Development Description
for the development of the following: 1. Proposed alterations externally at existing main entrance – consisting of the regrading of the existing public footpath to create level access to the banking hall, while preserving the fabric of the existing Protected Structure, 2. Installation of surface water drain at entrance threshold to connect to existing public surface water drainage, 3. All associated site works
Map
No coordinates supplied in the public planning feed.