Appeal/FI, Former Magee Barracks Kildare Town, Kildare Town, Co. Kildare.
for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8 m² along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 9 Oct 2024. / Confidence: LowDecision date 9 Oct 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8 m² along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kildare County Council
- Exact reference
- 2360321
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Appeal/FI
The public application record identifies appeal/fi in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Kildare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8 m² along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of Kildare Town Educate Together and Gaelscoil Mhic Aodha, Photovoltaic panels on roof, circa 135m length of access road from Melitta Rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c.4,982 m² of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and GP Hall / dining space (to be converted to specialist classrooms in Phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 No. ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c.5901.8 m² of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a PE hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 No car parking spaces, additional bicycle parking, an SEN garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (Phase 1) drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for Kildare Town Educate Together, adjustment to existing car parking and 1 additional ballcourt for Gaelscoil Mhic Aodha, a service access off the existing access road to the south east along with circa 135m length of access road from Melitta Rd and all ancillary site development works. Revised by Significant Further Information which consists of: Alteration
Application to site progress
-
Applied 24 Oct 2023 2360321
-
Decision Conditional 9 Oct 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2360321
for the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8 m² along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of Kildare Town Educate Together and Gaelscoil Mhic Aodha, Photovoltaic panels on roof, circa 135m length of access road from Melitta Rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c.4,982 m² of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and GP Hall / dining space (to be converted to specialist classrooms in Phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 No. ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c.5901.8 m² of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a PE hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 No car parking spaces, additional bicycle parking, an SEN garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (Phase 1) drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for Kildare Town Educate Together, adjustment to existing car parking and 1 additional ballcourt for Gaelscoil Mhic Aodha, a service access off the existing access road to the south east along with circa 135m length of access road from Melitta Rd and all ancillary site development works. Revised by Significant Further Information which consists of: Alteration
Open official record