25 Oct 2022 · Latest notice
2 unique events
Galway, Galway · Galway City Council · Planning ref 21/233
Residential development for 4 houses consisting of 2 blocks .
Reconciled event scale
4 units · 1,250 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Ian Morrissey Renovations Ltd
Unique event Works stated Scale Commenced
CN0094954GY BCMS owner-supplied export
Residential development for 4 houses consisting of 2 blocks .
4 units · 1,250 m²Builder named
25 Oct 2022
CN0094951GY BCMS owner-supplied export
Residential development for 2 houses in one block
2 units · 334 m²Builder named
25 Oct 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
12 Aug 2022 · Latest notice
3 unique events
gorey, Wexford · Wexford County Council · Planning ref 20181795
construction of a block of 4no. semi- detached industrial units, provision of on site parking, connection to existing services and all ancillary works
Unique event Works stated Scale Commenced
SN0007674WX BCMS open-data feed
PROPOSED INDUSTRIAL UNIT BUILDING 3
659 m²Builder not named
12 Aug 2022
CN0073179WX BCMS owner-supplied export
construction of a block of 4no. semi- detached industrial units, provision of on site parking, connection to existing services and all ancillary works
4 units · 1,352 m²Builder named
08 Mar 2021
CN0055481WX BCMS owner-supplied export
Construction of a block of 4 no. semidetached industrial units, provision of on site parking, connection to existing services and all ancillary works.
4 units · 1,623 m²Builder named
12 Aug 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration Change of use
23 Mar 2022 · Latest notice
3 unique events
Athlone, Westmeath · Westmeath County Council · Planning ref 21/265
RW Unit 4 Arcadia Retail Park: (i) The Change of Use of Unit 5A (Floor Area 843sq.m) from Children’s Entertainment to Retail Warehouse use; (ii) Removal of 1 No. internal party wall and re- alignment of 1 No. party wall to provide 2 No. units to be known as Unit 4 (Ground Floor Area = 1938sq.m) and Unit 5 (Ground Floor Area = 916sq.m); (iii) Construction of mezzanine floors to Unit 4 (Proposed Mezzanine Floor Area = 381sq.m for storage, office and welfare use) and to Unit 5 (Proposed Mezzanine Floor Area = 439sq.m for Retail Warehouse use); (iv) Modifications to west-facing elevation to provide 2 No. new entrance canopies, relocation of 1 No. entrance door, omission of 1 No. entrance door, provision of new signage, modifications to existing canopy and omission of some glazing; (v) Provision of new and replacement signage to east, north and south facing elevations
Unique event Works stated Scale Commenced
CN0087381WH BCMS open-data feed
Construction of new mezzanine floor, escape & circulation staircases, provide stock room & staff areas, all ancillary works and site works at Unit 5 Arcadia Athlone Retail Park, Athlone, Co. Westmeath. The areas covered by Section B4 & B5 of Part B of the TGD are to remain unaltered and are constructed as per the previous Fire Safety Certificate.
798 m²Builder not named
23 Mar 2022
CN0083635WH BCMS open-data feed
RW Unit 5, Arcadia Retail Park: (i) The Change of Use of Unit 5A (Floor Area 843sq.m) from Children’s Entertainment to Retail Warehouse use; (ii) Removal of 1 No. internal party wall and re-alignment of 1 No. party wall to provide 2 No. units to be known as Unit 4 (Ground Floor Area = 1938sq.m) and Unit 5 (Ground Floor Area = 916sq.m); (iii) Construction of mezzanine floors to Unit 4 (Proposed Mezzanine Floor Area = 381sq.m for storage, office and welfare use) and to Unit 5 (Proposed Mezzanine Floor Area = 439sq.m for Retail Warehouse use); (iv) Modifications to west-facing elevation to provide 2 No. new entrance canopies, relocation of 1 No. entrance door, omission of 1 No. entrance door, provision of new signage, modifications to existing canopy and omission of some glazing; (v) Provision of new and replacement signage to east, north and south facing elevations; (vi)New personnel emergency exit doors
2,854 m²Builder not named
24 Nov 2021
CN0083630WH BCMS owner-supplied export
RW Unit 4 Arcadia Retail Park: (i) The Change of Use of Unit 5A (Floor Area 843sq.m) from Children’s Entertainment to Retail Warehouse use; (ii) Removal of 1 No. internal party wall and re- alignment of 1 No. party wall to provide 2 No. units to be known as Unit 4 (Ground Floor Area = 1938sq.m) and Unit 5 (Ground Floor Area = 916sq.m); (iii) Construction of mezzanine floors to Unit 4 (Proposed Mezzanine Floor Area = 381sq.m for storage, office and welfare use) and to Unit 5 (Proposed Mezzanine Floor Area = 439sq.m for Retail Warehouse use); (iv) Modifications to west-facing elevation to provide 2 No. new entrance canopies, relocation of 1 No. entrance door, omission of 1 No. entrance door, provision of new signage, modifications to existing canopy and omission of some glazing; (v) Provision of new and replacement signage to east, north and south facing elevations
2 units · 4,517 m²Builder named
24 Nov 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Feb 2022 · Latest notice
2 unique events
Crossabeg, Wexford · Wexford County Council · Planning ref 20180475
Development of ten detached houses and all associated site works
Reconciled event scale
3 units · 26,500 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0086532WX BCMS open-data feed
Houses 2, 9 & 10
3 units · 2,340 m²Builder not named
20 Feb 2022
CN0076915WX BCMS owner-supplied export
Development of ten detached houses and all associated site works
2 units · 26,500 m²Builder not named
22 May 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
02 Feb 2022 · Latest notice
2 unique events
Blanchardstown, Dublin · Fingal County Council · Planning ref FW20A/0162
Construction of a terrace of 3 No two and half storey 2 bed houses
Unique event Works stated Scale Commenced
CN0085566FL BCMS owner-supplied export
Single and 2 storey extension and dormer window to rear
1 unit · 36.7 m²Builder named
02 Feb 2022
CN0084001FL BCMS owner-supplied export
Construction of a terrace of 3 No two and half storey 2 bed houses
3 units · 1,095 m²Builder named
29 Nov 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
19 Oct 2021 · Commenced
1 unique event
Cork, Cork · Cork City Council
Construction of 5 storey Apartment Block B at Thomas Davis Street / Spring Lane, Blackpool, Cork City for Clúid Housing Association.
New build
26 May 2021 · Latest notice
2 unique events
Castlepollard, Westmeath · Westmeath County Council · Planning ref 196224
Construction of 4 No. 3 bed two storey semi detached dwellings and 6 No.. 3 bed two storey townhouse dwellings, all associated carparking, access roadways and connection onto public road, connections to the existing public drainage infrastructure, all private and public open spaces and all ancillary site services at lands to the rear of Kingscourt, Castlepollard, Co. Westmeath
Reconciled event scale
10 units · 1,160 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0076446WH BCMS owner-supplied export
Construction of 4 No. 3 bed two storey semi detached dwellings and 6 No.. 3 bed two storey townhouse dwellings, all associated carparking, access roadways and connection onto public road, connections to the existing public drainage infrastructure, all private and public open spaces and all ancillary site services at lands to the rear of Kingscourt, Castlepollard, Co. Westmeath
10 units · 1,160 m²Builder not named
26 May 2021
CN0063559WH BCMS open-data feed
Construction of 4 No. 3 bed two storey semi detached dwellings and 6 No.. 3 bed two storey townhouse dwellings, all associated carparking, access roadways and connection onto public road, connections to the existing public drainage infrastructure, all private and public open spaces and all ancillary site services.
10 units · 1,160 m²Builder not named
08 Apr 2020
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 May 2021 · Latest notice
2 unique events
Waterford, Waterford · Waterford City and County Council · Planning ref 17/877
Residential development of 4nr houses on serviced sites.
Reconciled event scale
19 units · 4,813.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
McCarthy Civil Contractors Lrd
Unique event Works stated Scale Commenced
CN0076108WD BCMS open-data feed
Residential Development consisting of 19 No. Houses (9 No. Type A & 10 No. Type B)
19 units · 4,813.4 m²Builder not named
21 May 2021
CN0066770WD BCMS owner-supplied export
Residential development of 4nr houses on serviced sites.
4 units · 1,029.4 m²Builder named
04 Aug 2020
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
23 Apr 2021 · Latest notice
2 unique events
Dunmanway, Cork · Cork County Council · Planning ref 18/00001
Residential Development for 12 dwellings (House No.'s 24-35) and all associated site works at The Meadows, Tonafora, Dunmanway, Co. Cork, for Keldview Ltd. Planning Ref: 18/00001.
Reconciled event scale
12 units · 1,226.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0074340CC BCMS open-data feed
Residential Development for 12 dwellings (House No.'s 24-35) and all associated site works at The Meadows, Tonafora, Dunmanway, Co. Cork, for Keldview Ltd. Planning Ref: 18/00001.
12 units · 1,226.4 m²Builder not named
23 Apr 2021
CN0048180CC BCMS owner-supplied export
Residential Development for 12 dwellings (House No.'s 24-35) and all associated site works at The Meadows, Tonafora, Dunmanway, Co. Cork, for Keldview Ltd. Planning Ref: 18/00001.
12 units · 1,226.4 m²Builder not named
11 Feb 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
27 Oct 2020 · Latest notice
2 unique events
Cork, Cork · Cork City Council · Planning ref 1335739
Construction of 3no dwellings
Unique event Works stated Scale Commenced
CN0069867CY BCMS owner-supplied export
Construction of 3 No. town-houses and associated site works at 9 & 10 Corkeran's Quay, Blackpool, Cork
3 units · 352 m²Builder named
27 Oct 2020
CN0049246CY BCMS owner-supplied export
Construction of 3no dwellings
3 units · 1,056 m²Builder named
20 Mar 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration
10 Jul 2019 · Commenced
1 unique event
Limerick, Limerick · Limerick City and County Council
1. Reinforcement of concrete floors and beams with Carbon Fiber Strips to ensure compliance with Part A. 2. Repair/Replace any rotten or burnt timbers on the facades.
Material alteration
20 Dec 2018 · Latest notice
2 unique events
Tullamore, Offaly · Offaly County Council · Planning ref 18242
Works to construct new floors in 2 no. existing industrial units - 25E & 26E, Axis Business park, Tullamore, Co. Offaly
Reconciled event scale
2 units · 1,031 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0048075OY BCMS owner-supplied export
Change of use of Industrial / Warehouse Units to Training facility including Electrical Apprentice Training Area, Clean Room with Classrooms, Laboratory with Classroom and associated Offices, Canteen, Reception area and all Ancillary Works
1,031 m²Builder named
20 Dec 2018
CN0045746OY BCMS owner-supplied export
Works to construct new floors in 2 no. existing industrial units - 25E & 26E, Axis Business park, Tullamore, Co. Offaly
2 units · 1,031 m²Builder named
09 Nov 2018
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
24 Jun 2026 · Commenced
1 unique event
Cobh, Cork · Cork County Council · Planning ref 22/5488
The construction of a residential development consisting of 23 no. dwelling houses and all ancillary site works - Phase 1. The proposed development comprises of 6 no. terraced 2 bedroom dwelling houses, 14 no. terraced 3 bedroom dwelling houses, 1 no detached 3 bedroom dwelling house, 2 no. detached 4 bedroom dwelling houses, and ancillary site works include landscaping, surface car parking and site services
Reconciled event scale
23 units · 2,201 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
15 Jun 2026 · Commenced
1 unique event
Dunboyne, Meath · Meath County Council · Planning ref ABP-321999-25, 2460468
Construction of 26 apartments within Block M (1-26 Castle Farm Court)
Reconciled event scale
26 units · 2,159 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
10 Jun 2026 · Latest notice
2 unique events
Belview Port, Kilkenny · Kilkenny County Council · Planning ref 2460103
Phase 1 Site Enabling, Earthworks, Site Investigation (Sept- Dec 2025), no building works. Phase 2 Proposed Plasterboard Production facility, Storage Buildings, Office and Welfare facilities, drainage and associated Site Works (Jan-Dec 2026).
Unique event Works stated Scale Commenced
CN0143829KK BCMS open-data feed
Proposed Plasterboard Manufacturing Plant and associated site works at Gorteens, Belview, Co. Kilkenny.
28,498 m²Builder not named
10 Jun 2026
CN0133375KK BCMS owner-supplied export
Phase 1 Site Enabling, Earthworks, Site Investigation (Sept- Dec 2025), no building works. Phase 2 Proposed Plasterboard Production facility, Storage Buildings, Office and Welfare facilities, drainage and associated Site Works (Jan-Dec 2026).
22,400 m²Builder named
17 Sep 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
27 May 2026 · Commenced
1 unique event
Dublin 8, Dublin · Dublin City Council · Planning ref 3826/22
Construction of a residential building comprising : A part 3, part 4 storey apartment block of 25 no. units (4 no. studio units, 8 no. 1 bed units, and 13 no. 2 bed units) over a partial basement level with ground floor terraces and upper floor balconies on the eastern, southern and western elevations.
Reconciled event scale
25 units · 2,248 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
New build
26 May 2026 · Commenced
1 unique event
Sallins, Kildare · Kildare County Council · Planning ref 22/110
Apartment Block C at Cuan An Mhuillin (Mill Harbour) Old Odlums Mill Site, Sallins, Co. Kildare for Springwood Limited
Reconciled event scale
24 units · 2,588 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
20 May 2026 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref ABP-306325-20, 2543863
Construction of addresses 29-39 Rathard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Rathard), and associated site works.
New build
19 May 2026 · Latest notice
2 unique events
Ballycoolin, Dublin 15, Dublin · Fingal County Council · Planning ref FW22A/0156
Unit 3 Mooretown Logistics Park, Ballycoolin, Dublin 15 comprising the construction of a single storey warehouse with two storey office and single storey ESB substation including all associated site development works.
Reconciled event scale
5,654 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Park Developments (Dublin) Ltd
Unique event Works stated Scale Commenced
CN0142639FL BCMS owner-supplied export
Unit 3 Mooretown Logistics Park, Ballycoolin, Dublin 15 comprising the construction of a single storey warehouse with two storey office and single storey ESB substation including all associated site development works.
5,654 m²Builder named
19 May 2026
CN0100981FL BCMS open-data feed
Ellipse Infrastructural Works, Northwest Logistics Park, Ballycoolin, Dublin 15 comprising a new distributor road with footpaths & cycle track; SW & FW drains & watermains; utilities ducting; lighting & signage; and landscaping works.
Scale not statedBuilder not named
24 May 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 May 2026 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council · Planning ref WEBLRD6103/26-S3
Phase 3 - Construction of a residential development Block C. Block C is an eight floor building, including ground) which consists of 34 no. 1 bed and 19 no. 2 beds apartment units.
Reconciled event scale
53 units · 3,769 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
New build
13 May 2026 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council · Planning ref 2653/24, 3285/24 and 3286/24
The development will consist of modifications to planning permission granted under planning reference number 3705/20 (ABP reference number 311000-21). Modifications will include the the change of use of permitted internal communal amenity space to 1 no. 1-bed unit with private terrace at ground floor level, the addition of 1 no.2-bed unit at 3rd floor level, the addition of solar panels at roof level, an additional storey at fourth floor level providing 6no. units consisting of 2no. 1-bed apartments and 4no. 2-bed apartments, providing a total of 25no. apartments on the site, and all associated adjustments to the elevations and sections at Blackhorse Avenue, Dublin. The site bounds the north wall of Phoenix Park, which is a protected structure (reference number 6781)
Reconciled event scale
25 units · 2,879.6 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
New build
08 May 2026 · Commenced
1 unique event
Barraduff, Kerry · Kerry County Council · Planning ref 25/60229
The proposed works consist of the construction of 27 residential units contained within 5 no. blocks – (i) Block A: comprising of a 4-no. unit terrace of residential dwellings, (ii) Block B-C: comprising of a 5-no. unit terrace block of residential dwellings (iii) Block B-F: comprising of a 2-no. unit semi-detached block of residential dwellings, (iv) Block C-B-C: comprising of a 8-no. unit terrace block of residential dwellings (v) Block E: Comprising of a 8-no. unit apartment block as well as 1no. combined bin & bike store structure, and all associated site and ancillary works, which form part of an overall residential development at Shronedarragh, Barraduff, Co. Kerry. This includes the provision of 50no. car parking spaces, pedestrian, and alterations to existing vehicular site entrances to the south (located off an existing development internal road network), pedestrian crossings, development signage, public lighting, boundary treatments, landscaping, public open spaces, and all ancillary site development works at Shronedarragh, Barraduff, Co. Kerry.
Reconciled event scale
27 units · 3,159.6 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
08 May 2026 · Commenced
1 unique event
Celbridge, Kildare · Kildare County Council · Planning ref 23/1057
28 No Dwellings at 17-44 (Inc ) Donaghcumper Gate, Celbridge, County Kildare.
Reconciled event scale
28 units · 2,767.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
28 Apr 2026 · Commenced
1 unique event
Letterkenny, Donegal · Donegal County Council · Planning ref 2462160
Construction of 21 No. Dwelling Houses
Reconciled event scale
21 units · 2,621.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
28 Apr 2026 · Commenced
1 unique event
Clonmel, Tipperary · Tipperary County Council · Planning ref 2560701
Build 21 dwelling houses
Reconciled event scale
21 units · 2,310 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed