Infrastructure, Ballynamona, Summerhill, County Meath
the development will consist of the reinstatement of the existing quarry at Ballynamona, by importing 223,000 tonnes per annum of soil and stone over a 14-year period, with the final profiling and landscaping completed in the following year. The annual soil and stone intake will comprise approximately 128,000 tonnes of...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Kilsaran Concrete Unlimited Company
Application text
the development will consist of the reinstatement of the existing quarry at Ballynamona, by importing 223,000 tonnes per annum of soil and stone over a 14-year period, with the final profiling and landscaping completed in the following year. The annual soil and stone intake will comprise approximately 128,000 tonnes of non-waste materials notified as by-product under the Article 27 By Product Regulation and up to a maximum of 95,000 tonnes of inert soil and stone classified as waste. The quantity of non-waste material may vary from year to year, while the volume of waste material shall not exceed 95,000 tonnes in any calendar year. The total annual intake of soil and stone will not exceed 223,000 tonnes in any given year. The proposed development also allows for the provision of an additional wheel-wash, two weighbridges, site/weighbridge office and welfare facilities (c. 52sq. m), a waste acceptance quarantine area and a proprietary sanitary wastewater treatment system, and all associated works within an overall application area of 23.8 ha. The reinstatement will require a Soil Recovery Licence issued by the Environmental Protection Agency (EPA). The planning application is accompanied by an Environmental Impact Assessment Report
Application to site progress
-
Applied 24 Jul 2026 2660930
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2660930
the development will consist of the reinstatement of the existing quarry at Ballynamona, by importing 223,000 tonnes per annum of soil and stone over a 14-year period, with the final profiling and landscaping completed in the following year. The annual soil and stone intake will comprise approximately 128,000 tonnes of non-waste materials notified as by-product under the Article 27 By Product Regulation and up to a maximum of 95,000 tonnes of inert soil and stone classified as waste. The quantity of non-waste material may vary from year to year, while the volume of waste material shall not exceed 95,000 tonnes in any calendar year. The total annual intake of soil and stone will not exceed 223,000 tonnes in any given year. The proposed development also allows for the provision of an additional wheel-wash, two weighbridges, site/weighbridge office and welfare facilities (c. 52sq. m), a waste acceptance quarantine area and a proprietary sanitary wastewater treatment system, and all associated works within an overall application area of 23.8 ha. The reinstatement will require a Soil Recovery Licence issued by the Environmental Protection Agency (EPA). The planning application is accompanied by an Environmental Impact Assessment Report