Infrastructure, ILLIES, LIFFORD PO, CO. DONEGAL
A PERIOD OF 10 YEARS FOR UPGRADES TO THE EXISTING ILLIES WATER TREATMENT PLANT CONSISTING OF: (1) NEW DISSOLVED AIR FLOTATION BUILDING TO BE CONSTRUCTED ADJACENT TO THE EXISTING DISSOLVED AIR FLOTATION BUILDING, HOUSING A FOURTH DISSOLVED AIR FLOTATION STREAM OF SIMILAR HEIGHT BUT WITH A SMALLER FOOTPRINT THAN THE EXISTING...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
A PERIOD OF 10 YEARS FOR UPGRADES TO THE EXISTING ILLIES WATER TREATMENT PLANT CONSISTING OF: (1) NEW DISSOLVED AIR FLOTATION BUILDING TO BE CONSTRUCTED ADJACENT TO THE EXISTING DISSOLVED AIR FLOTATION BUILDING, HOUSING A FOURTH DISSOLVED AIR FLOTATION STREAM OF SIMILAR HEIGHT BUT WITH A SMALLER FOOTPRINT THAN THE EXISTING DISSOLVED AIR FLOTATION BUILDING, (2) TWO NEW FIRST STAGE RAPID GRAVITY FILTERS TO BE CONSTRUCTED AS AN EXTENSION TO THE EXISTING SIX RAPID GRAVITY FILTERS, (3) UPGRADE OF THE EXISTING SECOND...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2661681
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Uisce Éireann
- Planning agent
- Care of Laurie McGee
- Agent address
- UNIT E4, NUTGROVE OFFICE PARK NUTGROVE AVENUE DUBLIN 14 D14V3F6
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
A PERIOD OF 10 YEARS FOR UPGRADES TO THE EXISTING ILLIES WATER TREATMENT PLANT CONSISTING OF: (1) NEW DISSOLVED AIR FLOTATION BUILDING TO BE CONSTRUCTED ADJACENT TO THE EXISTING DISSOLVED AIR FLOTATION BUILDING, HOUSING A FOURTH DISSOLVED AIR FLOTATION STREAM OF SIMILAR HEIGHT BUT WITH A SMALLER FOOTPRINT THAN THE EXISTING DISSOLVED AIR FLOTATION BUILDING, (2) TWO NEW FIRST STAGE RAPID GRAVITY FILTERS TO BE CONSTRUCTED AS AN EXTENSION TO THE EXISTING SIX RAPID GRAVITY FILTERS, (3) UPGRADE OF THE EXISTING SECOND STAGE RAPID GRAVITY FILTERS TO DUAL-MEDIA CONFIGURATION, INCLUDING MODIFICATIONS TO WEIRS, UNDERDRAINS, AND AIR SYSTEMS, (4) NEW SLUDGE CONCENTRATOR TANK (258M³) TO BE INSTALLED ADJACENT TO THE EXISTING SLUDGE CONCENTRATORS, (5) UPGRADE OF THE EXISTING SLUDGE DEWATERING SYSTEM, INCLUDING PROVISION OF A HIGH-CAPACITY FILTER PRESS, AUTOMATED CONVEYOR SYSTEM, AND A COVERED TRAILER LOADING BAY, (6) DEMOLITION OF THE EXISTING WORKSHOP, AND CONSTRUCTION OF A NEW WORKSHOP AT AN ALTERNATE LOCATION WITHIN THE SITE, (7) NEW EXTERNAL ALUMINIUM SULPHATE (ALUM) BULK STORAGE, COMPRISING TWO 86M³ BUNDED TANKS, (8) MODIFICATION OF THE EXISTING ALUM STORAGE BUILDING TO HOUSE A NEW SODA ASH SILO. BUILDING HEIGHT WILL BE INCREASED TO MATCH THE EXISTING ADJACENT STRUCTURE HOUSING SODA ASH SILOS, (9) INTERNAL MODIFICATIONS TO EXISTING BUILDINGS (I.E., REMOVAL OF WALL) TO ACCOMMODATE NEW AND UPGRADED SYSTEMS, INCLUDING DOSING ARRANGEMENTS, BACKWASH PUMPS, AND AIR BLOWERS, (10) ELECTRICAL, INSTRUMENTATION, CONTROL AND AUTOMATION SYSTEM UPGRADES, INCLUDING A NEW SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM, NEW PANELS, AND INPUT AND OUTPUT SIGNAL MODIFICATIONS TO SUPPORT ADDITIONAL EQUIPMENT, (11) SOLAR PHOTOVOLTAIC PANELS TO BE INSTALLED ON ROOF AREAS TO SUPPORT ENERGY EFFICIENCY AND RENEWABLE ENERGY TARGETS, (12) IMPROVEMENT OF INTERNAL ROAD LAYOUT AND ACCESS ROUTES TO FACILITATE OPERATIONAL EFFICIENCY AND SITE DELIVERIES, (13) NEW FENCING AND GATES TO BE INSTALLED WHERE REQUIRED (MAXIMUM HEIGHT 2.4M), (14) LANDSCAPING, SCREENING, PLANTING AND BIODIVERSITY IMPROVEMENT MEASURES AND (15) ALL ANCILLARY SITE DEVELOPMENT WORKS
Application to site progress
-
Applied 10 Sep 2026 2661681
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2661681
A PERIOD OF 10 YEARS FOR UPGRADES TO THE EXISTING ILLIES WATER TREATMENT PLANT CONSISTING OF: (1) NEW DISSOLVED AIR FLOTATION BUILDING TO BE CONSTRUCTED ADJACENT TO THE EXISTING DISSOLVED AIR FLOTATION BUILDING, HOUSING A FOURTH DISSOLVED AIR FLOTATION STREAM OF SIMILAR HEIGHT BUT WITH A SMALLER FOOTPRINT THAN THE EXISTING DISSOLVED AIR FLOTATION BUILDING, (2) TWO NEW FIRST STAGE RAPID GRAVITY FILTERS TO BE CONSTRUCTED AS AN EXTENSION TO THE EXISTING SIX RAPID GRAVITY FILTERS, (3) UPGRADE OF THE EXISTING SECOND STAGE RAPID GRAVITY FILTERS TO DUAL-MEDIA CONFIGURATION, INCLUDING MODIFICATIONS TO WEIRS, UNDERDRAINS, AND AIR SYSTEMS, (4) NEW SLUDGE CONCENTRATOR TANK (258M³) TO BE INSTALLED ADJACENT TO THE EXISTING SLUDGE CONCENTRATORS, (5) UPGRADE OF THE EXISTING SLUDGE DEWATERING SYSTEM, INCLUDING PROVISION OF A HIGH-CAPACITY FILTER PRESS, AUTOMATED CONVEYOR SYSTEM, AND A COVERED TRAILER LOADING BAY, (6) DEMOLITION OF THE EXISTING WORKSHOP, AND CONSTRUCTION OF A NEW WORKSHOP AT AN ALTERNATE LOCATION WITHIN THE SITE, (7) NEW EXTERNAL ALUMINIUM SULPHATE (ALUM) BULK STORAGE, COMPRISING TWO 86M³ BUNDED TANKS, (8) MODIFICATION OF THE EXISTING ALUM STORAGE BUILDING TO HOUSE A NEW SODA ASH SILO. BUILDING HEIGHT WILL BE INCREASED TO MATCH THE EXISTING ADJACENT STRUCTURE HOUSING SODA ASH SILOS, (9) INTERNAL MODIFICATIONS TO EXISTING BUILDINGS (I.E., REMOVAL OF WALL) TO ACCOMMODATE NEW AND UPGRADED SYSTEMS, INCLUDING DOSING ARRANGEMENTS, BACKWASH PUMPS, AND AIR BLOWERS, (10) ELECTRICAL, INSTRUMENTATION, CONTROL AND AUTOMATION SYSTEM UPGRADES, INCLUDING A NEW SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM, NEW PANELS, AND INPUT AND OUTPUT SIGNAL MODIFICATIONS TO SUPPORT ADDITIONAL EQUIPMENT, (11) SOLAR PHOTOVOLTAIC PANELS TO BE INSTALLED ON ROOF AREAS TO SUPPORT ENERGY EFFICIENCY AND RENEWABLE ENERGY TARGETS, (12) IMPROVEMENT OF INTERNAL ROAD LAYOUT AND ACCESS ROUTES TO FACILITATE OPERATIONAL EFFICIENCY AND SITE DELIVERIES, (13) NEW FENCING AND GATES TO BE INSTALLED WHERE REQUIRED (MAXIMUM HEIGHT 2.4M), (14) LANDSCAPING, SCREENING, PLANTING AND BIODIVERSITY IMPROVEMENT MEASURES AND (15) ALL ANCILLARY SITE DEVELOPMENT WORKS