Energy, Ballyvalode, Oola, Co. Limerick
The development will consist of a temporary access track from the N24 to the consented 142-ha Ballyvalode Solar Farm comprising four land parcels (Limerick City and County Council Pl. Ref. 211565, An Bord Pleanála Ref. PL91.312712). The temporary access track will be 375 meters long, 5 m in width and will include two...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 17 Nov 2026; no procurement timetable is published.
Decision due 17 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of a temporary access track from the N24 to the consented 142-ha Ballyvalode Solar Farm comprising four land parcels (Limerick City and County Council Pl. Ref. 211565, An Bord Pleanála Ref. PL91.312712). The temporary access track will be 375 meters long, 5 m in width and will include two designated passing bays of approximately 50 m in length to facilitate the safe passing of construction vehicles and plant machinery. Approximately 40–50 m of localised excavation will be undertaken...
Open scope evidenceNamed firms
Public source roles
- Harmony Solar Limerick Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
- Entrust Ltd
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Limerick City and County Council
- Exact reference
- 2661107
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Harmony Solar Limerick Ltd
- Planning agent
- Entrust Ltd
- Agent address
- Unit 1, First Floor Oranmore Business Park Oranmore H91 P7X8
More Limerick planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of a temporary access track from the N24 to the consented 142-ha Ballyvalode Solar Farm comprising four land parcels (Limerick City and County Council Pl. Ref. 211565, An Bord Pleanála Ref. PL91.312712). The temporary access track will be 375 meters long, 5 m in width and will include two designated passing bays of approximately 50 m in length to facilitate the safe passing of construction vehicles and plant machinery. Approximately 40–50 m of localised excavation will be undertaken to facilitate the connection of the floating road to the existing founded road (i.e. the N24 and a gravel access track), with the excavated material replaced by permeable macadam to minimise surface water runoff onto the N24. A drainage swale will be provided along the north-eastern side of the access track to collect and convey surface water, with the track designed to incorporate a 2% crossfall towards the swale to promote effective drainage. The development also includes designated entrance and exit points, perimeter fencing and gates, temporary on-site storage of excavated material pending reinstatement, and all associated ancillary site development works. A NIS has been prepared and will be submitted to the Planning Authority with the application.
Application to site progress
-
Applied 23 Sep 2026 2661107
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2661107
The development will consist of a temporary access track from the N24 to the consented 142-ha Ballyvalode Solar Farm comprising four land parcels (Limerick City and County Council Pl. Ref. 211565, An Bord Pleanála Ref. PL91.312712). The temporary access track will be 375 meters long, 5 m in width and will include two designated passing bays of approximately 50 m in length to facilitate the safe passing of construction vehicles and plant machinery. Approximately 40–50 m of localised excavation will be undertaken to facilitate the connection of the floating road to the existing founded road (i.e. the N24 and a gravel access track), with the excavated material replaced by permeable macadam to minimise surface water runoff onto the N24. A drainage swale will be provided along the north-eastern side of the access track to collect and convey surface water, with the track designed to incorporate a 2% crossfall towards the swale to promote effective drainage. The development also includes designated entrance and exit points, perimeter fencing and gates, temporary on-site storage of excavated material pending reinstatement, and all associated ancillary site development works. A NIS has been prepared and will be submitted to the Planning Authority with the application.
Open official record