Save this project to account
New Application · decision due 28 Sep 2026Protected structureDecision recorded

Infrastructure, No. 22 Dominick Street Lower, Dublin 1, (A Protected Structure...

(a Protected Structure Rps 2311), Dublin · Dublin City Council · Plan WEB5801/25Sub04 · PB ref PB-2382931323

7. The development shall comply with the following requirements of Transport Infrastructure Ireland (TII): b) Overhead Conductor System (OCS) poles and / or fixings are located on / or adjacent to the proposed development. Prior to commencement of development, the following plans and details shall be submitted for the written...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 28 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 21 Sep 2026. / Confidence: Low
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

7. The development shall comply with the following requirements of Transport Infrastructure Ireland (TII): b) Overhead Conductor System (OCS) poles and / or fixings are located on / or adjacent to the proposed development. Prior to commencement of development, the following plans and details shall be submitted for the written agreement of the planning authority subject to the written agreement of TII: (a) OCS pole protection and safety distances, and / or (b) Existing, temporary and subsequent permanent fixings...

Ref WEB5801/25Sub04 Source-linked Official application description for exact planning reference WEB5801/25Sub04
Open scope evidence

Public source roles

Dungiven Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
Dublin City Council
Exact reference
WEB5801/25Sub04
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

WEB5801/25Sub04Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Dungiven Ltd
Planning agent
Hughes Planning
Official description

Application text

7. The development shall comply with the following requirements of Transport Infrastructure Ireland (TII): b) Overhead Conductor System (OCS) poles and / or fixings are located on / or adjacent to the proposed development. Prior to commencement of development, the following plans and details shall be submitted for the written agreement of the planning authority subject to the written agreement of TII: (a) OCS pole protection and safety distances, and / or (b) Existing, temporary and subsequent permanent fixings. The developer shall be liable for all costs associated with the removal and reinstatement of the Luas related infrastructure.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 4 Aug 2026 WEB5801/25Sub04
  2. Decision Compliance 21 Sep 2026
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale WEB5801/25Sub04

7. The development shall comply with the following requirements of Transport Infrastructure Ireland (TII): b) Overhead Conductor System (OCS) poles and / or fixings are located on / or adjacent to the proposed development. Prior to commencement of development, the following plans and details shall be submitted for the written agreement of the planning authority subject to the written agreement of TII: (a) OCS pole protection and safety distances, and / or (b) Existing, temporary and subsequent permanent fixings. The developer shall be liable for all costs associated with the removal and reinstatement of the Luas related infrastructure.

AuthorityDublin City Council
ReferenceWEB5801/25Sub04
StatusChecked 26 Sep 2026
Open official record