GrantedDecision recorded

Public / civic, Coláiste De Lacy Ashbourne Education Campus, Ballybin, Ashbourne...

Ballybin, Meath · Meath County Council · Plan 2460514 · PB ref PB-10000343596

the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and...

Indicative value €10m–30m PB indicative band
Units applied for Not listed public application record
Floor area 5,045 m² published reliable figure
Decision 20 Jan 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 20 Jan 2025. / Confidence: Low
Decision CONDITIONAL

Decision date 20 Jan 2025.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation...

Ref 2460514 Source-linked Official application description for exact planning reference 2460514

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Meath County Council
Exact reference
2460514
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Public / civic

Public / civic

The public application record identifies public / civic in the submitted planning scope.

2460514Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23 m² Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045 m² Proposed site works to include the construction of new 25 m² standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48 m² external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460514

the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23 m² Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045 m² Proposed site works to include the construction of new 25 m² standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48 m² external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.

AuthorityMeath County Council
Reference2460514
StatusChecked 2 Jun 2026
Open official record