Site start

Site start — Muine Bheag

Muine Bheag, Carlow

1 commencement notice · start date 07 Oct 2026 · planning reference given

Planning 22/282 · Council file · external

Commencement notices
1
Latest start date
07 Oct 2026
Latest notice
31,008 m²
Planning reference
22/282
Location
Royal Oak Road, Muine Bheag, Carlow

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Muine Bheag, Carlow
County
Carlow

Addresses on the notices

  • Royal Oak Road, Muine Bheag, Carlow
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Carlow County Council planning record Application details, status and decision record for 22/282. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay vis

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 31,008 m².

Planning reference 22/282

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.