m above parapet level. 2 no. anaerobic treatment tanks to a height of c. 21m above ground level and external odour control plant. Aerobic treatment aeration tank to a height of 12.04m (+17.33 O.D.) with external access stairway, external renewable Biogas Balloon, other external items including ancillary plant / equipment, enclosing bund walls and circulation infrastructure. Demolition and removal of the former Flaking Plant (c. 46m / 11 storey equivalent in height) located centrally within the site (3,001 m²), 1 no. two-storey prefabricated building, 1 no. single storey electrical distribution room, 6 no. single storey cabins / containers, vehicular concrete ramp and section of steel pipe bridge structure (691 m²). Construction of a Utilities Hub comprising a proposed split-level building comprising a single storey structure (at lower ground level) ranging in height from 4.2m to 9.2m containing heat pumps, workshop, staff accommodation and ancillary plant, and a single-storey structure (at upper ground level) for use as Energy Centre (1) containing electrical boiler room to a height to parapet level of 8.72m, 2 no. flues to a height of 17.22m above upper ground level and including external plant compounds containing transformer equipment at the upper ground level (258 m²), and 3 no. external vessels 15m in height at lower ground level. A blue roof is proposed at roof level. External stairs, ancillary site works, hard and soft landscaping are proposed. The Utilities Hub will comprise a GFA of c. 1,996.2 m². The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. An additional 26 no. bicycle parking spaces are proposed. The application site is located in the curtilage of a number of Protected Structures. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).
Open official record