Site start

Housing site start — Tullow

Tullow, Carlow

1 commencement notice · start date 13 Apr 2026 · planning reference given

Planning 2560098 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
13 Apr 2026
Latest notice
Scale not stated
Planning reference
2560098
Location
Tullow, Carlow

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Tullow, Carlow
County
Carlow

Addresses on the notices

  • ground and first- floor level, to accommodate 2 no
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Carlow County Council planning record Application details, status and decision record for 2560098. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consist of alterations to the existing two-storey, four-bedroom dwelling, including; (a) the demolition of a single storey rear extension; (b) the subdivision of the existing dwelling at ground and first- floor level, to accommodate 2 no. townhouses including; (i) construction of a new two-storey rear extension; (ii) the raising of the existing roof by 0.55m; (iii) internal alterations; (iv) rooflights, and (v) alterations to all elevations. Other works as part of the development include SuDS drainage, landscaping, boundary treatment, and all associated works to facilitate the development.

Work stated for this notice Scale not stated for this notice.
Planning reference 2560098 Developer stated: JJ Keogh Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.