Infrastructure, ARDEN ROAD, TULLAMORE, CO. OFFALY
THE PROPOSED DEVELOPMENT AND WORKS CONSISTING OF AMENDMENTS TO DEVELOPMENT PERMITTED UNDER OFFALY COUNTY COUNCIL REG. REF. 15/204 AS AMENDED BY REG. REF. 16/93, TO INCLUDE: (A) RETENTION OF RELOCATED FOOTPRINT OF THE PERMITTED HIGH-DENSITY POLYETHYLENE (HDPE) PROCESSING BUILDING; (B) RETENTION OF EXTENSION OF THE PERMITTED...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 13 Dec 2024. / Confidence: LowDecision date 13 Dec 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
THE PROPOSED DEVELOPMENT AND WORKS CONSISTING OF AMENDMENTS TO DEVELOPMENT PERMITTED UNDER OFFALY COUNTY COUNCIL REG. REF. 15/204 AS AMENDED BY REG. REF. 16/93, TO INCLUDE: (A) RETENTION OF RELOCATED FOOTPRINT OF THE PERMITTED HIGH-DENSITY POLYETHYLENE (HDPE) PROCESSING BUILDING; (B) RETENTION OF EXTENSION OF THE PERMITTED HDPE PROCESSING BUILDING BY APPROXIMATELY 880 m² (FROM 1,400 m² AS PERMITTED TO 2,280 m²) AND PROVISION OF ASSOCIATED ENCLOSED EXTERNAL STORAGE AREA (APPROX.6 40 m²) IMMEDIATELY EAST OF THE...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Offaly County Council
- Exact reference
- 2472
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Offaly planning activity
These are county discovery links, not claimed relationships to this application.
Application text
THE PROPOSED DEVELOPMENT AND WORKS CONSISTING OF AMENDMENTS TO DEVELOPMENT PERMITTED UNDER OFFALY COUNTY COUNCIL REG. REF. 15/204 AS AMENDED BY REG. REF. 16/93, TO INCLUDE: (A) RETENTION OF RELOCATED FOOTPRINT OF THE PERMITTED HIGH-DENSITY POLYETHYLENE (HDPE) PROCESSING BUILDING; (B) RETENTION OF EXTENSION OF THE PERMITTED HDPE PROCESSING BUILDING BY APPROXIMATELY 880 m² (FROM 1,400 m² AS PERMITTED TO 2,280 m²) AND PROVISION OF ASSOCIATED ENCLOSED EXTERNAL STORAGE AREA (APPROX.6 40 m²) IMMEDIATELY EAST OF THE BUILDING; (C) RETENTION OF AMENDMENTS TO THE PERMITTED ELEVATIONS, INCLUDING INCREASED BUILDING HEIGHT BY APPROXIMATELY 2 METRES; (D) RETENTION OF EXTERNAL PIPE STORAGE AREA OVER AN AREA OF APPROX.8,377 m²; (E) PERMISSION FOR EXTENSION FOR THE EXTERNAL PIPE STORAGE AREA OVER AN AREA OF APPROX. 1.77HA; (F) RETENTION OF RAINWATER HARVESTING TANKS, 5 NO. UNDERGROUND WASTEWATER TREATMENT PLANT TANKS, AND 1 NO. ABOVE GROUND PROCESS WATER TANK; (G) RETENTION OF ALL AMENDMENTS TO PERMITTED CAR PARKING INCLUDING AN INCREASE BY 3 NO. CAR PARKING SPACES (FROM 5 NO. SPACES AS PERMITTED TO 8 NO. SPACES EXISTING); (H) PERMISSION FOR THE PROVISION OF A FOOTPATH FROM THE SITE ENTRANCE TO THE BUILDING, AND ALONG THE SOUTHERN ELEVATION OF THE BUILDING; (I) PERMISSION FOR SURFACE WATER DRAINAGE INFRASTRUCTURE INCLUDING SOAKAWAY, HYDROBRAKE AND PIPED INFRASTRUCTURE; (J) PERMISSION FOR AN UNDERGROUND TANK FOR FIRE-FIGHTING PURPOSES; (K) RETENTION OF BOUNDARY TREATMENT; AND, (L) ALL ANCILLARY DEVELOPMENT AND WORKS ON AN OVERALL SITE AREA OF 3.9HA
Application to site progress
-
Applied 14 Jun 2024 2472
-
Decision Conditional 13 Dec 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2472
THE PROPOSED DEVELOPMENT AND WORKS CONSISTING OF AMENDMENTS TO DEVELOPMENT PERMITTED UNDER OFFALY COUNTY COUNCIL REG. REF. 15/204 AS AMENDED BY REG. REF. 16/93, TO INCLUDE: (A) RETENTION OF RELOCATED FOOTPRINT OF THE PERMITTED HIGH-DENSITY POLYETHYLENE (HDPE) PROCESSING BUILDING; (B) RETENTION OF EXTENSION OF THE PERMITTED HDPE PROCESSING BUILDING BY APPROXIMATELY 880 m² (FROM 1,400 m² AS PERMITTED TO 2,280 m²) AND PROVISION OF ASSOCIATED ENCLOSED EXTERNAL STORAGE AREA (APPROX.6 40 m²) IMMEDIATELY EAST OF THE BUILDING; (C) RETENTION OF AMENDMENTS TO THE PERMITTED ELEVATIONS, INCLUDING INCREASED BUILDING HEIGHT BY APPROXIMATELY 2 METRES; (D) RETENTION OF EXTERNAL PIPE STORAGE AREA OVER AN AREA OF APPROX.8,377 m²; (E) PERMISSION FOR EXTENSION FOR THE EXTERNAL PIPE STORAGE AREA OVER AN AREA OF APPROX. 1.77HA; (F) RETENTION OF RAINWATER HARVESTING TANKS, 5 NO. UNDERGROUND WASTEWATER TREATMENT PLANT TANKS, AND 1 NO. ABOVE GROUND PROCESS WATER TANK; (G) RETENTION OF ALL AMENDMENTS TO PERMITTED CAR PARKING INCLUDING AN INCREASE BY 3 NO. CAR PARKING SPACES (FROM 5 NO. SPACES AS PERMITTED TO 8 NO. SPACES EXISTING); (H) PERMISSION FOR THE PROVISION OF A FOOTPATH FROM THE SITE ENTRANCE TO THE BUILDING, AND ALONG THE SOUTHERN ELEVATION OF THE BUILDING; (I) PERMISSION FOR SURFACE WATER DRAINAGE INFRASTRUCTURE INCLUDING SOAKAWAY, HYDROBRAKE AND PIPED INFRASTRUCTURE; (J) PERMISSION FOR AN UNDERGROUND TANK FOR FIRE-FIGHTING PURPOSES; (K) RETENTION OF BOUNDARY TREATMENT; AND, (L) ALL ANCILLARY DEVELOPMENT AND WORKS ON AN OVERALL SITE AREA OF 3.9HA
Open official record