Commencement

Infrastructure, Knockatee, Tipperary - Planning Application 22456

Tipperary / Knockatee / Knockatee, Tipperary

Est. value €3m–10m
Units Not listed
Floor area 3,388 m²
Commenced 3 Apr 2026

Source-linked planning record

Infrastructure, Knockatee, Tipperary - Planning Application 22456

Tipperary / Knockatee / Knockatee, Tipperary
PB ref
PB-412619
Plan ref
22456
Authority
Tipperary County Council
Stage / date
Commencement / 3 Apr 2026
Est. value band
€3m–10m
Units / floor
3,388 m²
Project class
Infrastructure
Promoter
not available yet
Architect / agent
AGC Ventures LTD T/a AGC Construction

Source: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/22456/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Planning authority
Tipperary County Council
Application reference
22456
Applicant
not available yet
Agent
AGC Ventures LTD T/a AGC Construction
Decision stage
Commencement
Commenced
3 Apr 2026
Floor area
3,388 m²
Builder / developer
AGC Ventures LTD T/a AGC Construction

Official description

Verbatim source text

an All-Weather Horse Race Track integrated around the existing turf track to include: new 2.2km long sand based track ranging in width from 14-18m including 3 furlong sprint chute extension, 3.2m wide Gallop inc. all assoc. site infrastructure such as railings, start locations and other ancillary infrastructure, new Underpass to All Weather and Turf Track, surface water drainage system to new track inc. storm water attenuation pond and storm water retention pond located inside the existing turf track, attenuation pond to the NW of the new all-weather track, modifications to existing turf track to facilitate new track, dedicated 3.0 to 3.5m wide circulation track to perimeter of new track for movement of emergency and service vehicles, new underpass for movement of vehicles from outer to inner track areas, treatment and upgrade to existing site boundaries, demolition of existing stable block (60 stables) and erection of new stable blocks comprising of 82 stables and assoc. works, demolition of Ancillary Building of 18 m², removal of existing parade ring (1,265 m²) and construction of new parade ring (1,565 m²) and assoc. works, demolition of maintenance shed of 180 m² and construction of new maintenance shed of 360 m², provision of 1No. permanent fixed steel tower of 10m in height together with 7 no. of vehicle hardstands to facilitate televisions and communications requirements, new LED floodlighting ranging in height from 12 to 34m to full perimeter of new track and assoc. cabling/ducting, new LED lighting to proposed stable block and adjacent areas, new ESB infrastructure inc. MV / LV Substation, MV Switch Room, Transformer Room and LV Switch room, consolidation of existing 4No. vehicular access points from the N24 into 3No. access points and internal modifications to carpark and internal circulation routes, proposed surface water drainage to new All Weather Track including culverting and/or diverting of existing watercourses, water ring main and assoc. hydrants to facilitate watering of the existing turf track served by proposed new well inc. submersible pump chamber and above ground control kiosk, landscaping including hedgerow and tree removal, decommissioning existing foul treatment system and new connection to IW infrastructure, new signage at site boundary along the N24 and all assoc. site works including security offices, fencing, embankments, ducting and site services. The planning application is accompanied by a Natura lmpact Statement

Verify against official source

Project team

Named source parties

Promoter
not available yet
Planning agent
AGC Ventures LTD T/a AGC Construction
Builder / developer
AGC Ventures LTD T/a AGC Construction

Lifecycle timeline

Application to site progress

  1. Applied

    5 Jul 2022 22456
  2. Decision

    Conditional 19 Aug 2022
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    No commencement indexed No reliable public commencement record is indexed against this permission.
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalFire SafetyGroundworksHealth & SafetyMain contractorMechanicalSecuritySolar/Energy