Development Description
PROTECTED STRUCTURE:The development will comprise the removal of the existing automated arm security barrier system at the vehicular entrance/exit onto King Street North and replace the arm barrier with a painted metal, automated telescopic vehicular access gate with associated fencing and will also include a separate pedestrian access gate in the same location as the current arm barrier system. No works or alterations are proposed to the existing boundary fencing or existing wrought iron gates or to the former St. Paul's Church which is a Recorded Monument (DU018-020414) and Protected Structure and lies within a Zone of Archaeological Interest.
Map
No coordinates supplied in the public planning feed.