New build
26 Jun 2026 · Latest notice
3 notices · phased
Ballincrokig, Cork · Cork City Council · Planning ref ABP-320996-24 [24/42789]
Construction of 24no. houses and 2no. apartment blocks with each apartment block consisting of 4no. apartments at Dublin Pike, Ballincrokig, Cork. [House Nos 1-4, 9-14, 47-48, 93-104] & [Apt Nos 5-8, 15-18]
Notice identity Works stated Scale Commenced
CN0144029CY BCMS open-data feed
Construction of 6no. houses at Coppenger Woods, Dublin Pike, Ballincrokig, Cork. [House Nos 49-54]
6 units · 744.6 m²Builder not named
26 Jun 2026
CN0136929CY BCMS owner-supplied export
Construction of 24no. houses and 2no. apartment blocks with each apartment block consisting of 4no. apartments at Dublin Pike, Ballincrokig, Cork. [House Nos 1-4, 9-14, 47-48, 93-104] & [Apt Nos 5-8, 15-18]
32 units · 3,313.9 m²Builder named
18 Dec 2025
CN0127790CY BCMS owner-supplied export
Construction of 28no. houses at Dublin Pike, Ballincrokig, Cork. [House Nos 19-46]
28 units · 3,384.2 m²Builder named
22 Apr 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 Jun 2026 · Latest notice
4 notices · phased
Dungarvan, Waterford · Waterford City and County Council · Planning ref 2560097
Ph1 (16) Housing development at Duckspool, Abbeyside, Dungarvan, Co. Waterford
Notice identity Works stated Scale Commenced
CN0143648WD BCMS owner-supplied export
Ph1 (4) Housing development at Duckspool, Abbeyside, Dungarvan, Co. Waterford
4 units · 740.5 m²Builder named
22 Jun 2026
CN0143562WD BCMS open-data feed
Ph1 (5) Housing development at Duckspool, Abbeyside, Dungarvan, Co.Waterford
5 units · 584.1 m²Builder not named
20 Apr 2026
CN0136924WD BCMS owner-supplied export
Ph1 (16) Housing development at Duckspool, Abbeyside, Dungarvan, Co. Waterford
42 units · 2,374.9 m²Builder named
05 Jan 2026
CN0136764WD BCMS open-data feed
Ph1 Housing development at Duckspool, Abbeyside, Dungarvan, Co. Waterford
44 units · 5,560.9 m²Builder not named
19 Dec 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 Jun 2026 · Latest notice
25 notices · phased
Ashbourne, Meath · Meath County Council · Planning ref ABP-314550-22
Construction of a new five-storey development (Block B1),containing a Shell and Core Retail Unit and 57 No. Apartments with a ground floor car park at Coach Ashbourne, Co. Meath
Notice identity Works stated Scale Commenced
CN0143734MH BCMS owner-supplied export
Construction of a new five-storey development (Block B1),containing a Shell and Core Retail Unit and 57 No. Apartments with a ground floor car park at Coach Ashbourne, Co. Meath
57 units · 8,118.9 m²Builder not named
22 Jun 2026
CN0143640MH BCMS open-data feed
Construction of a new six-storey development (Block A1), containing 92 No. Apartments, Shell and Core retail units over basement car park at Coach Ashbourne, Co. Meath.
92 units · 14,702.4 m²Builder not named
19 Jun 2026
SN0014204MH BCMS open-data feed
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 72) and a duplex maisonette above (Unit No. 71). Address: Cherry Lane, Ashbourne, Co.Meath
2 units · 237.6 m²Builder not named
25 May 2026
SN0014205MH BCMS open-data feed
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 49) and a duplex maisonette above (Unit No. 50).
2 units · 237.6 m²Builder not named
25 May 2026
SN0014207MH BCMS open-data feed
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 73) and a duplex maisonette above (Unit No. 74). Address: Cherry Lane, Ashbourne, Co.Meath
2 units · 237.6 m²Builder not named
25 May 2026
CN0135328MH BCMS owner-supplied export
Commencement of 50 No. of houses at Cherry Lane, Ashbourne, Co. Meath
202 units · 6,612 m²Builder not named
06 Nov 2025
SN0012846MH BCMS open-data feed
Construction of a new Triplex apartment block 13, 31-33 Coach Avenue, Cherry Lane, Ashbourne, County Meath
3 units · 335.1 m²Builder not named
31 Jul 2025
NBCO:CN0120438MH NBCO historical file
Commencement of 39 No of houses at Cherry Lane, Ashbourne, Co. Meath
247 units · 931 m²Builder not named
03 Oct 2024
CN0120438MH BCMS owner-supplied export
Commencement of 39 No of houses at Cherry Lane, Ashbourne, Co. Meath
202 units · 4,464 m²Builder not named
03 Oct 2024
CN0113878MH BCMS open-data feed
Commencement of 128 No of houses at Cherry Lane, Ashbourne, Co. Meath
128 units · 14,903.8 m²Builder not named
24 Apr 2024
SN0010211MH BCMS open-data feed
Construction of a new Triplex apartment block 6, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
CN0113850MH BCMS owner-supplied export
Commencement of 6 No of houses at Cherry Lane, Ashbourne, Co. Meath
36 units · 789.4 m²Builder named
24 Apr 2024
SN0010157MH BCMS open-data feed
The development consists of a three-storey building with 3 no. 2-bed apartments and all associated site development works.
3 units · 352.3 m²Builder not named
24 Apr 2024
SN0010159MH BCMS open-data feed
The development consists of a Three-Storey Building with 10 no. Apartments and Green roof on second and third floor and all associated site development works
10 units · 955.9 m²Builder not named
24 Apr 2024
SN0010160MH BCMS open-data feed
The development consists of the following : Non-residential facilities at the ground floor level consisting of childcare facility, a retail, and an either retail of cafe : undercroft car parks: and 23no apartments on the first floor to fourth and all associated site development works.
23 units · 3,844.7 m²Builder not named
24 Apr 2024
SN0010161MH BCMS open-data feed
Construction of a new Triplex apartment block 12, at Cherry Lane, Ashbourne, County Meath
3 units · 335.1 m²Builder not named
24 Apr 2024
SN0010162MH BCMS open-data feed
Construction of a new Triplex apartment block 10, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010163MH BCMS open-data feed
Construction of a new Triplex apartment block 11, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010164MH BCMS open-data feed
Construction of a new Triplex apartment block 2, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010165MH BCMS open-data feed
Construction of a new Triplex apartment block 3, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010175MH BCMS open-data feed
Construction of a new Triplex apartment block 4, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010178MH BCMS open-data feed
Construction of a new Triplex apartment block 5, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010205MH BCMS open-data feed
Construction of a new Triplex apartment block 9, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010208MH BCMS open-data feed
Construction of a new Triplex apartment block 7, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
SN0010219MH BCMS open-data feed
Construction of a new Triplex apartment block 8, at Cherry Lane, Ashbourne, County Meath
3 units · 353 m²Builder not named
24 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Jun 2026 · Commenced
1 notice · 1 source identity
Sligo, Sligo · Sligo County Council · Planning ref ABP-322067-25 (Sligo Co.Co Planning Ref.No. 2460186)
Construction of Phase 1 of Residential Development at Cloonamore, Oakfield Road, Sligo including 40No. dwelling houses and all ancillary site development works and services. Dwelling houses within this phase are: No.1 to No.19 The Avenue, Cloonamore (inclusive) and No.1 to No.21 The Court, Cloonamore (inclusive)
New build
19 Jun 2026 · Latest notice
5 notices · phased
Maynooth, Kildare · Kildare County Council · Planning ref 18/301230 + 22/1469
Units 1-20 Meadow View Court (Blk 4), Meadow View, Mariavilla, Maynooth, Co. Kildare.
Notice identity Works stated Scale Commenced
CN0143688KE BCMS owner-supplied export
Plant Room Building at Meadow View House (Blk 3), Meadow View, Mariavilla, Maynooth, Co. Kildare.
20.5 m²Builder named
19 Jun 2026
CN0143690KE BCMS owner-supplied export
Plant Room Building at Meadow View Court (Blk 4), Meadow View, Mariavilla, Maynooth, Co. Kildare.
20.5 m²Builder named
19 Jun 2026
CN0142821KE BCMS owner-supplied export
Units 1-20 Meadow View House (Blk 3), Meadow View, Mariavilla, Maynooth, Co. Kildare.
20 units · 1,935 m²Builder named
29 May 2026
CN0143136KE BCMS owner-supplied export
Units 1-20 Meadow View Court (Blk 4), Meadow View, Mariavilla, Maynooth, Co. Kildare.
20 units · 1,935 m²Builder named
29 May 2026
CN0137028KE BCMS owner-supplied export
Units Units 1-41 Meadow View (41 Units in total) at Mariavilla, Moyglare Road & Dunboyne Road Maynooth, Co. Kildare.
142 units · 4,680 m²Builder named
09 Jan 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Jun 2026 · Latest notice
11 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SDZ22A/0010
Construction of a three storey building Block G containing 16 units on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
Notice identity Works stated Scale Commenced
CN0143600SD BCMS owner-supplied export
Commencement of new Apartment block (known as Block K) within the Keepers Lock, Clonburris development. This 4 storey block contains 9 no. Apartments located above ground floor Commercial/Retail Units being fitted out to shell and core finish only
9 units · 1,076 m²Builder named
17 Jun 2026
CN0117386SD BCMS open-data feed
Construction 70 units on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
70 units · 7,548.7 m²Builder not named
19 Jul 2024
SN0010633SD BCMS open-data feed
Construction of a three storey building containing 8 units arranged as 4 ground level apartments and 4 two storey duplexes at 1st floor level all with own door access at Block H on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
8 units · 785.1 m²Builder not named
17 Jul 2024
CN0116971SD BCMS owner-supplied export
Construction of a three storey building Block G containing 16 units on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
143 units · 1,563 m²Builder named
10 Jul 2024
CN0116347SD BCMS owner-supplied export
Construction of a three storey building Block C containing 12 units on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
143 units · 1,179.0 m²Builder named
21 Jun 2024
CN0116349SD BCMS owner-supplied export
Construction of a three storey building Block D containing 12 units on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
143 units · 1,179.0 m²Builder named
21 Jun 2024
SN0009569SD BCMS open-data feed
Construction of a three storey building containing 8 units arranged as 4 ground level apartments and 4 two storey duplexes at 1st floor level all with own door access at Block E on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road.
8 units · 785.1 m²Builder not named
19 Dec 2023
SN0009269SD BCMS open-data feed
Construction of a three storey building containing 12 units arranged as 6 ground level apartments and 6 two storey duplexes at 1st floor level all with own door access at Block F on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road
12 units · 1,181.8 m²Builder not named
17 Oct 2023
SN0009138SD BCMS open-data feed
Construction of a three storey building containing 16 units arranged as 8 ground level apartments and 8 two storey duplexes at 1st floor level all with own door access at Block on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road
16 units · 1,563 m²Builder not named
25 Sep 2023
SN0009019SD BCMS open-data feed
Construction of a three storey building containing 16 units arranged as 8 ground level apartments and 8 two storey duplexes at 1st floor level all with own door access at Block on a site adjacent to Clondalkin/Fonthill train station and also bounded by the R113 and Ninth Lock Road
16 units · 1,563 m²Builder not named
31 Aug 2023
CN0102650SD BCMS owner-supplied export
The construction of 43 houses at Clonburris Phase 1
187 units · 4,886.3 m²Builder named
03 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Jun 2026 · Latest notice
2 notices · phased
Virginia, Cavan · Cavan County Council · Planning ref 2460650
Donnreill Builders LTD - 78 Dwelling Development and a Creche (12 Units - Nos. 112-119 & 132-135) - 5 Separate dwelling types, - reinforced concrete foundations, - Posi Joist first floor, - Concrete Cavity Block Construction, -Prefabricated Roof Trusses, -All to be constructed to the current building regs
Notice identity Works stated Scale Commenced
CN0143638CN BCMS owner-supplied export
Donnreill Builders LTD - 78 Dwelling Development and a Creche (6 Units - Nos. 126-131) - 5 Separate dwelling types, - reinforced concrete foundations, - Posi Joist first floor, - Concrete Cavity Block Construction, -Prefabricated Roof Trusses, -All to be constructed to the current building regs
6 units · 810.6 m²Builder named
16 Jun 2026
CN0141049CN BCMS owner-supplied export
Donnreill Builders LTD - 78 Dwelling Development and a Creche (12 Units - Nos. 112-119 & 132-135) - 5 Separate dwelling types, - reinforced concrete foundations, - Posi Joist first floor, - Concrete Cavity Block Construction, -Prefabricated Roof Trusses, -All to be constructed to the current building regs
78 units · 1,531.8 m²Builder named
17 Apr 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
12 Jun 2026 · Latest notice
2 notices · phased
Galway, Galway · Galway City Council · Planning ref 24/60394
Construction of new residential building Block A1 containing 30 apartments with ancillary accommodation at Garrai na Saili, Letteragh Road, Co. Galway
Notice identity Works stated Scale Commenced
CN0143371GY BCMS owner-supplied export
Construction of new residential building Block A1 containing 30 apartments with ancillary accommodation at Garrai na Saili, Letteragh Road, Co. Galway
30 units · 3,423.6 m²Builder named
12 Jun 2026
CN0137966GY BCMS owner-supplied export
Construction of 30no. dwelling units at Radharc Na Saili on the Letteragh Road, Co. Galway.
30 units · 2,318 m²Builder named
04 Feb 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Jun 2026 · Latest notice
6 notices · phased
Knockatee, Dublin · Fingal County Council · Planning ref LRD0018/S3E
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
Notice identity Works stated Scale Commenced
SN0014307FL BCMS open-data feed
Construction of Block 2, a Five Storey (Ground plus 4) residential block located of Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.
52 units · 4,411.8 m²Builder not named
10 Jun 2026
SN0014170FL BCMS open-data feed
Construction of Block 1, a Five Storey (Ground plus 4) residential block located of Holybanks Boulevard on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a Ancillary Bike storage / Plant use.
38 units · 3,435 m²Builder not named
13 May 2026
CN0141585FL BCMS owner-supplied export
Phase 2 consisting of 16 No. back-to- back Townhouses comprising of: 16 No. three bedroom three storey houses.
16 units · 1,880.5 m²Builder named
27 Apr 2026
SN0014089FL BCMS open-data feed
Construction of Block 5, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a community use which will be completed to shell and core standard.
27 units · 3,192.8 m²Builder not named
27 Apr 2026
SN0014010FL BCMS open-data feed
Construction of Block 4, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place Accessed from Glen Ellan Road, Swords, County Dublin. Block 04 will comprise of 27 no. residential apartment units. The building has a communal secure bicycle store at ground floor level. A Meter Room and Plant room are also located at ground floor level. The Retail Space and Creche will be completed to a shell finish. The Retail Space and Creche fit out will completed under a separate Commencement Notice.
27 units · 3,231.1 m²Builder not named
08 Apr 2026
CN0137143FL BCMS owner-supplied export
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
166 units · 8,427.1 m²Builder named
05 Jan 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 Jun 2026 · Latest notice
9 notices · phased
Fairview, Dublin 3., Dublin · Dublin City Council · Planning ref LRD6009/23-S3
Block A, St. Vincents Fairview Residential, 58 units.
Notice identity Works stated Scale Commenced
SN0014223DC BCMS open-data feed
The Laundry building is an existing protected structure located at St. Vincents Fairview. The proposed works under the scope of this application will constitute materials alterations consisting of the repair and renewals to the existing protected structure for hospital administration use. The building is a single storey building, which will include office space, storerooms and a training room which will be used by staff in the adjoining hospital.
217.3 m²Builder not named
08 Jun 2026
CN0141145DC BCMS owner-supplied export
Brooklawn, renovation of protected structure.
452 m²Builder named
07 May 2026
SN0014095DC BCMS open-data feed
The scope of this application relates to the proposed construction of a single storey services building, which will include a waste storage room, ESB substation, MV switch room, Traffo room, LV off loader room and generator room, at St. Vincents Hospital Fairview, Dublin 3.
150 m²Builder not named
01 May 2026
CN0140289DC BCMS owner-supplied export
Block A, St. Vincents Fairview Residential, 58 units.
811 units · 5,466 m²Builder named
09 Apr 2026
CN0140431DC BCMS owner-supplied export
Richmond House, renovation of protected structure.
617 m²Builder named
08 Apr 2026
CN0140094DC BCMS owner-supplied export
Construction of residential building Block G, 139 units.
811 units · 11,800 m²Builder named
31 Mar 2026
CN0138976DC BCMS owner-supplied export
The proposed construction of a 8 storey residential block to be known as Block B. 86 units
779 units · 6,663 m²Builder named
02 Mar 2026
CN0138990DC BCMS open-data feed
St.Vincents Hospital Fairview
69,354 m²Builder not named
02 Mar 2026
CN0136797DC BCMS open-data feed
St. Vincents Fairview Hospital & Residential - Enabling works Demolition, Clearing site, site setup, Drainage, bulk dig, piling, Tarmac to local areas, Temporary traffic arrangements and all associated site activities.
150 m²Builder not named
18 Dec 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 Jun 2026 · Latest notice
6 notices · phased
Blessington Demesne, Wicklow · Wicklow County Council · Planning ref 24/60694
Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.
Notice identity Works stated Scale Commenced
CN0143184WW BCMS owner-supplied export
Erection a Duplex Block D29 of 4 two storey timber frame duplex units over 4 ground floor traditional built apartments, with surface car parking, communal bike store and associated site works– 1 building.
8 units · 744 m²Builder named
08 Jun 2026
CN0143138WW BCMS owner-supplied export
Erection of Duplex Block D26 consisting of 4 two storey timber frame duplex units over 4 ground floor traditional built apartments, with surface car parking, detached communal bike store and associated site works– 1 building.
8 units · 744 m²Builder named
05 Jun 2026
CN0140156WW BCMS owner-supplied export
Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.
72 units · 744 m²Builder named
30 Mar 2026
CN0139102WW BCMS open-data feed
Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.
8 units · 744 m²Builder not named
20 Feb 2026
CN0139105WW BCMS owner-supplied export
Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.
72 units · 744 m²Builder named
20 Feb 2026
CN0138567WW BCMS open-data feed
Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.
185 units · 16,539.1 m²Builder not named
05 Feb 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Jun 2026 · Commenced
1 notice · 1 source identity
Limerick, Limerick · Limerick City and County Council · Planning ref 2360951
73 no. residential units at Ballygrennan, Co. Limerick
New build
03 Jun 2026 · Latest notice
6 notices · phased
Bennetstown, Dunboyne, Meath · Meath County Council · Planning ref 24/60805
Construction of a three storey duplex building (BZ03) containing 16 no. dwellings, together with ancillary bin and bike store.
Notice identity Works stated Scale Commenced
CN0142975MH BCMS owner-supplied export
Construction of a 3 & 4 storey residential block comprising of 8 no. apartments and 6 no maisonettes
14 units · 1,288 m²Builder named
03 Jun 2026
CN0138518MH BCMS owner-supplied export
Construction of a three storey duplex building (BZ03) containing 16 no. dwellings, together with ancillary bin and bike store.
140 units · 1,494 m²Builder named
23 Feb 2026
CN0138519MH BCMS owner-supplied export
Construction of a 3 and 4 storey residential block (BA04) comprising of 8 no. apartments and 6 no. maisonettes.
140 units · 1,288 m²Builder named
23 Feb 2026
CN0137935MH BCMS owner-supplied export
Construction of 1 no. ESB substation which includes a switch room together with site associated works located at Bennetstown, Dunboyne, Co. Meath
21 m²Builder named
03 Feb 2026
CN0137182MH BCMS owner-supplied export
Construction of a 3 and 4 storey residential block (BA05) comprising of comprising of 10 no. apartments and 8 no. maisonettes.
140 units · 1,658 m²Builder named
02 Jan 2026
CN0137193MH BCMS open-data feed
Construction of 169 dwellings ranging from 2-3 storey, to gether with associated site works.
169 units · 15,206.4 m²Builder not named
02 Jan 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
01 Jun 2026 · Latest notice
2 notices · phased
Athlone, Westmeath · Westmeath County Council · Planning ref 2360141
The construction of 30 no. dwellings, including 1 no. four- bedroom two-storey detached dwelling, 14 no. four-bedroom two-storey semi- detached dwellings, 12 no. three- bedroom terraced dwellings, 3 no. two- bedroom terraced dwellings. Upgrading section of existing public sewer beneath public road west of the site, and new connection to said infrastructure. All associated site development works including new site entrance from public road, internal roads, paths, paving, parking, bin stores, drainage, amenity space, landscaped public open space, street lighting, boundary treatments, water services, a foul sewer pump station, storm drainage, underground stormwater attenuation tank with attenuated outflow to existing open drain, ESB substation and all associated site works to complete the development.
Notice identity Works stated Scale Commenced
CN0142876WH BCMS owner-supplied export
The construction of 4 no. three bedroom terraced dwellings and all associated site works to complete the development at Hillquarter, Coosan, Athlone, Co.Westmeath.
4 units · 443.6 m²Builder named
01 Jun 2026
CN0137500WH BCMS owner-supplied export
The construction of 30 no. dwellings, including 1 no. four- bedroom two-storey detached dwelling, 14 no. four-bedroom two-storey semi- detached dwellings, 12 no. three- bedroom terraced dwellings, 3 no. two- bedroom terraced dwellings. Upgrading section of existing public sewer beneath public road west of the site, and new connection to said infrastructure. All associated site development works including new site entrance from public road, internal roads, paths, paving, parking, bin stores, drainage, amenity space, landscaped public open space, street lighting, boundary treatments, water services, a foul sewer pump station, storm drainage, underground stormwater attenuation tank with attenuated outflow to existing open drain, ESB substation and all associated site works to complete the development.
30 units · 5,727.8 m²Builder named
19 Jan 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2026 · Latest notice
4 notices · phased
Dublin, Dublin · Fingal County Council · Planning ref LRD0051/S3E
Construction of 74 dwelling houses and associated site works, 18-61 incl. Bridgemount road, 1-20 incl. Bridgemount ave., 1-10 incl. Bridgemount drive, phoenix park racecourse, castleknock, D15.
Notice identity Works stated Scale Commenced
CN0142920FL BCMS owner-supplied export
Construction of 74 dwelling houses and associated site works, 18-61 incl. Bridgemount road, 1-20 incl. Bridgemount ave., 1-10 incl. Bridgemount drive, phoenix park racecourse, castleknock, D15.
74 units · 11,253 m²Builder named
29 May 2026
SN0014245FL BCMS open-data feed
Construction of 32 new apartment units and associated site works, Plot 8 Apartment Block 2 at Phoenix Park Racecourse, Castleknock, Dublin 15.
32 units · 3,530 m²Builder not named
29 May 2026
SN0014246FL BCMS open-data feed
Construction of creche building and associated site works, creche building, plot 8, Phoenix Park Racecourse, castleknock, Dublin 15, fingal.
660 m²Builder not named
29 May 2026
SN0014247FL BCMS open-data feed
Construction of 40 new apartment units and associated site works, Plot 8 Apartment Block 1 at Phoenix Park Racecourse, Castleknock, Dublin 15.
40 units · 4,220 m²Builder not named
29 May 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2026 · Latest notice
3 notices · phased
Rathangan, Kildare · Kildare County Council · Planning ref 2360229
Construction of 24no. dwellings forming phase 2B of 3 to include house numbers 79-86 (Units 33-40) 91-106 (Units 45-60)
Notice identity Works stated Scale Commenced
CN0142929KE BCMS owner-supplied export
Construction of 24no. dwellings forming phase 2B of 3 to include house numbers 79-86 (Units 33-40) 91-106 (Units 45-60)
24 units · 3,042.2 m²Builder named
29 May 2026
CN0138917KE BCMS owner-supplied export
Construction of 6no. dwellings forming phase 2A of 3 to include house numbers 107-112 (Units 62-66)
6 units · 760.8 m²Builder named
26 Feb 2026
CN0136982KE BCMS owner-supplied export
Construction of 35no. dwellings and creche forming phase 1 of 3 to include house numbers 47-78 (Units 1-32) and 113-115 (Units 67-69)
35 units · 4,247.4 m²Builder named
19 Dec 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2026 · Latest notice
9 notices · phased
Midleton, Cork · Cork County Council · Planning ref 22/06627
Construction of 15 no. new dwelling houses and associated site works, nos. 3 to 17 incl. Hazel way, Ard griffin, knockgriffin, midleton, co. cork
Notice identity Works stated Scale Commenced
CN0142756CC BCMS owner-supplied export
Construction of 2 new dwelling houses and associated site works, 9 & 10 Park Way, ard griffin, water rock road, midleton co. cork
2 units · 199.8 m²Builder named
29 May 2026
CN0142342CC BCMS owner-supplied export
Construction of 7 no. new dwellings and associated site works, nos. 1 to 7 incl. Park way, new water rock road, midleton, co.cork.
7 units · 762.9 m²Builder named
21 May 2026
CN0138546CC BCMS owner-supplied export
Construction of 15 no. new dwelling houses and associated site works, nos. 3 to 17 incl. Hazel way, Ard griffin, knockgriffin, midleton, co. cork
131 units · 1,436.7 m²Builder named
19 Feb 2026
CN0136768CC BCMS owner-supplied export
Construction of 8 no. new units in 2 no. buildings, and associated site works, nos. 19-22 & 23-26 (all inclusive), Owenacurra Drive, ardgriffin, knockgriffin, midleton.
131 units · 352.8 m²Builder named
05 Jan 2026
CN0135926CC BCMS owner-supplied export
Construction 8 no. new dwellings and associated site works, nos. 1 to 8 incl., owenacurra drive, water rock, midleton, co. cork.
131 units · 352.8 m²Builder named
01 Dec 2025
CN0134344CC BCMS open-data feed
Consturction of 8 no. new maisoonette dwellings, nos. 6-9 incl.The Green & 1–4 incl. Park View South, new water rock road ardgriffin midleton.
8 units · 352.8 m²Builder not named
10 Oct 2025
CN0133930CC BCMS owner-supplied export
Construction of 8 no. residential units and all associated site works at 16 to 23 incl. the Square, Ard Griffin, Knockgriffin, Midleton, Co. Cork
131 units · 358.2 m²Builder named
02 Oct 2025
CN0120002CC BCMS open-data feed
Construction of 86 no. new dwelling houses, nos. 1-15 Griffin Drive East, 1-13 Alder Way, 1-8, 10-13 & 24-29 The Square, 1-5 Moores Road, 1-5 & 10-15 The Green, 5-11 Park View South, 9-18 Owenacurra Drive, 1-2 Hazel Way, 1-5 River View, all inclusive, ardgriffin, knockgriffin, midleton, co. cork.
86 units · 9,609.9 m²Builder not named
30 Sep 2024
CN0120166CC BCMS owner-supplied export
Construction of 8 no. new dwelling houses and associated site works, 27-34 inclusive Owenacurra Drive, Ard Griffin, knockgriffin, Midleton, County Cork
131 units · 727.2 m²Builder named
30 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2026 · Latest notice
19 notices · phased
Limerick, Limerick · Limerick City and County Council · Planning ref ABP-311588-21
Phase 2A Block A consisting of a 5 storey apartment block with 47no apartments (15no 1bed, 32no 2 bed)and 2 no amenity areas
Notice identity Works stated Scale Commenced
SN0014235LL BCMS open-data feed
Phase 5A development. BT9 block 74 will consist of a 3 storey duplex with 6 apartments on the ground floor and 6 duplexes above.
12 units · 1,001 m²Builder not named
29 May 2026
CN0130984LL BCMS owner-supplied export
Phase 2B Block B consisting of a 4 storey apartment block with 39no apartments (12 no 1bed, 27no 2 bed)
86 units · 3,701.3 m²Builder named
14 Jul 2025
CN0130987LL BCMS owner-supplied export
Phase 2A Block A consisting of a 5 storey apartment block with 47no apartments (15no 1bed, 32no 2 bed)and 2 no amenity areas
86 units · 4,635 m²Builder named
14 Jul 2025
SN0012391LL BCMS open-data feed
Phase 3A development. BT14 Block (25 0 34) will consist of a 3 storey duplex with 5 apartments on ground floor and 5 duplexes above.
10 units · 833 m²Builder not named
24 Apr 2025
SN0011484LL BCMS open-data feed
Construction of a creche building as part of a larger residential development.
524 m²Builder not named
11 Nov 2024
SN0011041LL BCMS open-data feed
Phase 3B Development. BT9 Block 42 (units 35-46) will consist of 3 storey block with 6 apartments on ground floor and 6 duplexes above.
12 units · 1,001 m²Builder not named
26 Sep 2024
CN0114579LL BCMS owner-supplied export
Phase 1D.1 Development. BT4 Block 40 will consist of 3 storey duplex with 2 apartments on ground floor and 2 duplexes above.
4 units · 196 m²Builder named
22 Apr 2024
CN0114581LL BCMS owner-supplied export
Phase 1C.1 Development. BT4 Block 27 will consist of 3 storey duplex with 2 apartments on ground floor and 2 duplexes above.
4 units · 196 m²Builder named
22 Apr 2024
CN0112998LL BCMS owner-supplied export
Phase 1B.1 Development. BT4 Block 12 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.
4 units · 196 m²Builder named
17 Apr 2024
CN0113018LL BCMS open-data feed
Phase 1B.2 development consists of 26 no. 3 bed (16 semi-detached and 6 end of Terrace) and 4 no. 2 bed mid terrace houses.
26 units · 2,670 m²Builder not named
17 Apr 2024
CN0112264LL BCMS open-data feed
Phase 1D.2 development consists of 14no. 3bed (8 semi detached and 6 end of terrace) and 9no. 2 bed mid terrace houses.
23 units · 2,280 m²Builder not named
08 Apr 2024
CN0110599LL BCMS open-data feed
Phase 1C.2 development consists of 16no. 3bed (12 semi detached and 4 end of terrace) and 6no. 2 bed mid terrace houses.
22 units · 2,220 m²Builder not named
07 Mar 2024
CN0108542LL BCMS open-data feed
Phase 1A.7 Development consists of 5 terraced houses and 4 no. 3bed semi-detached houses. Terraced houses comprise 3 no. 2bed mid terrace and 2 no. 3bed houses end of terrace.
9 units · 6,375.6 m²Builder not named
02 Jan 2024
CN0108544LL BCMS owner-supplied export
Phase 1A.6 Development. BT4 Block 8 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.
4 units · 196 m²Builder named
02 Jan 2024
CN0106348LL BCMS open-data feed
Phase 1A.4 Development. BT4 Block 7 will consist of 2 apartments on ground floor and 2 duplex units above.
4 units · 402 m²Builder not named
17 Oct 2023
CN0106349LL BCMS owner-supplied export
Development consists of 5 terraced houses and 4 no. 3 bed semi- detached houses. Terraced houses comprise 3 no. 2 bed mid terrace and 2 no. 3 bed houses end of terrace.
9 units · 870 m²Builder named
17 Oct 2023
CN0103812LL BCMS owner-supplied export
Phase 1A Development. BT4 Block 3 will consist of a 3 storey duplex with apartments on the ground floor and duplexes above.
4 units · 402 m²Builder named
31 Jul 2023
CN0103814LL BCMS owner-supplied export
Phase 1A Development. BT4 Block 1 will consist of a 3 storey duplex with apartments on the ground floor and duplexes above.
4 units · 402 m²Builder named
31 Jul 2023
CN0103865LL BCMS owner-supplied export
The application relates to 4 no. Terrace Houses. Each unit is provided with its own independent entrance located at ground level.
4 units · 1,992 m²Builder named
31 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
28 May 2026 · Latest notice
6 notices · phased
Lucan, Dublin · South Dublin County Council · Planning ref SDZ24A/0029W
Construction of 132 Housing units, and associated ancillary works, located at Seven Mills, Tile 7 & 8
Notice identity Works stated Scale Commenced
CN0142822SD BCMS owner-supplied export
Construction of 132 Housing units, and associated ancillary works, located at Seven Mills, Tile 7 & 8
132 units · 747,950.9 m²Builder named
28 May 2026
SN0013966SD BCMS open-data feed
Construction of a part 6 storey apartment block consisting of 50 no. apts, at Wicker Mills (Block #5), Seven Mills, Clonburris.
50 units · 4,330 m²Builder not named
02 Apr 2026
CN0139554SD BCMS owner-supplied export
Construction of 6 no. Duplex blocks, consisting of 68 no. units, and associated ancillary works, located at Seven Mills, Tile 7 & 8.
68 units · 1,985.0 m²Builder named
18 Mar 2026
SN0013854SD BCMS open-data feed
Construction of 6 storey apt block, consisting of 69 no. apts at Wicker Hall (Block 6), Seven Mills, Clonburris, Dublin 22.
69 units · 5,934 m²Builder not named
10 Mar 2026
SN0013492SD BCMS open-data feed
Construction of 6 storey apt block consisting of 68 no apts at Wicker Gate (Block 7), Seven Mills, Clonburris, Dublin 22.
68 units · 5,934 m²Builder not named
18 Dec 2025
CN0135405SD BCMS owner-supplied export
Construction of 132 Housing units, and associated ancillary works, located at Seven Mills, Tile 7 & 8.
132 units · 15,114.0 m²Builder named
06 Nov 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 May 2026 · Latest notice
11 notices · phased
The Furrows, Ratoath, Meath · Meath County Council · Planning ref 2460487-ABP321753-25
Construction of 34 No. Two & Three storey residential dwellings together with associate site works at 1-14 The Terrace & 9-28 The Drive.
Notice identity Works stated Scale Commenced
CN0142667MH BCMS owner-supplied export
Construction of 2 No. domestic sheds together with associate site works at 1 & 2 The Mews.
47.4 m²Builder named
27 May 2026
CN0140385MH BCMS owner-supplied export
Construction of 2 No. three storey residential dwellings together with associate site works at 1 & 2 The Mews.
24 units · 581.0 m²Builder named
06 Apr 2026
CN0137680MH BCMS open-data feed
Construction of a new two storey residential block (BZ02) comprising of 4 No. Apartments at 16-19 The Square, The Furrows, Rathoath, Co. Meath.
4 units · 254.2 m²Builder not named
29 Jan 2026
CN0137683MH BCMS owner-supplied export
Construction of a new two storey residential block (BZ01) comprising of 4 No. Apartments at 20-23 The Square, The Furrows, Rathoath, Co. Meath.
24 units · 254.2 m²Builder named
29 Jan 2026
CN0137797MH BCMS owner-supplied export
Construction of a new two storey residential block (BZ03) comprising of 4 No. Apartments at 12-15 The Square, The Furrows, Rathoath, Co. Meath.
24 units · 254.2 m²Builder named
29 Jan 2026
CN0137311MH BCMS owner-supplied export
Construction of 46 No. two storey residential dwellings together with associate site works at 1-11 & 24-50 The Square & 1-8 The Drive.
46 units · 3,972.7 m²Builder named
20 Jan 2026
CN0137315MH BCMS owner-supplied export
Construction of 34 No. Two & Three storey residential dwellings together with associate site works at 1-14 The Terrace & 9-28 The Drive.
34 units · 3,230.6 m²Builder named
20 Jan 2026
CN0136616MH BCMS owner-supplied export
Construction of No. 18 two storey residential dwellings together with associate site works at 1-9 The Place & 15-23 The Terrace.
24 units · 1,455.8 m²Builder named
16 Dec 2025
CN0135648MH BCMS owner-supplied export
Construction of No. 6 single storey residential dwellings together with associate site works at 10-15 The Place.
24 units · 1,287.2 m²Builder named
18 Nov 2025
CN0135286MH BCMS owner-supplied export
Construction of a new Creche (shell and core works only) and associate site works.
258.8 m²Builder named
05 Nov 2025
CN0135307MH BCMS owner-supplied export
Construction of a three storey residential block (BZ04) comprising 6 No. Duplexes and 6 No. Apartments.
24 units · 1,036.3 m²Builder named
05 Nov 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 May 2026 · Latest notice
2 notices · phased
Lucan, Dublin · South Dublin County Council · Planning ref SDZ21A/0023
Construction of 29no. 2-storey dwellings and 1no. 3-storey dwelling in the Tubber Lane Development Area, Adamstown SDZ, Lucan, Co. Dublin
Notice identity Works stated Scale Commenced
CN0142693SD BCMS owner-supplied export
Construction of 29no. 2-storey dwellings and 1no. 3-storey dwelling in the Tubber Lane Development Area, Adamstown SDZ, Lucan, Co. Dublin
30 units · 3,279.2 m²Builder named
27 May 2026
CN0142366SD BCMS owner-supplied export
Construction of 16no. 2-storey dwellings in the Tubber Lane Development Area, Adamstown SDZ, Lucan, Co. Dublin
16 units · 1,493 m²Builder named
20 May 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
26 May 2026 · Latest notice
7 notices · phased
Goatstown, Dublin · Dun Laoghaire Rathdown County Council · Planning ref LRD24A/0882/WEB
Proposed construction of Block F apartment block over basement car parking
Notice identity Works stated Scale Commenced
CN0142467DR BCMS owner-supplied export
Material change of use from private residential to Lower ground floor Creche Unit / Ground Floor Ancillary accommodation at Cedarmount house and 2 no apartment units to first floor, works include refurbishment of all areas of existing house and extension @ Cedarmount House, Mount Anville Road, Goatstown Dublin 14
2 units · 712.3 m²Builder named
26 May 2026
CN0142455DR BCMS owner-supplied export
Construction of New Cedarmount Gate House (2 storey 3 bed New build) - New Extension and refurbishment of existing Cedarmount Coach House (2 storey 2 bed unit) - New extension and refurbishment of existing Cedarmount gate Lodge (single storey 3 bed unit - RPS Ref: 796) all at Cedarmount House Knockrabo, Mount Anville Road, Goatstown, Dublin 14
3 units · 343 m²Builder named
22 May 2026
SN0013613DR BCMS open-data feed
Proposed Construction of Block G
20 units · 2,015 m²Builder not named
23 Jan 2026
SN0013621DR BCMS open-data feed
Proposed construction of Block F apartment block over basement car parking
84 units · 10,215 m²Builder not named
23 Jan 2026
SN0013494DR BCMS open-data feed
Proposed construction of a 3 storey duplex block.
16 units · 1,565 m²Builder not named
19 Dec 2025
SN0013496DR BCMS open-data feed
Proposed construction of a 4 storey duplex block
16 units · 2,089 m²Builder not named
19 Dec 2025
CN0136169DR BCMS open-data feed
Comprising 9 No. houses between 2 and 3 storeys in height
9 units · 1,247 m²Builder not named
01 Dec 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 May 2026 · Latest notice
3 notices · phased
Galway, Galway · Galway City Council · Planning ref ABP-310797-21
67 New Houses and associated infrastructure and siteworks.
Notice identity Works stated Scale Commenced
SN0014233GY BCMS open-data feed
Ph 03 Proposed construction of a two storey Creche at Rosshill Manor, Rosshill Rd, Galway
399 m²Builder not named
25 May 2026
SN0011710GY BCMS open-data feed
Ph 02 Rosshill Manor Apartments and associated infrastructure and siteworks.
35 units · 3,544.5 m²Builder not named
16 Dec 2024
CN0123239GY BCMS owner-supplied export
67 New Houses and associated infrastructure and siteworks.
67 units · 520,992 m²Builder named
10 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 May 2026 · Latest notice
2 notices · phased
Cork, Cork · Cork City Council · Planning ref 24/43414, ABP-322434-25
Construction of 101 new dwellings and associated site works, nos. 1 to 101 incl. esker green, dunkettle, glanmire, cork, co. cork.
Notice identity Works stated Scale Commenced
CN0142462CY BCMS owner-supplied export
Construction of 101 new dwellings and associated site works, nos. 1 to 101 incl. esker green, dunkettle, glanmire, cork, co. cork.
101 units · 6,991.4 m²Builder named
22 May 2026
CN0140549CY BCMS open-data feed
Construction 11 no. new dwelling houses and associated site works, nos. 1-3, 8-13, 18-19 (all inclusive) the granary, at lands to the north of Dunkettle House,(Protected Structure - PS1190) and associated, structures (protected structures - PS1238, PS1239, Dunkettle (townland), Glanmire, Cork, glanmire, Cork.
11 units · 727.4 m²Builder not named
13 Apr 2026
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 May 2026 · Latest notice
3 notices · phased
Limerick, Limerick · Limerick City and County Council · Planning ref 21520
development comprises the construction of 20 No. residential houses together with a new site entrance with roads and path, new boundary treatments, site lighting, landscaping and open space, connections to existing services and all associated site works.
Notice identity Works stated Scale Commenced
CN0142408LL BCMS owner-supplied export
02 No. Blocks comprising of 03 No. apartments in each block and all associated site works
6 units · 882 m²Builder named
20 May 2026
CN0141147LL BCMS owner-supplied export
Construction of 20 new 2 and 3 storey residential houses and associated site works.
20 units · 1,653.9 m²Builder named
06 Apr 2026
CN0117032LL BCMS owner-supplied export
development comprises the construction of 20 No. residential houses together with a new site entrance with roads and path, new boundary treatments, site lighting, landscaping and open space, connections to existing services and all associated site works.
20 units · 40,800 m²Builder named
17 Jul 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.