Public / civic, Coláiste De Lacy Ashbourne Education Campus, Ballybin, Ashbourne...
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 20 Jan 2025. / Confidence: LowDecision date 20 Jan 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 2460514
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Public / civic
The public application record identifies public / civic in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23 m² Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045 m² Proposed site works to include the construction of new 25 m² standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48 m² external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.
Application to site progress
-
Applied 10 Jul 2024 2460514
-
Decision Conditional 20 Jan 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460514
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23 m² Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045 m² Proposed site works to include the construction of new 25 m² standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48 m² external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.
Open official record