Agent / architect profile

Custy Construction Ltd planning activity

Public planning-register leads grouped for pipeline research. Verify all details against the official source before acting.

Website not listedRSS feed

Last updated 2026-06-03 19:24 UTC public planning-register data

Agent / architect pipeline

Summary

Public leads
3
Indicative pipeline value
EUR 13m
Estimated residential units
28
Counties
Limerick (1), Galway (1), Tipperary (1)
Project types
Protected structure (2), Mixed use (1)

Count by stage

  • Commencement3

Activity timeline

MonthPublic leads
2026-021
2025-051
2025-011

3 matching leads

Planning leads linked to Custy Construction Ltd

Limerick County Council / 2461298 / 2026-02-23

Limerick

the change of use of ground floor and basement floor premises from retail to restaurant use, and the change of use of first floor and second floor accommodation from office use to residential use. The application includes proposed amendments to the existing...

Stage
Commencement
Value band
EUR 3m-10m
Applicant
Frogbox Ltd
Units / floor
12 units / floor unknown (units summed from description)
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
Custy Construction Ltd
Fire / FSC likelyMixed useVacant / reuse signalGoing to site
Galway County Council / LA-E/04/24 / 2025-05-07

Ballinasloe, Galway

Renovate and extend the existing terraced buildings at Dunlo Hill, including “Dooley’s Pub” (protected structure RPS ref 2730) to create a residential housing development comprising of; 10 no. two-storey one- bed dwelling, 2 no. two-storey two-bed dwelling,...

Stage
Commencement
Value band
EUR 3m-10m
Applicant
not yet scraped
Units / floor
16 units / floor unknown
Useful for
ComplianceConservation specialistFire SafetyHealth & SafetyPlanner/Consultant
Agent
Custy Construction Ltd
Fire / FSC likelyH&S triggerProtected structureVacant / reuse signal
Lead page
Tipperary County Council / 2360387 / 2025-01-06

cloughjordan, Tipperary

1. (a) the continued presence and use of the temporary marquee, bar and barbeque area, ancillary toilet block, kitchen, and storage portacabins for a maximum of an additional 2 years following the expiry of the temporary timeframe for these structures permi...

Stage
Commencement
Value band
Unknown - verify
Applicant
JHS Events Ltd
Units / floor
units unknown / floor unknown
Useful for
ComplianceConservation specialistElectricalHealth & SafetyPlanner/Consultant
Agent
Custy Construction Ltd
EnergyH&S triggerProtected structureVacant / reuse signal