Development Description
for (A) Removal of the original front door from its original position and installation of a new front door with glazed side panels at front of porch. (B) Removal of the original garage door and installation of a new glazed section with a 550mm high wall below. (C) The construction of a new wall with two glazed sections to the west of the existing porch. (D) All associated site works
Map
No coordinates supplied in the public planning feed.