Protected structure, Royal Victoria Eye & Ear Hospital, Adelaide Road, Dublin 2...
PROTECTED STRUCTURE The development will consist of:The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 3 Sep 2026. / Confidence: LowDecision date 3 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE The development will consist of:The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the eastern flight of the main entrance hall stairs to access the proposed new lift; The removal of an area of floor to the existing ground floor consultant's room, replacing this with a lower...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Confidence & provenance 1 official source
- Authority
- Dublin City Council
- Exact reference
- WEB2721/26
- Evidence reviewed
- 17 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- the Royal Victoria Eye and Ear Hospital
- Planning agent
- Ruairi Gaffney
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE The development will consist of:The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the eastern flight of the main entrance hall stairs to access the proposed new lift; The removal of an area of floor to the existing ground floor consultant's room, replacing this with a lower area of flooring to provide level access from entrance level to the proposed lift; The provision of cross-corridor doors to lower ground floor level to form a protected lobby around the new lift and stairs flight; The reorganisation of ancillary rooms to the lower ground floor and first floor level arising out of the impact of the new lift shaft; The provision of architectural treatments to and around the proposed lift shaft to the consultant's room at ground floor level to mitigate the conservation impact of the proposed works; The provision of a new stairs flight linking entrance level to lower ground floor level underneath the eastern flight of the main entrance hall stairs involving removal of a small area of floor; The adjustment of the original main entrance doors of the hospital building to reverse the door swing and facilitate better access to the new lift provided; The replacement of the lift cars and mechanisms to the existing main passenger lift and existing goods lift, and the removal of the existing, non-original, fire rated joinery doors to these lifts as they will no longer be required; Minor ancillary works, such as the making good of finishes, associated with the provision of the above.
Application to site progress
-
Applied 10 Jul 2026 WEB2721/26
-
Decision Grant Permission 3 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2721/26
PROTECTED STRUCTURE The development will consist of:The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the eastern flight of the main entrance hall stairs to access the proposed new lift; The removal of an area of floor to the existing ground floor consultant's room, replacing this with a lower area of flooring to provide level access from entrance level to the proposed lift; The provision of cross-corridor doors to lower ground floor level to form a protected lobby around the new lift and stairs flight; The reorganisation of ancillary rooms to the lower ground floor and first floor level arising out of the impact of the new lift shaft; The provision of architectural treatments to and around the proposed lift shaft to the consultant's room at ground floor level to mitigate the conservation impact of the proposed works; The provision of a new stairs flight linking entrance level to lower ground floor level underneath the eastern flight of the main entrance hall stairs involving removal of a small area of floor; The adjustment of the original main entrance doors of the hospital building to reverse the door swing and facilitate better access to the new lift provided; The replacement of the lift cars and mechanisms to the existing main passenger lift and existing goods lift, and the removal of the existing, non-original, fire rated joinery doors to these lifts as they will no longer be required; Minor ancillary works, such as the making good of finishes, associated with the provision of the above.
Open official record