Commencement notice group
Commencement notices — Muine Bheag
Muine Bheag, Carlow
1 unique commencement event · latest notified commencement 07 Oct 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 07 Oct 2026
- Latest notice
- 31,008 m²
- Planning references supplied
- 22/282
- Public location
- Muine Bheag, Carlow
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Muine Bheag, Carlow
- County
- Carlow
Notice location variants
- roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097 CN0148244CW
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay vis
Floor area stated for this source: 31,008 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.