Commercial fit-out, Site 11, Kilcullen Business Campus, Kilcullen
for construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Commercial fit-out
The public application record identifies commercial fit-out in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
Application text
for construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route
Application to site progress
-
Applied 19 Jan 2024 2422
-
Decision Conditional 9 Dec 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2422
for construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route