Infrastructure, CROCKAHENNY, LEAMACROSSAN HILL, INISHOWEN
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 1 May 2025. / Confidence: LowDecision date 1 May 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARDSTANDINGS AND ASSEMBLY AREAS, TRANSFORMERS AND ASSOCIATED DRAINAGE; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2560337
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARDSTANDINGS AND ASSEMBLY AREAS, TRANSFORMERS AND ASSOCIATED DRAINAGE; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE (OF 21M AND 29M IN LENGTH); INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE EXISTING SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING
Application to site progress
-
Applied 11 Mar 2025 2560337
-
Decision Conditional 1 May 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560337
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARDSTANDINGS AND ASSEMBLY AREAS, TRANSFORMERS AND ASSOCIATED DRAINAGE; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE (OF 21M AND 29M IN LENGTH); INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE EXISTING SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING