Commencement notice group

Commercial commencement notices — Belview Port

Belview Port, Kilkenny

2 separate notices · latest notified commencement 10 Jun 2026 · planning reference supplied

Source notices
2
Latest notified commencement
10 Jun 2026
Latest notice
28,498 m²
Planning references supplied
2460103
Public location
Belview Port, Kilkenny

Public source geography

Site location

Public site / locality
Belview Port, Kilkenny
County
Kilkenny

Public site labels seen across the notices

  • Gorteens, Belview, Co

Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Application details, the decision and any documents published by the authority are available in the official planning file.

  • Official planning file Application details, decision and available documents Kilkenny County Council · reference 2460103 Official council planning portal checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference2460103

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0133375KK BCMS owner-supplied export

Phase 1 Site Enabling, Earthworks, Site Investigation (Sept- Dec 2025), no building works. Phase 2 Proposed Plasterboard Production facility, Storage Buildings, Office and Welfare facilities, drainage and associated Site Works (Jan-Dec 2026).

22,400 m² · stated on this notice

Planning reference 2460103 Builder stated: Castle Gypsum Ltd Developer stated: Castle Gypsum Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.