Balleeghan upper, culkeeny, inishowen, Co. Donegal
2 no. Single storey prefab teaching units / pods at the rear of the existing etb further education and training centre building and all associated site development works
Co. Donegal
8 planning applications · 2 site starts · latest 5 Oct 2026
Source: each council's planning register. Every record below links to its own page and to the council's file.
Newest first
2 no. Single storey prefab teaching units / pods at the rear of the existing etb further education and training centre building and all associated site development works
A period of 10 years for construction of approximately 13 kilometres of strategic trunk watermain to replace the existing watermain between buncrana and burt within the carriageway of the r238 and r239...
A period of 10 years for a long duration energy storage facility which will consist of the following elements: installation and operation of 1 no. Energy storage system compound containing energy storage...
A period of 10 years for the proposed development which will consist of the following elements: installation and operation of 1 no. New 38kv substation, including a new 38kv building and compound, 38kv...
(1) construction of a single storey extension with extensive demolition and renovations to an existing single storey dwelling consisting of a new entrance hall with an open plan living/kitchen/dining to...
In Inishowen
In Inishowen
Dated since 1 Nov
Newest record date
3 of 10 · then One-off house, New build
Earlier records
A 10-year planning permission for the construction of two wind turbines within the landholding of the crockahenny windfarm and all associated works including two wind turbines that will have an overall...
(1) demolition of existing dwelling (as approved under planning ref. Nos. 95/1228 & 00/5403) due to defective concrete blockwork (mica), (2) construction of a replacement dwelling with connection to all...
Dwelling house, domestic garage, entrance, installation of wastewater treatment system and associated percolation area and all associated siteworks
three turbine wind farm with roads, hardstandings, turbine foundations, a 38kV substation build & compound and associated works. All works as per planning numbers 12/50963 & 09/70448
Construction of control building/sub station with fenced compound and site works at existing wind farm site at Sladran TD Inishown Co Donegal