10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 28 Apr 2025. / Confidence: LowDecision date 28 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 2560220
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application
Application to site progress
-
Applied 5 Mar 2025 2560220
-
Decision Conditional 28 Apr 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560220
10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application